Anchorage Zone Design and Detailing from Practical Perspective Teddy S. Theryo, Structures Design Office20192 Learning Objectives Background of Anchorage Zone Design Development of Proprietary Anchorages Case Study of Anchorage Zone Failure Local and General zones Anchorage Zone Design Methods Good Detailing Practice Design Examples3 Presentation Outline Introduction Case Study of Anchorage Zone Failure Development of PT Anchorages Design Methods for General Zone The Art of Proper Detailing Design Examples References4 Introduction Timeline of Anchorage Zone Design Development1855: St. VenantPrinciple1924: M rsch sTheory1932: Tesar, M Theory1935: Bortsch sTheory1949:Magnel sTheory 1953: Guyon sTheory1954: Leonhardt, Fritz Theory 1956: Bleich s and Sievers s Theory1960: Iyengar, SundaraRaja Theory1960: Sargious, M. Theory1960: J. Zielinski and Rowe of Cement and Concrete Association, UK. Conducted Laboratory Test. Two Reports and recommendations were published from this research : J.

stress pattern near the anchorage zone. For practical purposes the anchorage zone design is simplified from 3D to 2D. A single tendon jacking force could vary from 100 tons to about 1000 tons. Single PT anchorage has been studied both theoretically and experimentally. However, in reality multiple anchorages with different configurations and

Tags:

  Zones

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of 2019 Anchorage Zone Design and Detailing from Practical ...

1 Anchorage Zone Design and Detailing from Practical Perspective Teddy S. Theryo, Structures Design Office20192 Learning Objectives Background of Anchorage Zone Design Development of Proprietary Anchorages Case Study of Anchorage Zone Failure Local and General zones Anchorage Zone Design Methods Good Detailing Practice Design Examples3 Presentation Outline Introduction Case Study of Anchorage Zone Failure Development of PT Anchorages Design Methods for General Zone The Art of Proper Detailing Design Examples References4 Introduction Timeline of Anchorage Zone Design Development1855: St. VenantPrinciple1924: M rsch sTheory1932: Tesar, M Theory1935: Bortsch sTheory1949:Magnel sTheory 1953: Guyon sTheory1954: Leonhardt, Fritz Theory 1956: Bleich s and Sievers s Theory1960: Iyengar, SundaraRaja Theory1960: Sargious, M. Theory1960: J. Zielinski and Rowe of Cement and Concrete Association, UK. Conducted Laboratory Test. Two Reports and recommendations were published from this research : J.

2 Breen et. al. of University of Texas, Austin conducted Anchorage Zone research and Laboratory Tests as part of NCHRP Project 10-29. The recommendations of the research were adopted by AASHTO : St. Venant, M rsch s, Tesar s, Guyon s, Magnel s, and Leonhardt s work laid out the most significant foundations of Anchorage zone Design practices we are using St. VenantPrinciple (1855) The influence of stresses resulted by a local disturbed load in an elastic system dissipates rapidly with a distance d, where d is the depth of the member [14].6 Introduction Overview of PT Anchorage Design In post-tensioned prestressed concrete members, the prestress forces are directly applied to the end of the members with relatively very small mechanical anchorages and large forces. The PT concentrated force induces a complex 3D stress pattern near the Anchorage zone. For Practical purposes the Anchorage zone Design is simplified from 3D to 2D. A single tendon jacking force could vary from 100 tons to about 1000 tons.

3 Single PT Anchorage has been studied both theoretically and experimentally. However, in reality multiple anchorages with different configurations and cross sections exist. Improperly Design and Detailing of Anchorage zone can cause longitudinal and vertical cracks around Anchorage zone. 7 IntroductionExamples where the PT tendons are anchored at the end of girders 8 IntroductionExample of PT tendons are anchored at intermediate span and blisters9 Introduction DefinitionsAnchorage Zone / End Zone / Saint-VenantRegion: The volume of concrete through which the concentrated PT force is transferred to a section more or less has linear stress Zone: Rectangular prism of concrete surrounding and immediately ahead of bearing Zone: Region within which concentrated force spread out to a more linear stress distribution over the cross sectionLead Length / Transition Length: the length of equivalent / symmetrical prismBursting Force: Tension force perpendicular to the concentrated force axis in the equivalent prismSpalling Force: Tensile stresses along the loaded face of a beam induced by compatibility requirementSplitting Force: Tension force between two or more anchorages which could result in splitting cracksLongitudinal Edge Tension Force.

