Example: dental hygienist

TABLE OF CONTENTS Interiors Library

TABLE OF CONTENTSI nteriors TitleIssueDateSection DescriptionDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS000101 Project Title Page03/17 Project Manual title Page02/12 For seals of design professionals on Project of Drawing Sheets08/10 List of of Schedules08/10 For a list of separately bound for Bids08/10 For use on public for Prequalification of Bidders08/10 For use on public to Bid08/10 For use on private for Qualifications02/12 For use on public to Bidders08/10 Incorporates AIA A701 by Instructions to Bidders08/10 For use with AIA Meetings08/10 Sets date, time, place, and terms for Substitution Procedures08/10 Substitution procedures during Schedules09/16 Preliminary Condition Information08/10 References documents for survey and Hazardous Material Information08/10 References documents for existing Data06/17 References documents for geotechnical Application08/10 Indicates responsibility for building Form - Stipulated Sum (Single-Prime Contract)12/17 Fixed price, single Form - Stipulated Sum (Multiple-Prime Contract)12/17 Fixed price, multiple Form - Construction Management (Single-PrimeContract)12/17 Fixed price, construction management, Form - Construction Management (Multiple-PrimeContract)12/17 Fix

TABLE OF CONTENTS Interiors Library Section No. Section Title Issue Date Section Description ... 081216 Aluminum Frames 06/14 Interior frames for wood or aluminum doors and glazing in gypsum-board partitions. U 081416 Flush Wood Doors 12/17 Wood-veneer, hardboard, and plastic-laminate-

Tags:

  Section, Library, Content, Table, Aluminum, Interior, 012816, 081216 aluminum, Table of contents interiors library, Table of contents interiors library section

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of TABLE OF CONTENTS Interiors Library

1 TABLE OF CONTENTSI nteriors TitleIssueDateSection DescriptionDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS000101 Project Title Page03/17 Project Manual title Page02/12 For seals of design professionals on Project of Drawing Sheets08/10 List of of Schedules08/10 For a list of separately bound for Bids08/10 For use on public for Prequalification of Bidders08/10 For use on public to Bid08/10 For use on private for Qualifications02/12 For use on public to Bidders08/10 Incorporates AIA A701 by Instructions to Bidders08/10 For use with AIA Meetings08/10 Sets date, time, place, and terms for Substitution Procedures08/10 Substitution procedures during Schedules09/16 Preliminary Condition Information08/10 References documents for survey and Hazardous Material Information08/10 References documents for existing Data06/17 References documents for geotechnical Application08/10 Indicates responsibility for building Form - Stipulated Sum (Single-Prime Contract)12/17 Fixed price, single Form - Stipulated Sum (Multiple-Prime Contract)12/17 Fixed price, multiple Form - Construction Management (Single-PrimeContract)12/17 Fixed price, construction management, Form - Construction Management (Multiple-PrimeContract)12/17 Fixed price, construction management, Form - Cost-Plus-Fee (Single-Prime Contract)

2 12/17 Cost plus, with or without guaranteed Security Forms12/17 References AIA Form12/17 Attachment for Bid Prices Form12/17 Attachment for Bid Form12/17 Attachment for Bid Schedule of Values Form12/17 Attachment for Bid Submittal Checklist02/12 Attachment for Bid of Award02/12 For notifying successful Forms12/17 References Agreement, General Conditions, andadministrative notifying bidders of 01 - GENERAL REQUIREMENTS010000 General Requirements09/15 Evaluations: Role of Division 1 Sections, theirpreparation and of the Work, phased construction,purchase contracts, Owner-furnished products,access to site, and work Contract Summary09/15 Responsibilities of each contract for the Work,coordination, and temporary facilities and for cash allowances including lump-sum,unit cost, contingency, and testing and = New U = UpdateCopyright 2017 - The American Institute of Architects (AIA)

