Installing Drainage SystemsProper installation of Orion Drainage sys-tems is extremely important in assuring thatinstallations perform flawlessly for years. Supporting a Drainage SystemSince Polypropylene has a higher expan-sion rate than that of other materials, it cannotbe anchored to restrict movement from ther-mal expansion incurred from chemical reac-tions or the inadvertent dumping of hot waterinto the acid Waste recommends the use of clevis orloop type pipe hangers. If split-ring or otherhanger types are used the hanger should bea size larger than the pipe being supportedso the polypropylene pipe is free to move.(For example, if supporting 2" pipe, use 3"hangers, or when supporting 3" pipe, use4"hangers, etc.)Warnings: The use of uni-strut type hangers or anyhanger which relies on clamp tightness shouldnot be used.

Installing Drainage Systems Proper installation of Orion drainage sys-tems is extremely important in assuring that installations perform flawlessly for years.

Tags:

  System, Design, Data, Piping, Installing, Drainage, Drainage systems, Mets, Piping design data installing drainage, Drainage sys tems

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Acid Waste Piping Design Data Installing Drainage …

1 Installing Drainage SystemsProper installation of Orion Drainage sys-tems is extremely important in assuring thatinstallations perform flawlessly for years. Supporting a Drainage SystemSince Polypropylene has a higher expan-sion rate than that of other materials, it cannotbe anchored to restrict movement from ther-mal expansion incurred from chemical reac-tions or the inadvertent dumping of hot waterinto the acid Waste recommends the use of clevis orloop type pipe hangers. If split-ring or otherhanger types are used the hanger should bea size larger than the pipe being supportedso the polypropylene pipe is free to move.(For example, if supporting 2" pipe, use 3"hangers, or when supporting 3" pipe, use4"hangers, etc.)Warnings: The use of uni-strut type hangers or anyhanger which relies on clamp tightness shouldnot be used.

2 Do not clamp a polypropylene pipe sys-tem tightly. It must be free to move. Recommended Hanger Spacing forOrion Polypropylene DrainageSystems Schedule 40 & Schedule 80*Pipe size, inches Hanger Spacing, feet11 242435466686107127*Or per code. Recommended Hanger Spacing forOrion PVDF Drainage Systems*Pipe, size, inches Hanger spacing, feet11 *Or per SpecificationsPolypropylene Acid Waste Pipe manufac-tured from resin meeting ASTM D4101. Pipemeets the dimensional tolerances of ASTMD2447. All pipe is supplied in 10' sections (20'optional). All pipe is pregrooved at the Pipe manufactured from resin meet-ing ASTM D3222. Pipe meets the dimensionaltolerances of ASTM D2447. All pipe is sup-plied in 10' sections (20' optional). All pipe ispregrooved at the factory.

3 All PVDF pipe ismarked with UL 723 SpecificationsNo-Hub/Plain End Fittings Orion No-Hub/Plain End fittings meet or exceed ASTMF1412. Polypropylene fittings are manufac-tured from polyolefin material in accordancewith ASTM D4101. PVDF fittings are manu-factured from Kynar brand of PVDF resinmeeting ASTM D3222. The outer band ofeach No-Hub/Plain End is 300 series stainlesssteel, and 5 16" bolts, nuts and washers platedto meet a 100 hour salt spray test per Fusion Fittings Socket fusion sys-tems conform to ASTM F1412. Orion socketfusion fittings meet or exceed ASTM D2657standards. Polypropylene fittings are manufac-tured from polyolefin material in accordancewith ASTM D4101. PVDF fittings are manufac-tured from Kynar brand of PVDF resin meetingASTM Electrofusion Fittings OrionRionfuse fittings meet or exceed ASTM fittings are manufactured from poly-olefin material in accordance with ASTM D4101.

4 The molded coil is made of heavy gauge are not to be used at any time duringinstallation. Underground Installation of Orion Acid Waste SystemsThe trench as excavated for the pipe installationmust be free of loose stones, building materials oroutcroppings, and must provide minimum clear-ance around pipe of half the pipe diameter oneach side (horizontally) and one pipe diameterabove and below (vertically). The trench shall bebackfilled over the unexcavated base to a depth ofone pipe diameter with clean backfill. The backfillmaterial shall be free of stones and foreign matterand shall be capable of passing a No. 10 FITTINGS, Waste Piping SystemsAcid WAcid Waste Piping aste Piping Design DataDesign DataThe Piping shall be installed over this mate-rial and tested in accordance with applicableplumbing testing, initial backfilling must be care-fully accomplished, still using No.

