Example: bankruptcy

Army Deployment and Redeployment - BITS

FMI 3-35 (FM 100-17, FM 100-17-3, FM 100-17-5, and FM ) army Deployment and Redeployment June 2007 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. Headquarters, Department of the army FMI 3-35, C1 Change 1 HEADQUARTERS DEPARTMENT OF THE army Washington, DC, 15 January 2009 army Deployment and Redeployment 1. Change FMI 3-35, 15 June 2007, as follows: Remove expiration date. 2. FMI to expire 15 June 2009. Change 1 is required to ensure the FMI can be used as a reference in other publications.

Preface The purpose of this manual is to provide overarching guidance for Army deployment and redeployment operations in support of the National Military Strategy.

Tags:

  Army, Deployment, Redeployment, Army deployment and redeployment

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Army Deployment and Redeployment - BITS

1 FMI 3-35 (FM 100-17, FM 100-17-3, FM 100-17-5, and FM ) army Deployment and Redeployment June 2007 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. Headquarters, Department of the army FMI 3-35, C1 Change 1 HEADQUARTERS DEPARTMENT OF THE army Washington, DC, 15 January 2009 army Deployment and Redeployment 1. Change FMI 3-35, 15 June 2007, as follows: Remove expiration date. 2. FMI to expire 15 June 2009. Change 1 is required to ensure the FMI can be used as a reference in other publications.

2 3. File this transmittal sheet in the front of the publication. Distribution Restriction: Approved for public release; distribution is unlimited. By Order of the Secretary of the army : GEORGE W. CASEY, JR General, United States army Chief of Staff Official: JOYCE E. MORROW Administrative Assistant to the Secretary of the army 0901305 DISTRIBUTION: Active army , army National Guard, and United States army Reserve.

3 Not to be distributed; electronic media only. This page intentionally left blank. *FMI 3-35 (FM 100-17, FM 100-17-3, FM 100-17-5, and FM ) Field Manual Interim No. 3-35 (100-17, 100-17-3, 100-17-5, and ) Headquarters Department of the army Washington, DC, 15 June 2007 army Deployment and Redeployment Contents Page PREFACE ..iv Chapter 1 OVERVIEW .. 1-1 Force Projection .. 1-1 Deployment ..1-2 The Transforming 1-7 army Force 1-7 Chapter 2 PREDEPLOYMENT .. 2-1 2-1 2-6 Installation 2-9 Installation Deployment Processing Site.

4 2-10 Chapter 3 Deployment : FORT-TO-PORT ..3-1 Notification .. 3-1 Movement to the Port of 3-2 Activities at the Port of Embarkation .. 3-4 Movement to the Port of 3-10 Chapter 4 RSOI .. 4-1 4-1 RSOI Planning .. 4-3 Reception .. 4-7 4-11 Onward Movement ..4-14 4-15 Chapter 5 5-1 Redeployment 5-1 DISTRIBUTION RESTRICTION: Approved for public release: distribution is unlimited. *This publication supersedes FM 100-17, 28 October 1992; FM 100-17-3, 17 Mar 1999; FM 100-17-5, 29 September 1999; FM , 19 June 2002.

5 I Table of Contents Appendix A A-1 Appendix B The army Deployment Process ..B-1 Appendix C Automated Mobility Systems .. C-1 Appendix D In-Transit Visibility .. D-1 Appendix E Force Protection .. E-1 GLOSSARY.

6 Glossary-1 Section I Acronyms and Abbreviations .. 1 References-1 Figures Figure 1-1. The Deployment panorama .. 1-1 Figure 1-2. Phases of Deployment .. 1-3 Figure 1-3. Preparing documentation .. 1-4 Figure ARFORGEN cycles .. 1-8 Figure 2-1. Deployment 2-7 Figure 2-2. Rail 2-8 Figure 2-3. Air load Figure 2-4. Installation Deployment Processing 2-11 Figure 3-1. Military convoy ..3-3 Figure 3-2. Loaded rail cars ..3-4 Figure 3-3, Notional Seaport of Embarkation.

7 3-5 Figure 3-4. Equipment staged for Figure 3-5. Troops boarding C-17 .. 3-7 Figure 3-6. Notional aerial port of 3-8 Figure 3-7. Strategic Mobility Triad .. 3-10 Figure 4-1. Segments of 4-2 Figure 4-2. Unloading vehicles .. 4-7 Figure 4-3. Equipment staged for Figure 4-4. Staging 4-11 Figure 4-5. Notional theater laydown ..4-12 Figure 4-6. Base 4-13 Figure 4-7. TSB Layout .. 4-14 Figure 5-1. Redeployment wash rack ..5-2 Figure B-1. TC-AIMS II (Block 2) Deployment B-2 Figure D-1. Savi RF tags.

8 D-1 Figure D-2. Interrogator ..D-2 Figure D-3. Vehicle marking ..D-5 Figure D-4. Container Figure D-5. Pallet Marking ..D-6 ii FMI 3-35 15 June 2007 Table of Contents Figure D-6. Notional installation AIT D-7 Figure D-7. Notional APOE AIT laydown .. D-8 Figure D-8. Notional SPOE AIT Laydown ..D-10 15 June 2007 FMI 3-35 iii Preface The purpose of this manual is to provide overarching guidance for army Deployment and Redeployment operations in support of the National Military Strategy.

9 Previously, this material was contained in four separate manuals: FM 100-17, FM 100-17-3, FM , and FM 100-17-5. The material has now been merged into FMI 3-35 to eliminate redundancy and to align army Deployment doctrine with joint Deployment doctrine. Chapter 1 presents an overview of force projection and the Deployment process; Chapter 2 spells out activities units engage in prior to being alerted for Deployment ; Chapter 3 outlines the procedures involved in deploying units moving from home station to the port of debarkation (POD); Chapter 4 details the process of reception, staging, onward movement, and integration (RSOI); and Chapter 5 explains Redeployment .

10 The Transportation Coordinator s Automated Information for Movement System (TC-AIMS II) is the army system supporting all deployments and redeployments and replaces the Transportation Coordinator Automated Command and Control Information System (TC-ACCIS). The fielding of TC-AIMS II to army units will continue and the process outlined in Appendix B is the basis for operating and training the system. This manual is being published as an interim edition to let the changes in installation support, theater logistics support, TC-AIMS II, and ARFORGEN solidify.


Related search queries