WisDOT Bridge Manual Chapter 18 – Concrete Slab Structures

WisDOT Bridge Manual Chapter 18 – Concrete Slab Structures

wisconsindot.gov

Concrete slab structure types are not recommended over streams where the normal water freeboard is less than 4feet; formwork removal requires this clearance. When spans exceed 35 feet, freeboard shall be increased to 5 feet above normal water. All concrete slab structures are limited to a maximum skew of 30 degrees. Slab structures with

  Concrete, Formwork

03 35 00 - Concrete Finishing - Bay Area Rapid Transit

03 35 00 - Concrete Finishing - Bay Area Rapid Transit

webapps.bart.gov

formwork construction, concrete placement schedule, and formwork removal to ensure that surfaces to be blast finished are blasted at the same age for uniform results. c. Determine type of nozzle, nozzle pressure, and blasting techniques required to match the …

  Concrete, Formwork

5.51 ANCHORAGE TO CONCRETE CAST IN ANCHORS

5.51 ANCHORAGE TO CONCRETE CAST IN ANCHORS

dot.ca.gov

By definition, CI anchors are placed into the formwork before concrete placement and are thus cast-in. Advantages include accurate placement relative to rebar and design flexibility with a wide variety of anchor sizes, configurations, and lengths. Disadvantages include the need to maintain position during casting, adverse performance due to

  Concrete, Formwork

Code of Practice - Formwork - SafeWork NSW

Code of Practice - Formwork - SafeWork NSW

www.safework.nsw.gov.au

the formwork process e.g. electricians roughing in conduits, plumbers roughing in pipes or the installation of post tension cables, steel fixers, concrete placement and finishing trades, line pumps, satellites, etc.

  Code, Practices, Concrete, Formwork, Code of practice formwork