Example: bachelor of science

July 2009 BARREL HEATER - …

July2009 BARREL HEATERKITM elbourne Aluminiumand Iron Laceworkisproud to offer what webelieve to be the mostdurable and economicalbarrel heaterkit*on the airtight model combines heatresistant castings along with yourown44 gallonsteel drum*into a highlyefficient in the kit* is alarge well fitting airtight door,separateash cleanout door, legs, flue collar*and all nuts and these features with a down to earth price andyou have a combination that is tough too instructions and prices see over page.*Please note thekit does not include the & CFoundries Pty. 85 269 424 329 Trading AsMelbourne Aluminium & Iron Lacework452 Heidelberg Road, Fairfield, Victoria :039489 5100 Fax:039489 PLEASE READASSEMBLY INSTRUCTIONSSTEP 1:Position the barrelonitsend and centralize the door 2:Using a marker trace the inside edge where the door openingswill 3:Cut both openings with an appropriate cutting anacetylenetorch due to explosive gases that may be trapped inside thebarrel.

July 2009 BARREL HEATER KIT Melbourne Aluminium and Iron Lacework is proud to offer what we believe to be the most durable and …

Tags:

  2009, July, Heaters, Barrel, July 2009 barrel heater

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of July 2009 BARREL HEATER - …

1 July2009 BARREL HEATERKITM elbourne Aluminiumand Iron Laceworkisproud to offer what webelieve to be the mostdurable and economicalbarrel heaterkit*on the airtight model combines heatresistant castings along with yourown44 gallonsteel drum*into a highlyefficient in the kit* is alarge well fitting airtight door,separateash cleanout door, legs, flue collar*and all nuts and these features with a down to earth price andyou have a combination that is tough too instructions and prices see over page.*Please note thekit does not include the & CFoundries Pty. 85 269 424 329 Trading AsMelbourne Aluminium & Iron Lacework452 Heidelberg Road, Fairfield, Victoria :039489 5100 Fax:039489 PLEASE READASSEMBLY INSTRUCTIONSSTEP 1:Position the barrelonitsend and centralize the door 2:Using a marker trace the inside edge where the door openingswill 3:Cut both openings with an appropriate cutting anacetylenetorch due to explosive gases that may be trapped inside thebarrel.

2 Partially fillthe BARREL with water for safety during the cutting of the 4:With the door openings cut you are now able to reach the inside of the BARREL toattach the :Take extra care with this step as thedoor openings cutfrom Step 3 may be very sharp. To avoid possible injury lay a thick towel overthe inside edge of the BARREL whilst installing the legs to protectyourselffrom thetwolegs equally spaced toward the outer rimsof thedrum. Drill theholes and fit each 5:With the legs now installed place the flue collar at the rear of the BARREL . Mark theopening and cut. Drill holes and fit flue 6:Finally, reposition the door, mark the mounting holes,drill and HINTS on FITTING: Ensure bungs are removed from the drum whilst cutting the drum.

3 Remove flammable liquids or gases from the drum and ensure that it is 3. Ensure an approved 6" diameter flue is fittedwithaspark arrester and damper. Melbourne Aluminium & Iron Lacework recommends the use of a hearth under yourheater and the placement of a safety barrier to protect TRADE PRICE LISTall prices inc. GSTB arrel HEATER Kit*(Drum& Fluenot included)------------------$ Plate(50 x 27 x 5cm )not pictured------------------$ * Kit consists of one 49x 42 x 13cmMelbourne Aluminium & Iron LaceworkJuly2009


Related search queries