Example: biology

Acceptable Means of Compliance (AMC) and Guidance …

Annex II to ED Decision 2016/011/R Page 1 of 19 European Aviation Safety Agency Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Annex II (PART-145) to Commission Regulation (EU) No 1321/20141 Issue 2 Amendment 1 1 Commission Regulation (EU) No 1321/2014 of 26 November 2014 on the continuing airworthiness of aircraft and aeronautical products, parts and appliances, and on the approval of organisations and personnel involved in these tasks (OJ L 362, , p. 1), as last amended. 2 For the date of entry into force of this Issue, please refer to Decision 2016/011/R in the Official Publication of the Agency.

SECTION A — TECHNICAL REQUIREMENTS AMC 145.A.10 Scope GM 145.A.10 Scope ... Personnel requirements (Flight crew) AMC 145.A.30(j)(5) Personnel requirements ... Maintenance organisation exposition GM 145.A.70(a) Maintenance organisation exposition

Tags:

  Requirements, Flight, Organisation, Crew, Flight crew

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Acceptable Means of Compliance (AMC) and Guidance …

1 Annex II to ED Decision 2016/011/R Page 1 of 19 European Aviation Safety Agency Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Annex II (PART-145) to Commission Regulation (EU) No 1321/20141 Issue 2 Amendment 1 1 Commission Regulation (EU) No 1321/2014 of 26 November 2014 on the continuing airworthiness of aircraft and aeronautical products, parts and appliances, and on the approval of organisations and personnel involved in these tasks (OJ L 362, , p. 1), as last amended. 2 For the date of entry into force of this Issue, please refer to Decision 2016/011/R in the Official Publication of the Agency.

2 Annex II to ED Decision 2016/011/R Page 2 of 19 1) Table of contents is amended as follows: CONTENTS AMC General SECTION A TECHNICAL requirements AMC Scope GM Scope AMC Application AMC Terms of approval AMC (a) Facility requirements AMC (b) Facility requirements AMC (d) Facility requirements AMC (a) Personnel requirements AMC (b) Personnel requirements AMC (c) Personnel requirements AMC (d) Personnel requirements AMC1 (e) Personnel requirements AMC2 (e) Personnel requirements AMC3 (e) Personnel requirements AMC4 (e) Personnel requirements AMC (f) Personnel requirements AMC (g) Personnel requirements AMC (h)

3 Personnel requirements AMC (j)(4) Personnel requirements GM (j)(4) Personnel requirements ( flight crew ) AMC (j)(5) Personnel requirements AMC (j)(5)(i) Personnel requirements AMC (j)(5)(ii) Personnel requirements GM 1 (e) Personnel requirements GM2 (e) Competence assessment procedure GM3 (e) Template for recording experience/training AMC (a) Certifying staff and support staff AMC (b) Certifying staff and support staff AMC (c) Certifying staff and support staff AMC (d) Certifying staff and support staff AMC (e) Certifying staff and support staff AMC (f) Certifying staff and support staff AMC (j) Certifying staff and support staff AMC (n) Certifying staff and support staff Annex II to ED Decision 2016/011/R Page 3 of 19 AMC (o) Certifying staff and support staff AMC Records of airworthiness review staff AMC (a) Equipment, tools and material AMC (b) Equipment, tools and material AMC (a) Acceptance of components AMC (b) Acceptance of components AMC (c) Acceptance of components AMC (d) Acceptance of components AMC (b) Maintenance data AMC (c) Maintenance data AMC (d) Maintenance data AMC (e)

4 Maintenance data AMC (f) Maintenance data AMC (g) Maintenance data AMC (a) Production planning AMC (b) Production planning AMC (c) Production planning GM Performance of maintenance AMC1 (b) Performance of maintenance AMC2 (b) Performance of maintenance AMC3 (b) Performance of maintenance AMC4 (b) Performance of maintenance AMC (c) Performance of maintenance GM (c) Performance of maintenance GM (d) Performance of maintenance AMC Certification of maintenance after embodiment of a Standard Change or Standard Repair (SC/SR) AMC (a) Certification of maintenance AMC (b) Certification of maintenance AMC No 1 to (d) Certification of maintenance AMC No 2 to (d) Certification of maintenance GM (d) EASA Form 1 Block 12 Remarks AMC (e) Certification of maintenance AMC (f) Certification of maintenance GM (a) Maintenance and airworthiness review records AMC (c) Maintenance and airworthiness review records AMC (a) Occurrence reporting GM (a) Occurrence reporting AMC (b) Occurrence reporting GM (c) Occurrence reporting Annex II to ED Decision 2016/011/R Page 4 of 19 AMC (a)