3 Exclusively published and distributed by AVITRUD ecember 2017 Page 1 of 9 TABLE OF CONTENTSI nteriors TitleIssueDateSection Description012200 Unit Prices09/15 Provisions for unit for change-of-scope and cost-comparison type Procedures09/15 Procedural requirements for requests forsubstitutions during Modification Procedures09/15 Procedural requirements for changes to Procedures09/15 Administrative requirements for Contractor'sApplications for Management and Coordination09/15 Administrative requirements for project meetings;preconstruction, preinstallation, and projectcloseout conferences; RFIs; and project Web Progress Documentation09/15 Contractor's Construction Schedule including Ganttcharts and CPM schedules; and web-based Documentation09/15 Construction photographs, video recordings, andweb-based photographic Procedures09/15 Procedures for Action and Informational Submittalsincluding Delegated-Design Submittals andSubmittals Project Procedures06/13 General protection and work procedures forremodeling, renovation, repair, and Requirements09/15 Quality-assurance and -control requirements,special tests and inspections, and Contractor'squality-control definitions and terms; and acronyms andtrade names of associations, government agencies,and other entities referenced in Facilities and Controls09/17 Temporary utilities and facilities for constructionsupport, security, and Requirements09/15 Administrative and procedural requirements forproduct, material, and equipment selection andhandling; warranties.

4 And comparable requirements for product installation,cutting and patching, protection, field engineering,and progress Waste Management and Disposal09/16 Salvaging, recycling, and disposing of non-hazardous demolition and construction Procedures03/17 Contract closeout including Substantial Completionand Final Completion procedures, warranties, andfinal and Maintenance Data09/15 Emergency, operation, and maintenance manualsfor products and Record Documents09/15 Record record Drawings, Specifications, and and Training09/15 Administrative and procedural requirements forinstructing Owner's personnel in operation Design Requirements - LEED 2009 for NewConstruction and Major Renovations03/17 General requirements and procedures for LEED2009 for New Construction and Major Design Requirements - LEED v4 BD+C03/17 General requirements and procedures for LEED v4BD+ Design Requirements - LEED 2009 forCommercial Interiors03/17 General requirements and procedures for LEED2009 for Commercial Design Requirements - LEED v4 ID+C03/17 General requirements and procedures for LEED v4ID+ Design Requirements - LEED 2009 for Coreand Shell Development03/17 General requirements and procedures for LEED2009 for Core and Shell Design Requirements - LEED 2009 for Schools03/17 General requirements and procedures for LEED2009 for = New U =

5 UpdateCopyright 2017 - The American Institute of Architects (AIA)Exclusively published and distributed by AVITRUD ecember 2017 Page 2 of 9 TABLE OF CONTENTSI nteriors TitleIssueDateSection Design Requirements - IgCC06/14 General requirements and procedures for Design Requirements - ASHRAE requirements and procedures for Design Requirements - Green Globes06/14 General requirements and procedures for 02 - EXISTING CONDITIONS024119 Selective Demolition06/14 Demolition of selected portions of existingbuildings, structures, and associated 03 - CONCRETE033543 Polished Concrete Finishing06/14 Ground and polished concrete floor slabs, includingstained and polished Cement Underlayment06/16 Self-leveling, gypsum-cement-based Cement Underlayment06/14 Self-leveling, 04 - MASONRY042000 Unit Masonry03/15 CMU, brick, structural-clay facing tile.

6 And stone Unit Masonry06/14 Single-wythe CMU including decorative Unit Masonry06/14 Glass block installed with mortar, glass blockinstalled with spacers and sealant, and glass-blockgrid 05 - METALSU055000 Metal Fabrications12/17 Metal items (not sheet metal) made from iron andsteel shapes, stainless steel, and Pan Stairs06/17 Steel stairs with either metal pan or abrasive-finished metal Floor Plate Stairs06/17 Steel stairs with metal floor plate Grating Stairs06/17 Steel stairs with steel-bar-grating and Tube Railings03/16 Railings fabricated from aluminum , stainless-steel,and steel pipe and Gratings06/14 Metal bar gratings and Gratings06/14 Metal plank gratings and Metal Gratings06/14 Expanded metal gratings and Covers06/14 Spackled-seam and snap-together types, includingthose intended to be painted and those made formmade from decorative metals, such as stainlesssteel, bronze.

