Transcription of 2018-19 - Karnataka
1 COMMON SCHEDULE OF RATES. FOR ALL ESCOMs 2018-19 . (11 & 33 KV Systems). ( 15-12-2018). 1. COMMON SR 2018-19 (11 & 33 KV Systems). 2 COMMON SR 2018-19 (11 & 33 KV Systems). COMMON SCHEDULE OF RATES 2018-19 . (Effective from till further orders). PREFACE. Schedule of Rates (SR) are a set of information indicating Rates of Various Materials and Labour charges to be adopted for preparation of Estimates and DPRs. Material prices: Material prices in CSR 2018-19 are FORD (Free on Rail/Road) PRICES for delivery to stores and are inclusive of GST, Freight & Insurance.
2 Labour Charges: Labour Charges include agencies overhead charges, loss of man hours during non LC. period, stoppage of works due to rain and any such conditions. However statutory charges applicable like ESI, PF and GST etc., are not included. Special Locality Allowance (SLA) additional labour charges towards break down works, labour charges for working on hazardous installations, calamity works, Headload charges, etc., have to be included in the estimate as applicable depending on the type of contract, , labour award, Total turnkey, Partial turnkey, etc.
3 , After the formation of ESCOMs separate ESCOM wise SRs were being prepared and issued. In the monthly meeting held on Chaired by the Principal Secretary to Energy Dept, GoK wherein MD, KPTCL. and MD's of all ESCOM's were present, it was directed to explore the possibility of preparing a Common SR applicable to all the ESCOMs. Accordingly Common SR across all ESCOM's have been adopted as under a. 1st Common SR with effect from b. 2nd Common SR with effect from c. 3rd Common SR with effect from d. 4th Common SR with effect from e. 5th Common SR with effect from A Committee under the Chairmanship of MD, BESCOM was formed with the following members for framing CSR 2018-19 .
4 Name of Members 1 Sri. P Rajendra Cholan, Managing Director, BESCOM Chairman 2 Sri. Venkatesh Kumar, Director (Technical), BESCOM Members 3 Smt. Bharathi, Director (Technical), MESCOM Members 4 Sri. BT Prakash Kumar, Director (Technical), HESCOM Members 5 Sri. Vinod Havanagi, Director (Technical), GESCOM Members 6 Sri. Narasimhe Gowda, Director (Technical), CESC Members 7 Sri. Renu Prasad, CEE, T&P, KPTCL Members 8 Representative from IEEMA Members 9 Representative from Directorate of Economics and Statistics Members Representative of KSLECA was also invited as an invitee to the meeting.
5 The CSR 2018-19 Committee met on at Bengaluru and issued guidelines for framing of CSR. 2018-19 . The draft Common SR 2018-19 was prepared in accordance with the directions issued in the meeting 3. COMMON SR 2018-19 (11 & 33 KV Systems). and the Draft CSR 2018-19 was circulated among all ESCOMs. The ESCOMs were requested to furnish their comments and suggestions on the above. The second CSR 2018-19 meeting was held on at Bengaluru to discuss on the draft CSR 2018- 19 which included the suggestions made by other ESCOMs, was tabled for discussion before the following members.
6 Name of the Members 1 Smt. C. Shika, Managing Director, BESCOM Chairperson 2 Sri. G. Ashok Kumar, Director (Technical), BESCOM Member 3 Sri. Raghu Prakash, Director (Technical), MESCOM Member 4 Sri. Narasimhe Gowda, Director (Technical), CESC Member 5 Sri. Renu Prasad, CEE, T&P, KPTCL Member 6 Sri. K Narasimha Phani, Deputy Director (Economics & Statics) Member The methodology adopted for revising material and labour charges is as under. Methodology adopted for revising material prices Material Prices: Weighted Average rate of all ESCOM's for materials where the procurement rates are available from to The prevailing SR rates are updated using IEEMA PV formulae.
7 The PV Indices for January-2017 and the average of indices from July-2017 to June-2018 were considered for updating the rates using IEEMA. PV. Pro-rata rates on the basis of rates available for similar material. Worked out rate for the materials like Poles, Conductor & Line materials. Neighboring state rates for the materials having common specification. Market/Vendor Rates for remaining items. Independent Committee rates for RMUs and Transformers. KPWD Electrical Schedule of Rates. Existing CSR 2016-17 Rates. KPWD Civil Schedule of Rates.
8 Rates for 33kv System: Rates derived from weighted average of procurement rates and updated rates using IEEMA PV are considered for 33kv system works. Also KPTCL SR 2016 rates have been adopted for some of the materials. Scrap Materials: 1. The scrap rates are the disposal rates of BESCOM through MSTC. These rates are only indicative. 2. The scrap transformers of different make have different sizes of tanks, different weights of coils, cores etc., hence disposal of such scrap transformers have to be made on the basis of rates of individual parts instead of whole transformer.
9 Deletion of material: The prevailing CSR 2016-17 included some items which are not required to be used due to either becoming obsolete or change in the specifications. (Please see Pg No. 168). 4 COMMON SR 2018-19 (11 & 33 KV Systems). Materials Deleted: Some of the materials which are obsolete and some of the materials for which specifications are revised have been deleted. The list is furnished in the CSR 2018-19 vide Pg No. 167. 1. All Distribution Transformers which are below Star 1 (previous 4 Star rating). The MOP has directed that only Star 1 Transformers shall be used in rural areas and Star 2 in city area.
10 2. TC Structures and DP Structures: Consequent to increased weights of Star 1 & Star 2 Transformers existing structures have been revised and new Bill of Materials introduced. 3. Usage of flat armoured (strip) HT UG cable is discontinued as round armoured cables are more strong mechanically and can carry higher fault level current. 4. HT Metering cubicle with Load Break Switch, as consumers equipment shall not be integrated with ESCOM assets. 5. 11kV CTs of Class (only CTs of accuracy class and secondary 1 Amps have to be used). 6. Short Barrel Lugs/Terminals (only Long Barrel Lugs/Terminal have to be used for better electrical contact and mechanical strength).