Example: quiz answers

MPW&C Project List - mobilepipewrappers.com

12766 Violet Road Adelanto, CA 92301 Ph: (760) 246 4707 Fax: (760) 246 4348 Completed Projects 1. 800 North Aqueduct Extension, Central Utah Water Conservancy District CWP Date: July 2010 October 2010 Customer: Northwest Pipe Co., Adelanto, CA Description: 36 & 48 pipe, coated with Life Last Durashield 210 polyurethane per AWWA C222 2. Utah Lake Spanish Fork to Provo Canal, Central Utah Water Conservancy District Date: September 2010 Customer: Northwest Pipe Co., Adelanto, CA Description: 6 to 42 pipe spools, Devoe 233H epoxy lined and wasser moisture cure zinc and urethane coated 3. Folsom Dam / NATOMA Relocation Bureau of Reclamation Date: October 2009 January 2010 Customer: Imperial Pipe, Riverside CA Description: 2,000 Lf of 48 pipe lined and coated with Ameron Amerlock 2 epoxy per AWWA C210 4. Provo Reservoir Canal Pipeline / UDOT SR92 Project , Bureau of Reclamation Date: January 2010 March 2010 Customer: Northwest Pipe Co.

Description: 6” to 42” pipe spools, Devoe 233H epoxy lined and Wasser moisture cure zinc and urethane ... El Paso Energy Corporation ...

Tags:

  Corporation, Zinc, Wasser

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of MPW&C Project List - mobilepipewrappers.com

1 12766 Violet Road Adelanto, CA 92301 Ph: (760) 246 4707 Fax: (760) 246 4348 Completed Projects 1. 800 North Aqueduct Extension, Central Utah Water Conservancy District CWP Date: July 2010 October 2010 Customer: Northwest Pipe Co., Adelanto, CA Description: 36 & 48 pipe, coated with Life Last Durashield 210 polyurethane per AWWA C222 2. Utah Lake Spanish Fork to Provo Canal, Central Utah Water Conservancy District Date: September 2010 Customer: Northwest Pipe Co., Adelanto, CA Description: 6 to 42 pipe spools, Devoe 233H epoxy lined and wasser moisture cure zinc and urethane coated 3. Folsom Dam / NATOMA Relocation Bureau of Reclamation Date: October 2009 January 2010 Customer: Imperial Pipe, Riverside CA Description: 2,000 Lf of 48 pipe lined and coated with Ameron Amerlock 2 epoxy per AWWA C210 4. Provo Reservoir Canal Pipeline / UDOT SR92 Project , Bureau of Reclamation Date: January 2010 March 2010 Customer: Northwest Pipe Co.

2 , Adelanto, CA Description: 720 LF of 133 pipe, lined and coated with Life Last Durashield 210 polyurethane per AWWA C222 5. Lindenberger Road Project Eastern Municipal Water District Date: September 2007 Customer: West Coast Pipe Linings, Rialto CA Description: 9,200 LF of 37 7/8 pipe coated with 80 mil polyethylene tape wrapped per AWWA C214 6. Cawelo Pipeline Replacement, Chevron USA Date: June 2006 October 2006 Customer: Northwest Pipe Co., Adelanto, CA Description: 14,000 LF of 42 OD pipe, coated with Life Last Durashield 210 polyurethane and line with Devoe Devmat 101 epoxy. 7. Robert A. Skinner Filtration Plant, Metropolitan Water District of Southern California Date: May 2005 Current Customer: Ameron Water Transmission Group, Fontana, CA Description: 3,000 LF of 147 OD pipe, 600 LF of 98 OD pipe, and 1,200 LF of 62 OD pipe coated with coal tar enamel per AWWA C203 12766 Violet Road Adelanto, CA 92301 Ph: (760) 246 4707 Fax: (760) 246 4348 Completed Projects 8.

3 PG&E / Trigon EPC, Line #57C natural gas pipeline, Pacific Gas and Electric Date: February 2006 June 2006 Customer: Marubeni Itochu Tubulars America, Houston, TX Description: 36,000 LF of 24 OD pipe, coated with 40 mil Powercrete and epoxy lined with Valspar Flowliner 930HS. 9. Stock pipe for Oil field Service Date: March 2006 May 2006 Customer: Bakersfield Pipe & Supply Bakersfield, CA Description: Over 35 miles of 2 , 3 , 4 & 6 Pipe coated with Synergy coating. 10. Diemer Filtration Plant, Metropolitan Water District of Southern California Date: June 2005 Customer: Northwest Pipe Co., Adelanto, CA Description: 750 x od pipe, lined with coal tar epoxy per AWWA C210 standard. 11. Thornydale Reclaimed Water Booster Station, Tucson Water Department Date: January 2005 Customer: Imperial Pipe, Riverside CA Description: 12 to 36 pipe spools polyurethane coated per AWWA C222 and epoxy lined per AWWA C210 12.

4 Bayshore Blvd / Route 101, City of South San Francisco Date: February 2002 Customer: Ameron Water Transmission Group, Fontana, CA Description: 50 & 62 OD pipe coated with coal tar enamel per AWWA C203 13. P 192 Multi Product Refinery Interface FISC, Pearl Harbor, HI. US Navy Date: October 2005 Customer: Wilson Supply, Rancho Dominguez, CA Description: 1,200 LF of 8 pipe coated with zinc rich primer, epoxy intermediate coat, and polyurethane topcoat 14. City and County of San Francisco Hayward Fault Pipe Project Date: October 2002 January 2003 Customer: Northwest Pipe Co., Adelanto, CA Description: 45 ,55 ,61 and 67 OD pipe lined with 80 mil Endura Flex 1988 polyurethane per AWWA C222 and Epoxy coated per AWWA C210 12766 Violet Road Adelanto, CA 92301 Ph: (760) 246 4707 Fax: (760) 246 4348 Completed Projects 15. Yellowman Siphon Replacement, Navajo Nation.

