CONSUMER CATEGORY(a) ConsumersgettingsupplyasperRuralSchedule ":(OtherthanTehsil Head Quarters,Nagar Palikas and Nagar PanchayatAreas)(i)Un-Metered:Fixed Charge:` Charge:(ii)Metered:Fixed Charge:` Charge:` (b)Supply at single point for bulk loads:Fixed Charge` Charge` (c) Other Metered Domestic Line Consumers: For consumers with contracted load of kW andEnergy consumtion upto 150 kwh/monthFixed Charge ` ChargeUpto 100 Units/month` 101 & upto 150 Units/month` :Fixed Charge` ChargeUpto 200 kWh/Month` 201-500 kWh/Month` 500 kWh/Month(from 501st unit onwards)` (a) ConsumersgettingsupplyasperRuralSchedule ":(OtherthanTehsil Head Quarters,Nagar Palikas and Nagar PanchayatAreas)(i)Un-MeteredFixed Charge` Charge:(ii)MeteredFixed Charge` Charge` (b) Private Advertising/Sign Post/Sign Board/Glow Signs/Flex:MeteredFixed ChargeEnergy Charge` Charge` (c)Other Metered Consumers: (For All Units Consumed)Fixed Charge` ChargeUpto 300 kWh/Month` 300 kWh/Month(From 301st unit onwards)` (a)Un-Metered Supply: (Billed on tota)

(A) Consumers getting supply as per "Rural Schedule" (i) Un-Metered Supply Fixed Charge ` 100.00 Energy Charge Maximum Lighting Load 120.00 (ii) Metered Supply

Tags:

  2013, Electricity, Tariffs, Electricity tariff, Fy 2013 14

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of APPROVED ELECTRICITY TARIFF :FY 2013-14 - Uppcl

1 CONSUMER CATEGORY(a) ConsumersgettingsupplyasperRuralSchedule ":(OtherthanTehsil Head Quarters,Nagar Palikas and Nagar PanchayatAreas)(i)Un-Metered:Fixed Charge:` Charge:(ii)Metered:Fixed Charge:` Charge:` (b)Supply at single point for bulk loads:Fixed Charge` Charge` (c) Other Metered Domestic Line Consumers: For consumers with contracted load of kW andEnergy consumtion upto 150 kwh/monthFixed Charge ` ChargeUpto 100 Units/month` 101 & upto 150 Units/month` :Fixed Charge` ChargeUpto 200 kWh/Month` 201-500 kWh/Month` 500 kWh/Month(from 501st unit onwards)` (a) ConsumersgettingsupplyasperRuralSchedule ":(OtherthanTehsil Head Quarters,Nagar Palikas and Nagar PanchayatAreas)(i)Un-MeteredFixed Charge` Charge:(ii)MeteredFixed Charge` Charge` (b) Private Advertising/Sign Post/Sign Board/Glow Signs/Flex:MeteredFixed ChargeEnergy Charge` Charge` (c)Other Metered Consumers: (For All Units Consumed)Fixed Charge` ChargeUpto 300 kWh/Month` 300 kWh/Month(From 301st unit onwards)` (a)Un-Metered Supply: (Billed on total Connected Load of individual points)Gram Pachayat` Palika and Nagar Panchayat` Nigam` (b)Metered Supply:(All Loads) Fixed ChargeGram Pachayat` Palika and Nagar Panchayat` Nigam` Energy ChargeGram Pachayat` Palika and Nagar Panchayat` Nigam` OF DAY18:00 hrs--06:00 hrs06:00 hrs--18:00 hrs(A)For Public Institutions.

2 Fixed Charge` Energy Charge` (B)For Private Institutions: Fixed Charge` Energy Charge` kW/monthper kWhper kW/monthper kWhTOD RATES0%per kWhper kWhper kWhper kW/monthper kW or part thereof/monthper kW or part thereof/monthper kW or part thereof/month(+)20 %LMV-4 LMV-3per kW/monthper kWhper kWhper kW/monthper kW/monthper kW/month-per kW/monthper kWhLMV-2per connection/monthper kWhper kWhper kWhper kW/monthper kWhper kWhNilNilAPPROVED ELECTRICITY TARIFF :FY 2013 -14 RATE SCHEDULET ariff Order FY 2013 -14 May 2013 LMV-1 DOMESTIC LIGHT, FAN & POWER:NON-DOMESTIC LIGHT, FAN & POWER:PUBLIC LAMPS:LIGHT, FAN & POWER FOR PUBLIC & PRIVATE INSTITUTION:per kW/monthper kWhper kW/monthper kWhper connection/monthper kW/monthper kWhPage 1 of 3(A) Consumers getting supply as per "Rural Schedule"(i)Un-Metered SupplyFixed Charge` ChargeMaximum Lighting (ii)Metered SupplyFixed Charge` Charge` Charge` (B)Consumers getting supply as per "Urban Schedule(Metered Supply)"Fixed Charge` Charge` Charge` (A) Consumers getting supply other than "Rural Schedule" Fixed Charge` Charge` ChargeTIME OF DAY22:00hrs--06:00 hrs06:00hrs--17:00 hrs17:00 hrs-22.