4 The tension force in the beam edge longitudinal direction due to eccentric load. 10 Introduction Section A -AIsometric of Anchorage zone deformed shape [17]11 Introduction 12 IntroductionLocal ZoneGeneral ZoneLocal and General Zone Limit13 IntroductionLocal and General Zone LimitLocal ZoneGeneral Zone14 IntroductionGrout tubeLocal zonespiral reinforcementAnchor head (wedge plate)BearingplateTrumpetDuctLocal Zone Confinement Reinforcement15 Introduction The Engineer of Record Overall Design General zone Design Approval of working drawings, general zone reinforcement, stressing sequence, tendon layout, Anchorage device and its local zone confinement reinforcementResponsibilities (LRFD )16 Introduction The Anchorage Device Supplier (Proprietary / Special Anchorage Device) Supply the Anchorage Device and its local zone confinement reinforcement Meet the efficiency test requirement (96% GUTS) as per LRFD Bridge Construction Spec. Meet the special Anchorage device acceptance test as per LRFD Bridge Construction (LRFD ) (cont.)

5 17 Anchorage Device acceptance test and efficiency test requirement of AASHTO LRFD Bridge Construction SpecificationsIntroduction18 Presentation Outline Introduction Case Study of Anchorage Zone Failure Development of PT Anchorages Design Methods for General Zone The Art of Proper Detailing Design Examples References19 Case Study of Anchorage Zone Failure Transverse tendon Anchorage zone failure due to poor Anchorage zone Design and detailingCracks20 Case Study of Anchorage Zone Failure Spalled concrete as a result of incorrect tie down rebar details in the curved tendon zone. The curved tendon has a very thin concrete duct21 Case Study of Anchorage Zone Failure Top slab cracks due to lack of longitudinal tie back reinforcementTop blisterTop deck cracks22 Case Study of Anchorage Zone Failure Top Blister and web cracks (1)Cracks23 Case Study of Anchorage Zone Failure Top blister and web cracks (2)CracksNotes: PT blister impacted web and resulted in web cracking24 Case Study of Anchorage Zone Failure Spalled concrete as a result of incorrect tie-down rebar details in the curve tendon zone of a blister with a thin concrete coverSpalled concreteBottom blisterPT duct25 Case Study of Anchorage FailureSpalled concretePROBLEMP rovide sufficient concrete over the duct to effectively transfer the compression struts C to tie down reinforcement (lower PT duct)Radial force Q is directly transferred to tie down reinforcementSOLUTION 2 TTTendonQAAPSOLUTION 1 TTTendonCC12 QSECTION A-AQTTR adialForceSpalledConcreteTendon26 Presentation Outline Introduction Case Study of Anchorage Zone Failure Development of PT Anchorages Design Methods for General Zone The Art of Proper Detailing Design Examples References27 Development of PT Anchorages The most common types of high strength prestressingsteel use in Post-tensioned wire strands ( , , and diameter)

6 , Grade strength bars, Grade 150 (not available in Florida)FDOT Standard Tendon sizes for strand system (FDOT IDS Index 21800 Series) Multi-strand system: 4, 7, 12, 15, 19, 27, and 31. PT bars diameter: 1 , 1 , 1 3/8 , 1 , 2 , 3 .Notes: diameter strands are commonly used in stay cables28 Development of PT Anchorages Overall view of the FreyssinetPT wire tendon from Anchorage to Anchorage . FreyssinetSystem was one of the earliest PT systems in the world. 29 Development of PT Anchorages 12/7 FreyssinetWire system5 Diameter5 FreyssinetWire System was one of the earliest proprietary mechanical PT Anchorage system (1930) 30 Development of PT Anchorages Freyssinetmulti-strand system31 Development of PT Anchorages 32 Development of PT Anchorages 33 Development of PT Anchorages 34 Development of PT Anchorages Duct TapeGrout Tube35 Development of PT Anchorages Grout Tube/VentDSI36 Development of PT Anchorages 37 Development of PT Anchorages 38 Development of PT Anchorages VSL Composite Anchorage System39 Development of PT Anchorages VSL PT Anchorage for flexible filler40 Development of PT Anchorages SDI PT Anchorage Systems41 Development of PT Anchorages TensaPT Anchorage System42 Development of PT Anchorages Concrete Strength Limit for Post-Tensioned StructuresAASHTO LRFD (8thEdition, 2017)Section : Limit of f cfor structural concrete from 4,000 psi to 10,000 Structures Design Guidelines (January 2018)SDG Section.

