Transcription of Axlebox Condition Monitoring – Hot Axlebox …
1 Railway Group Standard GE/RT8014 Issue Two Date June 2011 Axlebox Condition Monitoring Hot Axlebox detection Synopsis This document mandates requirements for rolling stock and infrastructure subsystems to be applied in the design of new or altered rolling stock for the detection of hot axleboxes, by trackside hot Axlebox detectors (HABDs) and onboard axle bearing Monitoring systems. Copyright in the Railway Group Standards is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group Standard (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. RSSB Members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited.
2 In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group Standards, Rail Safety and Standards Board Limited accepts no responsibility for, and excludes all liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from Railway Group Standards may be reproduced. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited Uncontrolled When Printed Document comes into force and supersedes GERT8014 Iss 1 on 03/09/2011 Amendments to this document are published on RSSB Standards Catalogue Page 2 of 12 RSSB Railway Group Standard GE/RT8014 Issue Two Date June 2011 Axlebox Condition Monitoring Hot Axlebox detection Issue record Issue Date Comments One June 2001 Original document Supersedes GM/RT2242, GM/RT2243, GM/TT0142, GO/OP0006 and GO/RT3207 Two 04 June 2011 Replaces issue one Revised to align with BS EN 15437-1.
3 2009 Revisions have not been marked by a vertical black line in this issue because the document has been revised throughout Superseded documents The following Railway Group documents are superseded, either in whole or in part as indicated: Superseded documents Sections superseded Date when sections are superseded GE/RT8014 issue one June 2001 Hot Axle Bearing detection All 03 September 2011 GE/RT8014 issue one ceases to be in force and is withdrawn as of 03 September 2011. Supply The authoritative version of this document is available at Uncontrolled copies of this document can be obtained from Communications, RSSB, Block 2, Angel Square, 1 Torrens Street, London EC1V 1NY, telephone 020 3142 5400 or e- mail Other Standards and associated documents can also be viewed at Uncontrolled When Printed Document comes into force and supersedes GERT8014 Iss 1 on 03/09/2011 Amendments to this document are published on RSSB Standards Catalogue RSSB Page 3 of 12 Railway Group Standard GE/RT8014 Issue Two Date June 2011 Axlebox Condition Monitoring Hot Axlebox detection Contents Section Description Page Part 1 Purpose and Introduction Purpose Introduction Approval and authorisation of this document 5 Part 2 Requirements for the rolling Stock Subsystem The rolling stock interface for hot Axlebox detection The rolling stock interface to infrastructure rolling stock fitted with onboard axle bearing Monitoring system 6 Part 3 Requirements for the Infrastructure Subsystem The
4 Infrastructure interface to rolling stock Provision of information on trackside HABDs 7 Part 4 Requirements for the Infrastructure Manager Requirements when trackside HABDs are out of service 8 Part 5 Application of this document Application - infrastructure managers Application - railway undertakings Health and safety responsibilities 10 Definitions 11 References 12 Uncontrolled When Printed Document comes into force and supersedes GERT8014 Iss 1 on 03/09/2011 Amendments to this document are published on RSSB Standards Catalogue Page 4 of 12 RSSB Railway Group Standard GE/RT8014 Issue Two Date June 2011 Axlebox Condition Monitoring Hot Axlebox detection Part 1 Purpose and Introduction Purpose This document mandates requirements for rolling stock and infrastructure subsystems to be applied in the design of new or altered rolling stock for the detection of hot axleboxes, by trackside hot Axlebox detectors (HABDs) and onboard axle bearing Monitoring systems.
5 Introduction Background The implementation of the Technical Specifications for Interoperability (TSIs) mandated through a series of European Directives has resulted in a review of all requirements mandated in Railway Group Standards. Under the Strategy for Standards Management, RSSB has given a commitment to review all of its standards with a view to mandating only those requirements that define the interface and the need for cooperation between different categories of duty holder to manage risk safely. A review of the requirements set out in standards associated with hot Axlebox detection has resulted in a revision of this Railway Group Standard. GE/RT8270 mandates requirements and responsibilities for the assessment of compatibility between infrastructure and rolling stock. Where existing infrastructure has not been assessed as conforming to the applicable Infrastructure TSIs, conformity with the requirements of GE/RT8014 is a method of demonstrating compatibility between rolling stock and hot Axlebox detection systems.