5 Safety and quality policy, maintenance procedures and quality system AMC (b) Safety and quality policy, maintenance procedures and quality system GM (b)(1) Safety and quality policy, maintenance procedures and quality system AMC (b)(2) Safety and quality policy, maintenance procedures and quality system AMC (b)(3) Safety and quality policy, maintenance procedures and quality system AMC (c)(1) Safety and quality policy, maintenance procedures and quality system AMC (c)(2) Safety and quality policy, maintenance procedures and quality system GM (c)(1) Safety and quality policy, maintenance procedures and quality system AMC (a) Maintenance organisation exposition GM (a) Maintenance organisation exposition AMC (b) Privileges of the organisation AMC Limitations on the organisation SECTION B PROCEDURE FOR COMPETENT AUTHORITIES AMC (1) Competent authority General AMC (3) Competent authority Qualification and training AMC (4) Competent authority Procedures AMC (1) Initial approval AMC (2) Initial approval AMC (3) Initial approval AMC (5) Initial approval AMC (6) Initial approval AMC (1)

6 Issue of approval AMC (2) Issue of approval AMC (3) Issue of approval AMC (1) Continuation of an approval AMC (2) Continuation of an approval AMC Changes AMC (1) Changes AMC (2) Changes to the organisation AMC MOE amendments AMC (a) Findings AMC (b) Findings AMC Record-keeping AMC TO APPENDICES TO PART-145 AMC to Appendix III Maintenance organisation Approval referred to in Annex II (Part-145) APPENDICES TO AMCs TO PART-145 Appendix I to AMC (1) EASA Form 4 Appendix II to AMC (5) EASA Form 6 Annex II to ED Decision 2016/011/R Page 5 of 19 Appendix III to AMC EASA Form 2 Appendix IV to AMC (e) and (3) Fuel Tank Safety Training 2) Point in GM1 (e) is added as follows: GM1 (e) Personnel requirements 6.

7 Procedures, information, tools and practices Visual Inspection Work logging and recording Procedure practice/mismatch/norms Technical documentation access and quality Critical maintenance tasks and error-capturing methods (independent inspection, reinspection, etc.) 3) GM2 (e) is amended as follows: GM2 (e) Competence assessment procedure (..) Understanding critical maintenance task X X X X X Ability to compile and control completed work cards X X X Ability to consider human performance and limitations X X X X X Ability to determine required qualifications for task performance X X X Ability to identify and rectify existing and potential unsafe conditions X X X X X Ability to manage third parties involved in maintenance activity X X Ability to confirm proper accomplishment of maintenance tasks X X X X Ability to identify and properly plan performance of

8 Critical maintenance tasks X X X 4) AMC (a) is amended as follows: AMC (a) Production planning 1. Depending on the amount and complexity of work generally performed by the maintenance organisation , the planning system may range from a very simple procedure to a complex organisational set-up including a dedicated planning function in support of the production function. 2. For the purpose of Part-145, the production planning function includes two complementary Annex II to ED Decision 2016/011/R Page 6 of 19 elements: scheduling the maintenance work ahead, to ensure that it will not adversely interfere with other work as regards the availability of all necessary personnel, tools, equipment, material, maintenance data and facilities.

9 ; during maintenance work, organising maintenance teams and shifts and provide all necessary support to ensure the completion of maintenance without undue time pressure. 3. When establishing the production planning procedure, consideration should be given to the following: logistics, inventory control, square meters of accommodation, man-hours estimation, man-hours availability, preparation of work, hangar availability, environmental conditions (access, lighting standards and cleanliness), co-ordination with internal and external suppliers, etc., scheduling of safety-critical critical maintenance tasks during periods when staff are likely to be most alert.

10 5) GM is added as follows: GM Performance of maintenance AUTHORISED PERSON An authorised person is a person formally authorised by the maintenance organisation to perform or supervise a maintenance task. An authorised person is not necessarily certifying staff . SIGN-OFF A sign-off is a statement issued by the authorised person which indicates that the task or group of tasks has been correctly performed. A sign-off relates to one step in the maintenance process and is, therefore, different to a certificate of release to service. 6) AMC1 (b) is added as follows: AMC1 (b) Performance of maintenance The procedure should identify the error-capturing methods, the critical maintenance tasks, the training and qualification of staff applying error-capturing methods, and how the organisation ensures that its staff is familiar with critical ma


Related search queries