5 Fruitland, New Mexico Date: December 2003 Customer: Ameron Water Transmission Group, Phoenix AZ Description: 37 7/8 OD pipe lined with coal tar epoxy per AWWA C210 and coated with Aluminum pigmented enamel. 16. La Paloma Generating Facility, McKittrick CA Date: November 2000 May 2001 Customer: Modern Continental Construction, Tarzana CA. Description: 6 thru 48 pipe and fittings lined and coated with Reilly s EP 10 hot service coal tar enamel and Devoe Devchem 253 epoxy lining. 17. City of San Diego, Torrey Santa Fe Project Date: December 2002 January 2003 Customer: West Coast Pipe Linings, Rialto CA Description: 25 OD pipe and fittings polyethylene tape wrapped per AWWA C214 18. Southern California Edison Eastern Hydro Region Plant 4 Date: January 2000 Customer: Northwest Pipe Co., Adelanto, CA Description: 49 7/8 OD pipe coated with coal tar epoxy per AWWA C210 19.

6 Olmstead Flowline Replacement Project , Central Utah Water Conservancy Date: January 2002 February 2002. Customer: Northwest Pipe Co., Adelanto, CA Description: 91 3/4 OD fabricated pipe spools lined with 40 mil Futura Protec II PW polyurethane 20. Zia Natural Gas, Ruidoso Downs, NM Date: July 2001 Customer: California Steel Industries Tubular Products, Fontana CA Description: 37,000 LF of 8 pipe coated with 50 mil Synergy & 1,000 LF of 8 Powercrete coated pipe 21. Oakland International Airport, Oakland CA Date: May 2001 Customer: Pacific Pipe Co., Oakland, CA Description: 6 , 8 , & 12 pipe and fittings epoxy lined for jet fuel service 22. Clearview Water Supply Project Clearview Reservoir, Alderwood Water & WW District of Washington Date: December 2001 to March 2002 Customer: West Coast Pipe Linings, Rialto CA Description: 25 , 31 7/8 , 37 7/8 & 40 7/8 od pipe and fittings polyethylene tape wrapped per AWWA C214 12766 Violet Road Adelanto, CA 92301 Ph: (760) 246 4707 Fax: (760) 246 4348 Completed Projects 23.

7 El Paso Energy corporation Phoenix Gas Distribution Line Customer: California Steel Industries Tubular Products, Fontana, CA Description: 16 OD pipe coated per AWWA C203 24. Hayden Udall Water Treatment Plant; City of Tucson AZ Date: September 2000 November 2000 Customer: Ameron Concrete and Steel Pipe Group, Fontana CA. Description: 61 7/8 od pipe polyurethane lined for potable water per AWWA C222 25. City of Bakersfield Date: May 1997 June 1997 Customer: Jiffco, Inc., Livermore, CA Description: 54 OD & 60 OD pipe coal tar epoxy lined per AWWA C210 and coated per AWWA C214. 26. State of California Department of Water Resources Date: January 2001 April 2001 Customer: Northwest Pipe Co., Adelanto, CA Description: 18,000 LF of 55 7/8 OD pipe coated per AWWA C203 27. State of California Department of Water Resources Date: June 1999 February 2000 Customer: Northwest Pipe Co.

8 , Adelanto, CA Description: 41,000 LF of 55 7/8 OD pipe coated per AWWA C203 28. Navy San Diego Tank Terminal Date: June 2002 Customer: McJunkin corporation , Benecia CA Description: 7,500 LF of pipe, epoxy lined for fuel service per Mil C 4556E 29. Metropolitan Water District Orange County Feeder Relocation Date: September 1999 Customer: Ameron Concrete and Steel Pipe Group, Fontana, CA Description: 38 OD pipe coated per AWWA C203 30. Southern Nevada Water Authority Raw Water Pumping Station Date: May 1999 December 1999 Customer: Ameron Concrete and Steel Pipe Group, Fontana, CA Description: 36 , 72 and 78 OD pipe lined and coated per AWWA C222 12766 Violet Road Adelanto, CA 92301 Ph: (760) 246 4707 Fax: (760) 246 4348 Completed Projects 31. Southern Nevada Water Authority Raw Water Pumping Station Date: June 1999 to January 2000 Customer: Northwest Pipe Co.

9 Adelanto, CA Description: 78 , 96 and 110 OD pipe lined and coated per AWWA C222 32. Devine A Reservoir, City of Tucson, AZ Date: March 2003 Customer: Northwest Pipe Co., Adelanto, CA Description: 18 through 42 diameter pipe and fabricated spools, lined with Devoe Bar Rust 233H epoxy and coated with Tnemec Epoxy and Urethane system 33. Olivenhain Pump Station, San Diego County Water Authority Date: July 2003 Customer: Ameron Water Transmission Group, Fontana, CA Description: 36 through 80 diameter pipe and fabricated spools, lined with Tnemec Pota Pox N140F epoxy and coated with inorganic zinc primer 34. New Century Energies / Public Service of Colorado Date: Feb 1999 April 1999 Customer: California Steel Industries Tubular Products, Fontana, CA Description: 35 miles of OD pipe coated with Synergy system


Related search queries