6 The requirements in the TSIs for Axlebox Condition Monitoring are supported by BS EN 15437-1:2009. To align with Europe the relevant parts of BS EN 15437-1:2009 that are appropriate for GB are incorporated within this document. Principles The requirements of this document are based on one or more of the following principles: a) This document mandates those requirements that define the interface and the need for cooperation between different categories of duty holder to manage risk safely. b) This document mandates requirements that are necessary to support an open point in a TSI and meet an essential requirement of the relevant European Directive. Support to essential requirements The European Directives applicable to interoperability mandate that each TSI is required to address a number of essential requirements. In supporting specific open points in rolling Stock TSIs, including the as yet unpublished Conventional Rail Locomotives and Passenger rolling Stock TSI, the essential requirements set out in are addressed.
7 Uncontrolled When Printed Document comes into force and supersedes GERT8014 Iss 1 on 03/09/2011 Amendments to this document are published on RSSB Standards Catalogue RSSB Page 5 of 12 Railway Group Standard GE/RT8014 Issue Two Date June 2011 Axlebox Condition Monitoring Hot Axlebox detection The Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community contains within Annex 3 Essential Requirements the following relevant essential requirements: 1. General requirements Safety The design, construction or assembly, maintenance and Monitoring of safety critical components, and more particularly of the components involved in train movement must be such as to guarantee safety at the level corresponding to the aims laid down for the network, including those for specific degraded situations.
8 Reliability and availability The Monitoring and maintenance of fixed or moveable components that are involved in train movements must be organised, carried out and quantified in such a manner as to maintain their operation under the intended conditions . Technical compatibility The technical characteristics of the infrastructure and fixed installations must be compatible with each other and with those of the trains to be used on the rail system . Supporting documents The following Railway Group document supports this Railway Group Standard: GE/GN8614 Guidance on Axlebox Condition Monitoring Hot Axlebox detection Approval and authorisation of this document The content of this document was approved by rolling Stock Standards Committee on 21 January 2011. This document was authorised by RSSB on 15 March 2011. Uncontrolled When Printed Document comes into force and supersedes GERT8014 Iss 1 on 03/09/2011 Amendments to this document are published on RSSB Standards Catalogue Page 6 of 12 RSSB Railway Group Standard GE/RT8014 Issue Two Date June 2011 Axlebox Condition Monitoring Hot Axlebox detection Part 2 Requirements for the rolling Stock Subsystem The rolling stock interface for hot Axlebox detection rolling stock as a minimum shall: a) Be designed in accordance with the rolling stock requirements for the target zone set out in clause of BS EN 15437-1:2009.
9 Or b) Be fitted with an onboard axle bearing Monitoring system which shall monitor all of the affected axle journal bearings. rolling stock that have an operating speed equal to or greater than 250 km/h shall be fitted with an onboard axle bearing Monitoring system which shall monitor all of the axle journal bearings. The rolling stock interface to infrastructure rolling stock shall be designed in accordance with the rolling stock prohibited zone requirements set out in clause of BS EN 15437-1:2009, and have either: a) No heat source, other than that generated by an in-service axle journal bearing, located within the boundaries of the prohibited zone. Or b) Thermal shielding of any heat source, other than that generated by an in-service axle journal bearing, located within the boundaries of the prohibited zone. To facilitate the setting of temperature alarm levels for trackside HABDs, the railway undertaking shall make available to the infrastructure manager when requested, the normal maximum temperatures of the target zones for the rolling stock that they operate (see ).
10 rolling stock fitted with onboard axle bearing Monitoring system The onboard axle bearing Monitoring system shall be set to initiate an alarm to indicate that acceptable conditions are exceeded. The conditions that trigger alarms shall be determined and set by the railway undertaking responsible for the rolling stock on which the onboard axle bearing Monitoring system is fitted. When an alarm is triggered, the onboard axle bearing Monitoring system shall provide an indication of which axle journal bearing(s) triggered the alarm and shall initiate the following actions: a) On passenger carrying rolling stock the driver shall be alerted. b) On non-passenger carrying rolling stock either the driver shall be alerted or the train brakes shall be automatically applied to bring the train to a stand in a controlled manner. Uncontrolled When Printed Document comes into force and supersedes GERT8014 Iss 1 on 03/09/2011 Amendments to this document are published on RSSB Standards Catalogue RSSB Page 7 of 12 Railway Group Standard GE/RT8014 Issue Two Date June 2011 Axlebox Condition Monitoring Hot Axlebox detection Part 3 Requirements for the Infrastructure Subsystem The infrastructure interface to rolling stock Trackside HABDs shall be designed to: a) Meet the requirements of the following clauses from BS EN 15437-1:2009 for.