Example: bankruptcy

A!' /0# '-'+% D#/'%+ D 0 Installing Drainage …

Installing Drainage SystemsProper installation of Orion Drainage sys-tems is extremely important in assuring thatinstallations perform flawlessly for years. Supporting a Drainage SystemSince Polypropylene has a higher expan-sion rate than that of other materials, it cannotbe anchored to restrict movement from ther-mal expansion incurred from chemical reac-tions or the inadvertent dumping of hot waterinto the acid waste recommends the use of clevis orloop type pipe hangers. If split-ring or otherhanger types are used the hanger should bea size larger than the pipe being supportedso the polypropylene pipe is free to move.

Installing Drainage Systems Proper installation of Orion drainage sys-tems is extremely important in assuring that installations perform flawlessly for years.

Tags:

  System, Installing, Drainage, Installing drainage, Installing drainage systems

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of A!' /0# '-'+% D#/'%+ D 0 Installing Drainage …

1 Installing Drainage SystemsProper installation of Orion Drainage sys-tems is extremely important in assuring thatinstallations perform flawlessly for years. Supporting a Drainage SystemSince Polypropylene has a higher expan-sion rate than that of other materials, it cannotbe anchored to restrict movement from ther-mal expansion incurred from chemical reac-tions or the inadvertent dumping of hot waterinto the acid waste recommends the use of clevis orloop type pipe hangers. If split-ring or otherhanger types are used the hanger should bea size larger than the pipe being supportedso the polypropylene pipe is free to move.

2 (For example, if supporting 2" pipe, use 3"hangers, or when supporting 3" pipe, use4" hangers, etc.)Warnings: The use of uni-strut type hangers or anyhanger which relies on clamp tightness forsupport voids manufacturers warranty. Do not clamp a polypropylene pipe sys-tem tightly. It must be free to move. Recommended Hanger Spacing forOrion Polypropylene DrainageSystems Schedule 40 & Schedule 80*Pipe size, inches Hanger Spacing, feet 1 42435466686107127*Or per code. Recommended Hanger Spacing forOrion PVDF Drainage Systems*Pipe, size, inches Hanger spacing, feet1 *Or per SpecificationsPolypropylene Acid Waste Pipe manufac-tured from resin meeting ASTM D4101.

3 Pipemeets the dimensional tolerances of ASTMD2447. All pipe is supplied in 10' sections (20'optional). All pipe is pregrooved at the Pipe manufactured from resin meet-ing ASTM D3222. Pipe meets the dimensionaltolerances of ASTM D2447. All pipe is sup-plied in 10' sections (20' optional). All pipe ispregrooved at the factory. All PVDF pipe ismarked with UL 723 SpecificationsNo-Hub/Plain End Fittings Orion No-Hub/Plain End fittings meet or exceed ASTMF1412. The fittings are manufactured frompolyolefin material in accordance with ASTMD4101.

4 The outer band of each No-Hub/PlainEnd is 300 series stainless steel, and 5/16"bolts, nuts and washers plated to meet a 100hour salt spray test per ASTM Fusion Fittings Socket fusion sys-tems conform to ASTM F1412. Orion socketfusion fittings meet or exceed ASTM D2657standards. Polypropylene fittings are manufac-tured from polyolefin material in accordancewith ASTM D4101. PVDF fittings are manufac-tured from Kynar brand of PVDF resin meetingASTM Electrofusion Fittings OrionRionfuse fittings meet or exceed ASTM fittings are manufactured from poly-olefin material in accordance with ASTM D4101.

5 The molded coil is made of heavy gauge are not to be used at any time duringinstallation. Underground Installation of Orion Acid Waste SystemsThe trench as excavated for the pipe installationmust be free of loose stones, building materials oroutcroppings, and must provide minimum clear-ance around pipe of half the pipe diameter oneach side (horizontally) and one pipe diameterabove and below (vertically). The trench shall bebackfilled over the unexcavated base to a depth ofone pipe diameter with clean backfill. The backfillmaterial shall be free of stones and foreign matterand shall be capable of passing a No.

6 10 FITTINGSAcid Waste Piping SystemsAcid Waste Piping Acid Waste Piping Design DataDesign DataThe piping shall be installed over this mate-rial and tested in accordance with applicableplumbing testing, initial backfilling must be care-fully accomplished, still using No. 10 screenmaterial until fill surrounds the pipe. When theselected backfill meets a depth of one diameterover the pipe, then backfilling can proceed withnormal fill until complete. Fill shall be compact-ed using hand held compacting equipmentwhen fill is midway up the pipe, and again whenthe fill is over one diameter over the compacting equipment can beused after the initial backfill is ProceduresFully inspect the installed piping for evidenceof mechanical abuse and suspect the system into convenient test sections,not exceeding 1000 ft.

7 The piping should becapped off with an expandable plug at the endof the pipesection to be suggest that straight lengths of pipeshould be backfilled between the fittingsbeing tested, prior to fill the pipe section with water, takingcare to remove all trapped air in the air release valves in any high spots inthe system . Do not pressurize at this the pipe for at least one hour, to allowan equilibrium temperature to be check the system for leaks. If clear,check for and remove any remaining air fromthe the system to a suggested maxi-mum of 10 feet head by means of a standard10 foot standing water test using a 10-footvertical riser, or a low pressure hand the line at 10 feet of head pressure fora period of up to 8 hours, during which timethe water level should not change, (standingwater test) or the pressure gauge readingshould not change (hand pump test).

8 Acid Waste Piping SystemsOrion Fittings 26 Mechanical CouplingsPartMaterialTypeStandardSize," Galvanic ReactionOuter bandStainless steelAISI 304-2 BASTM A240 Bolt barStainless steelAISI 304-2 BASTM A240 Bolt*Carbon steel Cadmium plated with Grade 85/16-18x1/4 dichromate coating Nut*Carbon steel Cadmium plated with 5/16-18 dichromate coating Washers*Carbon steel Cadmium plated withdichromate coating 5/16 WeldingStainless steelAutomatic MIG Basically nilwith Tri-MixCoupling body: Made from thermoplastic resin. This material has similar chemical resistant properties as the pipe and fittingsmanufactured by Orion.

9 It has been selected because of its excellent ability to be used as a gasket. temp. brittleness(-76(F)D746 Vical softness point185(F (85(C)D1525 Flexural stiffness12,700 psiD747 Torsional stiffness14,900 psiD1043*Bolt, nut, washer are plated to meet 100 hour salt spray test per ASTM D117. Design DataDesign DataACID WASTE PIPINGIf there is a significant drop in pressure, or extended timesare required to achieve the desired pressure, either jointleakage has occurred or air is still trapped in the line. Inthis event, inspect for joint leaks.)))

10 If none are found,check for trapped air - this air must be removed prior tocontinuing the joints are found to be leaking, the system must be fullydrained and the joints repaired. Dry or marginal Rionfusejoints can be easily re-fused by following the proceduresdetailed in this catalog. Leaking joints can be backweldedif necessary. It should not be necessary to cut out joints,unless the joint haspreviously been overheated, contaminated, fractured orvery badly made in the first place. Where joints have tobe cut out and replaced, the procedures for field cuts andjoint installation detailed in this manual should be the 10 feet head test after repairing any leaking joints, following the procedure described : Tanks should not be pressure :This system was designed for acid waste of a gravitynature.