3 00 hrs(B)Consumers getting supply as per "Rural Schedule"(A) Consumers getting supply other than "Rural Schedule"Fixed Charge` Charge` (B)Consumers getting supply as per "Rural Schedule"(i)MeteredFixed Charge` Charge` (ii)Un-MeteredFixed Charge` Charge(A) Un-Metered(i)Fixed Charges for Illumination/Public Address/ceremonies for loads upto 20 kW/connection plus for each additional kW` (ii)Fixed charges for temp. shops set-up during festivals/melas or otherwise and having load up to 2 KW` (B)MeteredEnergy Charge(i) Individual Residential Construction` (ii) Others` ` (A)Un-Metered CategoryClass IV employees/ Operating staff` ` III employees` ` E & equivalent posts.` ` E & equivalent posts` ` E & equivalent posts` ` E & equivalent posts ` ` E (I & II)/General Managers and above` ` for using : Rs/month per A C (April to Sept.)

4 `Additional Charge for E D (B)Metered SupplyElectricity duty on the above shall be levied in addition at therates as may be notified by the State Government from time to consumers under this category shall be given 50 % rebate on rate of charge applicable to "other metered consumers" under LMV-1 Charge per Month Fixed Monthly Energy Charge per kWhMinimum Charge: per kW/week AND kWhper dayper day/shopper kWhperBHP/monthLMV-9 The Consumers under this category shall be entitled to a Rebate of 15% on Demand & Energy charges as given for under other than Rural kW/monthper kWhPUBLIC WATER WORKSSTW, PANCHAYTI RAJ TUBE WELL & PUMPED CANALS:Nil0(+) 15%The Consumers under this category shall be entitled to a Rebate of 15% on Demand & Energy charges as given for under Urban Schedule without TOD RATES (% of Energy Charges)(-) kW/monthper kWhSMALL AND MEDIUM POWER:NilSMALL POWER FOR PRIVATE TUBE WELL/ PUMPING SETS FOR IRRIGATION PURPOSES:per BHP/monthper kWhper BHP/monthper kWhper BHP/monthper BHP/monthWattsper BHP/monthNilLMV-5 Page 2 of 3(A)CommercialLoads/ with contracted Load 75 kW & above and gettingsupply at single point on 11 kV & above voltage levels:(a)Demand ChargesFor Supply at 11 kV` Supply at 33 kV & above` (b)Energy ChargeFor Supply at 11 kV` Supply at 33 kV & above` (B)Public Institutions with contracted load of 75 kW & above andgetting supply at Single point on 11 kV & above voltage levels.

5 (a)Demand ChargesFor Supply at 11 kV` Supply at 33 kV & above` (b)Energy ChargeFor Supply at 11 kV` Supply at 33 kV & above` (A)Urban ScheduleConsumers below 11 kV Supply :Demand Charges (Rs /kVA/Month)Energy Charge (Rs / kVAh)(B)Rural Schedule:BASE RATE :For Hour Linked TARIFF For supply above 11kV and up to & including 66 kVFor supply above 66 kV and up to including 132 kVFor supply above 132 kVDemand Charges (Rs /kVA/Month)` Charge (Rs / kVAh)` OF DAY22:00hrs-06:00 hrs06:00 hrs-17:00 hrs17:00 hrs-22:00hrs(A)RAILWAY TRACTION:(a) Demand Charge For supply at & above 132 kV` 132 kV` (b)Energy Charge For supply at & above 132 kV` 132 kV` Charge ` (B)DELHI METRO RAILFor supply at 132 kV or belowDemand Charge ` Charge ` Charge` (a) Demand Charge For Supply at 11 kV` Supply at 33kV & 66 kV` Supply at 132 kV` (b)Energy Charge For Supply at 11 kV` Supply at 33kV & 66 kV` Supply at 132 kV` (c)Minimum Charge ` addition to above ,Regulatory Surcharge @ % over and above these Rates shall also be billed to all cosumers in thesupply area of DVVNL, MVVNL,PVVNL and PuVVNL(except KesCo Supply supply area).

6 The Above Rate and Charges as APPROVED by ELECTRICITY Regulatory Commission shall become applicable after 7 days fromthis publicaion in all four DisComs and KesCo. The APPROVED TARIFF order & Rate schedule are also available at the website of allDisComs ( , , , & ), Power Corporation ELECTRICITY Regulatory Commission at & kVAhper kVA/monthper kVAhper kVAhper kVA/monthper kVA/monthper kVA/monthper kVA/monthHV-4 LIFT IRRIGATION WORKSper kVAhper kVAhper kVAhper kVA/monthper kVA/monthper kVA/monthper kVA/monthHV-30(+) 15%This Schedule shall be applicable only to consumers getting supply upto 11 kV as per "Rural Schedule".The consumers under this category shall be entitled to a rebate of 15 % on Demand and Energy charges as given for 11kV consumers under urban schedule without TOD supply at 11 kV TOD RATES(-) TRACTION:HV-2As per Schedule rate for consumers connected at 11kV supply per kVAhper kVAhper kVA/monthper kVA/monthLARGE AND HEAVY POWER:per kVAhper kVAhper kVA/monthper kVA/monthHV-1 NON-INDUSTRIAL BULK LOAD( Uppcl , MVVNL, DVVNL, PVVNL, PuVVNL,KesCo)Page 3 of 3