Example: confidence

3 Pipeline Crossings And Clearances

Found 3 free book(s)
24. Force Main Design. - WSSC Water

24. Force Main Design. - WSSC Water

www.wsscwater.com

1) Locate the force main as if it is a water pipeline, see requirements under Part One (Water), with the following exceptions. a) When adjacent or parallel to a water pipeline, design the force main in accordance with the requirements of the sewer pipelines, see Part Three, Section 3 (Pipeline Crossings and Clearances).

  Water, Clearance, Crossing, Pipeline, Pipeline crossings and clearances, Wssc water, Wssc

Union Pacific Railroad Public Projects Manual

Union Pacific Railroad Public Projects Manual

www.up.com

5.3 Temporary and Permanent Construction Clearances 5-27 5.3.1 Permanent Clearances 5-27 5.3.2 Permanent Vertical Clearance (Under an Overpass Grade Separation) 5-28 ... 15.4.1 Pipeline Crossings 15-70 15.4.2 Wireline Crossings 15-70 Section 16 Public Safety Initiatives 16-71 16.1 Crossing Assessment Process 16-71

  Clearance, Crossing, Pipeline, Pipeline crossings

Technical Guidelines - Water Corporation

Technical Guidelines - Water Corporation

www.watercorporation.com.au

3.2 Pipeline condition 9 3.3 Pipeline material 9 ... 8.1.2 Road crossings 56 8.14 Planting and removing trees 58 ... clearances etc required by other agencies. Liability Under Section 90 of the Water Service Act: A person must not drill, bore, excavate or use impact equipment

  Clearance, Crossing, Pipeline, 3 pipeline

Similar queries