Example: tourism industry

Concrete Mix Selector Guide - QUIKRETE

Concrete Mix Selector GuideFor SPEC DATA and Guide Specification documents on all our Commercial Grade products, please visit our On the Job section at Concrete (No. 1004-51) Concrete Mix(No. 1101) QUIKRETE 5000(No. 1007-80) Crack Resistant(No. 1006)Fast-Setting(No. 1004)ASTMASTM C 387 ASTM C 387 ASTM C 387 ASTM C 387 ASTM C 928 R-3 Structural Concrete mix Normal setAttributesConcrete 4000 PSI @ 28 days 1500 PSI @ 3 daysStrengths High early strength gain 10-12 hr walk-on time 5000 PSI @ 28 days 1500 PSI @ 1 day Crack resistant Air entrained Improved workability Normal set 4000 PSI @ 28 days 1500 PSI @ 3 days Sets posts without mixing Sets in 20-40 min. 4000 PSI @ 28 days Sets in 25-45 min. 7000 PSI @ 28 days 3000 PSI @ 3 hoursPatios, Sidewalks, ApronsCold Weather UseSetting PostsSetting Posts w/o MixingStepsColumnsWallsCurbsAir Conditioner PadsFloorsDeck SupportsBridge Deck RepairsConcrete Parking LotsLoading DocksRapid Structural RepairApplicationWidespread UseHigh Strength EarlierResists Cracking& SpallingSets PostWithout MixingRapid HardeningStructural Concret

Concrete Mix Selector Guide For SPEC DATA and Guide Specification documents on all our Commercial Grade products, please visit our “On the Job” section at www.quikrete.com

Tags:

  Guide, Concrete, Selector, Quikrete, Concrete mix selector guide

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Concrete Mix Selector Guide - QUIKRETE

1 Concrete Mix Selector GuideFor SPEC DATA and Guide Specification documents on all our Commercial Grade products, please visit our On the Job section at Concrete (No. 1004-51) Concrete Mix(No. 1101) QUIKRETE 5000(No. 1007-80) Crack Resistant(No. 1006)Fast-Setting(No. 1004)ASTMASTM C 387 ASTM C 387 ASTM C 387 ASTM C 387 ASTM C 928 R-3 Structural Concrete mix Normal setAttributesConcrete 4000 PSI @ 28 days 1500 PSI @ 3 daysStrengths High early strength gain 10-12 hr walk-on time 5000 PSI @ 28 days 1500 PSI @ 1 day Crack resistant Air entrained Improved workability Normal set 4000 PSI @ 28 days 1500 PSI @ 3 days Sets posts without mixing Sets in 20-40 min. 4000 PSI @ 28 days Sets in 25-45 min. 7000 PSI @ 28 days 3000 PSI @ 3 hoursPatios, Sidewalks, ApronsCold Weather UseSetting PostsSetting Posts w/o MixingStepsColumnsWallsCurbsAir Conditioner PadsFloorsDeck SupportsBridge Deck RepairsConcrete Parking LotsLoading DocksRapid Structural RepairApplicationWidespread UseHigh Strength EarlierResists Cracking& SpallingSets PostWithout MixingRapid HardeningStructural Concret


Related search queries