5 10 screenmaterial until fill surrounds the pipe. When theselected backfill meets a depth of one diameterover the pipe, then backfilling can proceed withnormal fill until complete. Fill shall be compact-ed using hand held compacting equipmentwhen fill is midway up the pipe, and again whenthe fill is over one diameter over the compacting equipment can beused after the initial backfill is ProceduresFully inspect the installed Piping for evidenceof mechanical abuse and suspect the system into convenient test sections,not exceeding 1000 ft. The Piping should becapped off with an expandable plug at the endof the pipesection to be suggest that straight lengths of pipeshould be backfilled between the fittings being test-ed, prior to fill the pipe section with water, taking care toremove all trapped air in the Piping .

6 Use airrelease valves in any high spots in the system . Donot pressurize at this the pipe for at least one hour, to allow anequilibrium temperature to be check the system for leaks. If clear, checkfor and remove any remaining air from the the system to a suggested maximum of10 feet head by means of a standard 10 footstanding water test using a 10-foot vertical riser, ora low pressure hand the line at 10 feet of head pressure for aperiod of up to 8 hours, during which time thewater level should not change, (standing watertest) or the pressure gauge reading should notchange (hand pump test).Acid Waste Piping SystemsORION FITTINGS, INC. 47 Mechanical CouplingsPartMaterialTypeStandardSize,"G alvanic ReactionOuter bandStainless steelAISI 304-2 BASTM A240 Bolt barStainless steelAISI 304-2 BASTM A240 Bolt*Carbon steel Cadmium plated with Grade 85/16-18x1 dichromate coating Nut*Carbon steel Cadmium plated with 5/16-18 dichromate coating Washers*Carbon steel Cadmium plated withdichromate coating 5/16 WeldingStainless steelAutomatic MIG Basically nilwith Tri-MixCoupling body: Made from thermoplastic resin.

7 This material has similar chemical resistant properties as the pipe and fittingsmanufactured by Orion. It has been selected because of its excellent ability to be used as a gasket. temp. brittleness(-76(F)D746 Vical softness point185(F (85(C)D1525 Flexural stiffness12,700 psiD747 Torsional stiffness14,900 psiD1043*Bolt, nut, washer are plated to meet 100 hour salt spray test per ASTM D117. Design DataDesign DataACID Waste PIPINGIf there is a significant drop in pressure, or extended timesare required to achieve the desired pressure, either jointleakage has occurred or air is still trapped in the line. Inthis event, inspect for joint leaks. If none are found,check for trapped air - this air must be removed prior tocontinuing the joints are found to be leaking, the system must be fullydrained and the joints repaired.)))

8 Dry or marginal Rionfusejoints can be easily re-fused by following the proceduresdetailed in this catalog. Leaking joints can be backweldedif necessary. It should not be necessary to cut out joints,unless the joint haspreviously been overheated, contaminated, fractured orvery badly made in the first place. Where joints have tobe cut out and replaced, the procedures for field cuts andjoint installation detailed in this manual should be the 10 feet head test after repairing any leaking joints, following the procedure described : Tanks should not be pressure :This system was designed for acid Waste of a gravitynature. Some low-pressure applications are possible, butshould be checked with factory engineering departmentbefore specification or installation.

9 Do not use compressedair or other compressed gases for testing or manufacturer DOES NOT RECOMMEND No-Hub/Plain End couplings for use in systems used fordumping hot water appliances (autoclaves, dishwashers,sterilizers, etc). For these systems, Orion socket fusion isrecommended on main stacks carrying hot water and allruns within 75 feet of Expansion TablePolypropylene T T T T T T T Length 40 F 50 F 60 F 70 F 80 F 90 F 100 F20 ft .57 .70 .85 .99 ft ft ft ft T T T T T T T Length40 F 50 F 60 F 70 F 80 F 90 F 100.

10 90 calculate thermal expansion, use theformula: L=12eL Te= coefficient of thermal expansione = x 10-5in/in F (.000059") for Polypropylenee = x 10-5in/in F (.000075") for PVDFP olypropylene Example:Highest temperature expected: 100 FLowest temperature expected: 50 FTotal variation: T: 50 FLength of run: 20 in T: 50 FChange in L: .708"Where:Change in L = change in length fromthermal expansion or contraction (inches) T = difference between highest and lowesttemperature expected (0 F)e = coefficient of thermal expansionL = length of pipe run (feet)Example:L = 20ft T = 50(F L = 12 x .000059 x 50 x 20 L = .708"Pipe Dimension data ASTM F1412 Nom Size Average Schedule 40 Schedule 80incheswall thicknesswall thickness1-1 Orion Drainage Pipe Dimensions MeetsASTM F1412 SpecificationsPitchOrion Drainage systems are designed to allow for1/4 pitch per foot.)