Example: bachelor of science

1&( & GAS-FIRED Models STEAM BOILERS

PEG-E. GAS-FIRED . Models STEAM BOILERS . PEG075 EID. PEG112 EID. INSTALLATION, OPERATION &. PEG150 EID. MAINTENANCE MANUAL. PEG187 EID. PEG225 EID. PEG262 EID. PEG299 EID. MODEL. PEGEID. Electronic Intermittent Ignition Manufactured by: ECR International, Inc. 2201 Dwyer Avenue, Utica NY 13501. web site: P/N 240009937, Rev. D [04/30/2017]. DIMENSIONS. Figure 1 - Dimensions 25" A Depth C. Safety Relief Valve 2" NPT. 2" NPT. ". 16 " NPT. B 2" NPT. Plug 29". 2" NPT. 12 ". 5 ". 13 " Floor Table 1 - Physical Data Models 075 112 150 187 225 262 299. Width (A) 10 7/8" 14 1/8" 17 3/8" 20 5/8" 23 7/8" 27 1/8" 30 3/8". Height (B) 35 7/8". Depth (C) 28 3/8" 28 3/8" 29 3/8" 30 3/8" 30 3/8" 30 3/8" 30 3/8". Gas Connection Size (G) NPT NPT NPT NPT NPT NPT NPT. Flue Diameter 5" 5" 6" 7" 7" 7" 7". 2 P/N 240009937, Rev. D [04/30/2017]. BOILER RATINGS AND CAPACITIES. Table 2 Ratings and Capacities Natural Gas & Propane (LP).

1&( & GAS-FIRED STEAM BOILERS INSTALLATION, OPERATION & MAINTENANCE MANUAL P/N 240009937, Rev. D [04/30/2017] MODEL PEGEID Electronic Intermittent Ignition

Tags:

  Fired

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of 1&( & GAS-FIRED Models STEAM BOILERS

1 PEG-E. GAS-FIRED . Models STEAM BOILERS . PEG075 EID. PEG112 EID. INSTALLATION, OPERATION &. PEG150 EID. MAINTENANCE MANUAL. PEG187 EID. PEG225 EID. PEG262 EID. PEG299 EID. MODEL. PEGEID. Electronic Intermittent Ignition Manufactured by: ECR International, Inc. 2201 Dwyer Avenue, Utica NY 13501. web site: P/N 240009937, Rev. D [04/30/2017]. DIMENSIONS. Figure 1 - Dimensions 25" A Depth C. Safety Relief Valve 2" NPT. 2" NPT. ". 16 " NPT. B 2" NPT. Plug 29". 2" NPT. 12 ". 5 ". 13 " Floor Table 1 - Physical Data Models 075 112 150 187 225 262 299. Width (A) 10 7/8" 14 1/8" 17 3/8" 20 5/8" 23 7/8" 27 1/8" 30 3/8". Height (B) 35 7/8". Depth (C) 28 3/8" 28 3/8" 29 3/8" 30 3/8" 30 3/8" 30 3/8" 30 3/8". Gas Connection Size (G) NPT NPT NPT NPT NPT NPT NPT. Flue Diameter 5" 5" 6" 7" 7" 7" 7". 2 P/N 240009937, Rev. D [04/30/2017]. BOILER RATINGS AND CAPACITIES. Table 2 Ratings and Capacities Natural Gas & Propane (LP).

2 Heating Net AHRI Rating (2). Boiler Model Input No. of Vent Pipe Capacity STEAM , STEAM , AFUE, %. Number MBH (1) Sections Size MBH (1) MBH Sq. Ft. PEG075 EID 75 62 47 195 3 5". PEG112 EID 112 93 70 292 4 5". PEG150 EID 150 125 94 391 5 6". PEG187 EID 187 156 117 488 6 7". PEG225 EID 225 188 141 587 7 7". PEG262 EID 262 219 164 685 8 7". PEG299 EID 299 250 188 782 9 7". Heating Capacity and AFUE are based on DOE (Department of Energy) test procedures. 1. Input rating for sea level to 2,000 ft. above sea level. Altitudes over 2000 ft. above sea level, reduce input rate 4% for every 1000 ft. 2. Net AHRI STEAM ratings shown are based on a piping and pickup allowance of Consult manufacturer before selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc. 3 P/N 240009937, Rev.

3 D [04/30/2017]. TABLE OF CONTENTS. Important Safety 5 Introduction Boiler is designed for use in closed heating systems where Locating The 6 all STEAM is returned as condensate and make-up water is minimal. Boiler is not designed for or intended for use in Hydronic 8 open systems using 100% make-up water. Fresh Air For 1. Prior to Installation Verify correct boiler for type of gas being used Chimney And Vent Pipe natural or propane. See Rating Plate. Vent Damper Verify boiler size and dimensions. See Figure 1 and Table 1, page 2. Gas Supply Verify ratings and capacity data for natural gas. See Table 2. Electrical 2. Installation Requirements Operating Supply boiler with correct gas (natural or propane), fresh air for combustion, and suitable electrical supply. Operating Your Connect boiler to adequate venting and piping Checking And systems. Provide boiler with properly located and adjusted Start-Up thermostat.