7 And Unit Covers09/16 Heating-cooling unit enclosures shop fabricatedfrom steel sheet to custom Metal06/14 Custom fabrications from nonferrous and Metal Stairs03/17 Architectural steel Metal Spiral Stairs06/14 Steel and aluminum units with center column andradiating Metal Railings06/17 Ornamental metal railings assembled from eitherstandard or custom components and shapes. Alsoincluded are illuminated = New U = UpdateCopyright 2017 - The American Institute of Architects (AIA)Exclusively published and distributed by AVITRUD ecember 2017 Page 3 of 9 TABLE OF CONTENTSI nteriors TitleIssueDateSection Description057313 Glazed Decorative Metal Railings06/17 Glass- and plastic-supported railings, and post-supported railings with glass infill, both assembledfrom either standard or custom decorative metalcomponents and Formed Metal06/14 Miscellaneous decorative formed metal items thatare shop fabricated from metal sheet to 06 - WOOD, PLASTICS, AND COMPOSITES061000 Rough Carpentry12/16 Wood framing, furring, frounds, nailers, Rough Carpentry03/17 Minor wood framing, furring, grounds, nailers, Finish Carpentry06/17 Exposed and Finish Carpentry12/17 Exposed and Architectural Woodwork06/17 Trim, door frames, shutters, and ornamental Architectural Woodwork06/17 Trim, cabinets, tops, paneling, stairs.

8 Andornamental Architectural Cabinets06/17 Custom-made veneer-faced Architectural Cabinets06/17 Custom-made plastic-laminate and Rail Wood Paneling06/17 Solid-wood and veneered stile and rail paneling;transparent finished and opaque Wood Paneling12/15 Veneer-faced flush Wood Paneling12/15 Plastic-laminate-faced flush Woodwork06/17 Miscellaneous shop-assembled woodwork Paneling06/14 Plastic paneling for utilitarian Reinforced Gratings02/12 Fiberglass bar gratings and 07 - THERMAL AND MOISTURE PROTECTION079200 Joint Sealants06/14 Elastomeric joint sealants including, silicone,urethane, STPE, polysulfide, butyl, and Joint Sealants06/14 For use in interior sound-rated 08 - OPENINGSU081113 Hollow Metal Doors and Frames12/17 Hollow-metal doors and frames for commercial andresidential Metal Fire Doors12/17 Horizontally sliding doors of composite, hollow-metal.

9 And tubular-frame Metal Frames12/17 Hollow-metal frames for commercial and Frames06/14 interior frames for wood or aluminum doors andglazing in gypsum-board Wood Doors12/17 Wood-veneer, hardboard, and plastic-laminate-faced flush wood and Rail Wood Doors12/17 Stock and custom stile and rail wood doors,included fire-rated Doors and Frames12/17 Wall and ceiling Counter Doors12/17 Overhead-coiling galvanized-steel, stainless-steel,and aluminum curtain Coiling Doors12/17 Galvanized-steel, stainless-steel, and aluminumcurtain Coiling Grilles06/16 Open-curtain and closed-curtain Sound Control Door Assemblies11/11 Assemblies consisting of steel doors, steel frames,and sound control = New U = UpdateCopyright 2017 - The American Institute of Architects (AIA)Exclusively published and distributed by AVITRUD ecember 2017 Page 4 of 9 TABLE OF CONTENTSI nteriors TitleIssueDateSection Sound Control Door Assemblies06/14 Assemblies consisting of wood doors, steel frames,and sound control Doors03/17 Accordion and panel folding doors, metal bifolddoors, bifold mirror doors, and fire-rated Entrances and Storefronts09/16 aluminum storefront systems, entrance doors, Entrances and Storefronts06/14 All-glass entrance doors and hardware, sidelights,and Entrances09/16 aluminum entrance doors and Entrances12/17 All-glass entrance doors and hardware, Care Unit/Critical Care Unit (ICU/CCU)

10 Entrances12/16 Manual sliding, swinging, and swinging/foldingentrance assemblies primarily for individual special-care Hardware12/17 For specifying door hardware by using a schedulethat names products or indicates Hardware (Descriptive Specification)06/17 For specifying door hardware by using a schedulethat includes nonproprietary product , laminated, and insulating Glass Glazing06/14 Patterned, enameled, acid-etched, sandblasted, andlaminated glass with integral decoration, and glasswith film , silvered flat glass mirrors includingannealed monolithic, film-backed, laminated, Glazing06/14 Special tempered glass, film-faced and laminatedceramic glazing, laminated glass with intumescentlayers, and gel-filled 09 - Vapor Emission Control12/14 Membrane-forming systems that reduce the rate ofmoisture vapor emission through interior Metal Framing12/15 Steel framing for gypsum board and plasterpartitions and Plastering06/14 Gypsum plaster on expanded-metal lath, unitmasonry, and Veneer Plastering03/16 Applied on gypsum base panels, unit masonry.


Related search queries