Example: bankruptcy

Replacement Cost V Reconstruction Cost V

Found 9 free book(s)
STANDARD SEWER AND WATER MAIN SPECIFICATIONS

STANDARD SEWER AND WATER MAIN SPECIFICATIONS

www.nyc.gov

51.22 Reconstruction of Existing Manholes V-83 51.23 Replacement Of Existing Manhole Frame And Cover V-85 51.31 Drop-Pipe Manholes V-87 51.41 Catch Basins V-93 51.42 Incremental Cost Of (Standard Type 3 Or Other Kind And Number) Catch V-99 Basin In Lieu Of (Standard Type 1 Or Standard Type 2 Or Other Kind And Number) Catch Basin

  Cost, Replacement, Reconstruction

Union Pacific Railroad Public Projects Manual

Union Pacific Railroad Public Projects Manual

www.up.com

Reimbursement of cost and expenses (Sec. 11), and insurance requirements for public projects (Sec. 11.5) Entry onto UP Right of Way property (Sec. 12) Surface replacement (Sec. 4.1); widening and reconstruction (Sec. 4.2); new and closures (Sec. 4.3 & 4.4), and private crossing to public (Sec. 4.5) Maintenance activities for existing at-grade

  Cost, Replacement, Reconstruction

Rev. Rul. 2001-60

Rev. Rul. 2001-60

www.irs.gov

reconstruction of push-up or natural soil greens is inextricably associated with the land and, therefore, the costs attributable to this land preparation are added to the taxpayer's cost basis in the land and are not depreciable. The costs of land preparation undertaken by a …

  Cost, Reconstruction

DEFINITIONS - FEMA

DEFINITIONS - FEMA

www.fema.gov

zones V, V1–V30, and VE. Coinsurance. A penalty imposed on the loss payment unless the amount of insurance carried on the damaged building is at least 80 percent of its replacement cost or the maximum amount of insurance available for that building under the NFIP, whichever is less. Co-insurance applies only to building coverage under the

  Definition, Cost, Replacement, Fema, Replacement cost

STANDARD PROCUREMENT DOCUMENT

STANDARD PROCUREMENT DOCUMENT

documents1.worldbank.org

Based and Cost-Based Selection (“QCBS”), Quality-Based Selection (“QBS”), Selection under a Fixed Budget (“FBS”), and Least-Cost Selection (“LCS”). When mandating the use of this SPD on the implementing agency, however, primary consideration should be given to the complexity and value of the assignment. 5.

  Cost

Updated June 29, 2018 - BNSF Railway

Updated June 29, 2018 - BNSF Railway

www.bnsf.com

Bridges Over BNSF: Construction, reconstruction, rehabilitation, repair, removal, and maintenance of bridges over BNSF railway lines by outside parties. Parallel Roads and Facilities: Construction, reconstruction, modification, removal, and maintenance of parallel roads or other public facilities (including multi-use trails)

  Updated, June, 2018, Reconstruction, Railways, Bnsf, Bnsf railway, Updated june 29

Climate Resiliency Design Guidelines

Climate Resiliency Design Guidelines

www1.nyc.gov

cost analysis methodology and projections on Cooling Degree Days and Dry Bulb temperatures. • March 2019: version 3.0 of the Guidelines was released with refinements, including an Exposure Screening Tool and a Risk Assessment Methodology. • September 2020: version 4.0 of the Guidelines released as a refinement of Version 3, including

  Cost

ORDER 5100.38D, Change 1

ORDER 5100.38D, Change 1

www.faa.gov

February 26, 2019 Order 5100.38D, Change 1 . o The Airport and Airway Extension Act of 2015 (Public Law 114-55) enacted September 30, 2015. o The Airport and Airway Extension Act of 2016 (Public Law 114-141) enacted

Short Term Medical Hospital & Surgical Plans

Short Term Medical Hospital & Surgical Plans

www.uhone.com

4 Hospital & Surgical Per Person Deductible (per term; max 2 per family) You pay up to: $5,000, $7,500 or $15,000 Coinsurance (% you pay after deductible, per term) You pay: 50% Coinsurance Out-of-Pocket Maximum (after deductible, per person, per term) You pay up to: $10,000 Maximum Benefit (per person, per term) We pay up to: $1 million Medical

Similar queries