4 General Installation of boiler in building under construction, use precaution to insure clean combustion air supply during construction process. Airborne particulate from construction materials can clog burner ports and cause incomplete Wire combustion and sooting. Complete all steps for safe and proper heating system Wire operation. Optional Hydronic 28. Appendix A - Vent 30. Appendix A - Vent Damper 31. KEEP THIS MANUAL NEAR BOILER. RETAIN FOR FUTURE REFERENCE. GAS fired STEAM BOILERS . Check our website frequently for updates: Information and specifications outlined in this manual in effect at the time of printing of this manual. ECR International reserves the right to discontinue, change specifications or system design at any time without notice and without incurring any obligation, whatsoever. 4 P/N 240009937, Rev. D [04/30/2017]. IMPORTANT SAFETY INFORMATION.

5 General Boiler and venting installation shall be completed by ! WARNING. qualified agency. Installing or venting a boiler or any other gas appliance with improper methods or materials could ! WARNING result in death or serious injury due to fire or to Fire, explosion, asphyxiation and electrical shock asphyxiation from poisonous gases such as carbon hazard. Improper installation could result in death monoxide which is odorless and invisible. or serious injury. Read this manual and understand all requirements before beginning installation. ! WARNING. Become familiar with symbols identifying potential Fire, explosion, asphyxiation hazard. Keep boiler hazards. area clear and free from combustible materials, gasoline and other flammable vapors and liquids. This is the safety alert symbol. Symbol alerts you to Modification, substitution or elimination of factory potential personal injury hazards.

6 Obey all safety messages equipped, supplied or specified components could following this symbol to avoid possible injury or death. result in death or serious injury. ! DANGER. Indicates a hazardous situation which, if not avoided, ! CAUTION. WILL result in death or serious injury. Laceration, burn hazard. Metal edges and parts may have sharp edges and/or hot. Use appropriate ! WARNING personal protection equipment to include safety Indicates a hazardous situation which, if not avoided, glasses and gloves when installing or servicing this could result in death or serious injury. boiler. Failure to follow these instructions could result in minor or moderate injury. ! CAUTION. Indicates a hazardous situation which, if not avoided, may result in minor or moderate injury. Installation shall conform to requirements of authority having jurisdiction or in absence of such NOTICE requirements to the National Fuel Gas Code, Used to address practices not related to personal ANSI 54.

7 Injury. Where required by authority having jurisdiction, installation shall conform to Standard for Controls and Safety Devices for Automatically fired BOILERS , ANSI/ASME CSD-1. Controls can be added to make this boiler CSD-1 compliant. Check with your local codes for requirements. Requirements for Commonwealth of Massachusetts: Boiler installation must conform to Commonwealth of Massachusetts code 248 CMR which includes but is not limited to installation by licensed plumber or gas fitter. 5 P/N 240009937, Rev. D [04/30/2017]. LOCATING THE BOILER. Locating the Boiler Figure 2 - Minimum Clearances To Combustible 1. Select level location as centralized with piping system, Construction and as near chimney as possible. 6 (152mm). 2. Place crated boiler at selected location. Remove all crate material. Please recycle responsibly. ! WARNING View from top of boiler Fire hazard.

8 Do not install boiler on combustible flooring or carpeting. Failure to follow these Rear instructions could result in death or serious injury. Opposite Side Control Side 3. Do not install boiler on carpeting. For installation 7 6 . on non-combustible floors only. For installation on (178MM) Boiler (152MM). combustible flooring, special base must be used. (See Replacement Parts Manual.). 4. Use metal shims under boiler base legs for final leveling if needed. 5. Install boiler in location that permits satisfactory Front combustion of gas, proper venting, and maintenance of ambient temperature at safe limits under normal conditions of use. Boiler location should not interfere with proper circulation of air. Introduce outside air if normal infiltration does not provide necessary ALCOVE. air. Fresh Air for Combustion on page 12. 6. Notify owner to keep air passages free of obstruction.

9 Ventilating and combustion air must enter boiler room without restrictions. Figure 3 - Draft Hood Installation Table 3 - Minimum Clearance Dimensions Top 6". Rear 6". Control Side 7". Opposite Side 6". Screw Front Alcove Flue/Vent 6". Connector Near Boiler Piping 1/2". 7. Install boiler so automatic gas ignition system components are protected from water (dripping, spraying, rain, etc.) during appliance operation and Draft Hood service. Draft Hood Installation ! WARNING. Asphyxiation, carbon monoxide hazard. Failure to follow these instructions could result in improper Top and side panels not shown for clarity. combustion and possible leakage of combustion products into the living space. 1. Slide draft hood over flue collector. Follow directions given in Figure 3. Attach draft diverter, and blocked vent switch. Mount vent damper. See 2. Through holes in jacket top, secure with 1 or 2 screws, "Connecting Vent Damper and Vent Connector" page 13.

10 Based on boiler size. See Wiring Diagrams pages 26 and 27. 6 P/N 240009937, Rev. D [04/30/2017]. LOCATING THE BOILER. ! DANGER Figure 4 - Pressuretrol Assemly Burn, scald hazard. Pressuretrol must be installed by a qualified service agency in accordance with manufacturer's instructions, all applicable codes and requirements of authority having jurisdiction. Failure to follow the information in these instructions exactly will result in death or serious injury. Qualified service agency is responsible for proper installation. A. Pressuretrol Assembly Installation Instructions: See Figure 4. B. 1. Attach pressuretrol assembly (A) to site glass assembly, using proper pipe sealant. 2. Remove pressuretrol cover. 3. Route wire harness through black plastic bushing (B). 4. Attach two wires. Wires are not polarity sensitive, can place on either terminal. 5. Replace pressuretrol cover.


Related search queries