7 Limit of f cfor Prestressed Concrete from 5,000 psi (Class III) to 10,000 psi. 43 Development of PT Anchorages Concrete Strength Limit for Post-Tensioned Structures (cont.)Notes: Concrete strength is directly related to the size of bearing plates and local zone reinforcement. Typically tendons are stressed in a few days after concreting. 5000 psi concrete can reach about 4000 psi ( f c) in one or two days. Therefore, 5000 psi is the absolute minimum concrete strength recommended. Most proprietary PT Anchorage systems are designed for a minimum of 3500 psi to 4000 psi concrete strength. 44 Presentation Outline Introduction Case Study of Anchorage Zone Failure Development of PT Anchorages Design Methods for General Zone The Art of Proper Detailing Design Examples References45 Design Methods for General Zone Elastic Stress Analysis (M rsch, Guyon, Magnel, Leonhardt) Classical / Photo-elastic Strut and Tie Models (equilibrium based plasticity models) Approximate Method Deep Beam Analogy (Proposed by Gustave Magnelof Belgium) Combined MethodsNotes: Finite Element Method is not commonly used for General Zone Design (use as supplementary analysis for complex general zone) 46 Design Methods for General Zone Anchorage Zone Design Procedures Understanding the flow of stress distributions for different Anchorage configurations.

8 Design is based on the maximum jacking force ( ) Assume stiff bearing plate (square, rectangular, and circular shapes) Determine the bursting, spalling, splitting and longitudinal edge tension forces in both vertical and transverse directions (the concrete tensile strength shall be ignored). 47 Design Methods for General Zone Compute / estimate the tension forces based on simplified / Practical methods. Provide ample (robust) of reinforcement confinement and tension ties at the correct location to assure structural safety and serviceability. These reinforcement shall be provided in addition to the shear and torsion reinforcement required for the girder / beam Design . Good Detailing practices are the key to successful and safe Anchorage zone Zone Design Procedures (cont.) Stress(AASHTO Guide Spec. for Design and Construction of Segmental Concrete Bridges, 1stEdition, Section )Reinforcement for busting forces shall be designed based on maximum jacking force at time of stressing with allowable steel stressfs= fy( fy 60 ksi) Design Methods for General ZoneBursting Reinforcement and Resistance Factor (LRFD)LRFD Design force for post-tensioning Anchorage zones shall be taken as times the maximum jacking forceLRFD Factors for compression in Anchorage zones : Normal weight / lightweight concrete: Factor for tension in steel Anchorage zones : (?)

9 (Note: in the past = to has been used) Design Methods for General ZoneBursting Reinforcement Calculations (cont.)50 Design Methods for General Zoneb . dIsobars with the Value , where Ps ysoso Isobars: points of equal transverse stressesWhere: a=Bearing plate widthd=Member depthb=Member widthP=Concentrated Force=Isobars diagram for various values of a/d(Guyonand Tesar)Lessons Learned: The smaller a/dratios, the larger the bursting force51 Design Methods for General ZoneSince each proprietary system has its own Anchorage dimensions, shapes and the selected system is unknown during the Design phase, the best strategy: Select the smallest size of Anchorage from approved PT systems for computing bursting forces. Select the largest size Anchorage from approved PT systems for setting up anchorages layout and : The bearing plates must meet the edge distance and anchorages center to center for a particular system 52M rsch sTheory (1924)M rschtheory for concentric load follows parabolic stress trajectories distributed uniformly at distance d from the face.

10 M rschtheory was the earliest application of strut and tie model in computing the bursting force TbTb = P/(4d) (d-a) = P (1-a/d) Design Methods for General Zone53 Single Concentric Force0,5P0,4P0,3P0,2P0,1P000,5d0,4d0,3d0 ,2d0,1d0,10,20,30,40,50,60,70,91,00,8a/d + (max)y= 0y_+T0,100,20,30,40,50000y01/8d1/4d3/8d1 /2d5/8d3/4d7/8ddxdxayv0,0a/d=0,10,20,30, 40,50,60,70,80,9 Bursting ForcesTransverse Tensile Stresses syThe above diagrams were produced by Iyengar[16] Design Methods for General Zone54 Single Concentric ForceBursting Force Tb Fritz Leonhardt: E. M rsch:Principal Tension and Compression StressesTransverse Compressive and Tensile Stresses distributionDisturbed RegionBursting ForceTb= P (1 a/d) for a/d< = P (1 a/d) for a/d> Methods for General Zone55hPad/2d/2hdTTxCCTb= P (1 a/d) Guyon sMethod for Single Anchorage (Small Eccentric) Bursting Force:SymmetricalPrismNotes: small eccentric force when the center line of PT force falls inside the kern zone of the beam section Design Method for General Zone56 Single Anchorage (Large Eccentricity)Pd (2 -3a/d)354 (1 a/d)2 Mmaxd/2 PTCadT~d/2dFor large single eccentric force, use strut and tie or deep beam theoryDesign Method for General Zone 57 Guyon sTheory for Multiple Anchorages(1) Linear Distribution of PrestressingForceMultiple Forces Case 1If the PT force is applied by anchorages which are linearly distributed along the end of the member in a manner corresponding to the distribution of stress at the beam section (end of general zone) each anchorages is considered to consist of prism which is in equilibrium under the action of the PT force at one end and linear stress in the other end as shown below.