Example: bachelor of science

Attachment Guide Supplemental Increased Wind Speed ...

1 | Page Firestone Attachment Guide November 29, 2021 Attachment Guide & Supplemental Increased Wind Speed Warranty Attachment Guide November 2021 NOTE: The contents of this Guide are considered accurate at time of posting. All information contained within should be validated for accuracy as it relates to specific project conditions or requirement. Specific codes, uplifts or other factors may result in changes to the information contained within this document. Validate all specific conditions with your Building Systems Advisor prior to its use.

Firestone Attachment Guide November 29, 2021 Attachment Guide & Supplemental Increased Wind Speed Warranty Attachment Guide November 2021 NOTE: The contents of this guide are considered accurate at time of posting. All information contained within should be validated for accuracy as it relates to

Tags:

  Attachment

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Attachment Guide Supplemental Increased Wind Speed ...

1 1 | Page Firestone Attachment Guide November 29, 2021 Attachment Guide & Supplemental Increased Wind Speed Warranty Attachment Guide November 2021 NOTE: The contents of this Guide are considered accurate at time of posting. All information contained within should be validated for accuracy as it relates to specific project conditions or requirement. Specific codes, uplifts or other factors may result in changes to the information contained within this document. Validate all specific conditions with your Building Systems Advisor prior to its use.

2 2 | Page Firestone Attachment Guide November 29, 2021 Contents Introduction .. 5 Substrate and Substrate Requirements .. 5 General .. 5 Minimum Fastener Pullout Resistances for Specific System .. 6 Criteria for Field Testing Mechanical Attachment to Various Deck Substrates .. 6 Building Configuration .. 7 Large Wall Opening Enhancement .. 7 Roof Zone Definition Factory Mutual (FM) .. 8 Roof Zone Layout Based on Building Height .. 8 Roof Elevation 9 Prescriptive Enhancement Options: Perimeter and Corner .. 9 Adhered Membrane Insulation Enhancements (choose one).

3 9 Mechanically Attached Membrane Membrane Securement Enhancements In Seam .. 9 Factory Mutual (FM) Invisiweld Attachment Rates .. 10 Invisiweld Attached Membrane Membrane Securement Enhancements .. 10 Base Sheet Attachment Over FM Approved Deck Types: .. 10 Base Sheet Mechanically Attached (choose one): .. 10 Mechanically Attached Membrane Preliminary Insulation Securement .. 11 ASCE 7 Basic Wind Speeds for Risk/Occupancy Category .. 12 ASCE - American Society of Civil Engineers - Roof Zones .. 12 ASCE 7-10 (IBC 2015/2012).

4 12 ASCE 7-10 Perimeter and Corner Definition - Examples .. 12 ASCE 7-16 (IBC 2018) .. 13 ASCE 7-16 Perimeter and Corner Definition Examples .. 13 Insulation Attachment .. 15 General .. 15 Attachment .. 15 Multiple Layers of Insulation .. 15 Attachment of Insulation to Substrate Adhered Membrane .. 15 Mechanical Attachment of Insulation to Substrate Mechanically Attached Membrane .. 16 Attachment of Vacuum Insulated Panels (VIPs) Adhered Membrane Only .. 17 Insulation Mechanical Attachment Patterns .. 17 Insulation Adhesive Attachment Pattern.

5 19 Criteria for Field Testing Insulation Adhesives for Adhesion to Deck Substrates .. 20 3 | Page Firestone Attachment Guide November 29, 2021 When Specified Uplifts Are Required .. 20 Warranty Purposes with No Specified Uplift .. 20 Retarders - Air and Vapor Definition .. 21 Vapor Retarder (Barrier) .. 21 Air Barrier (Retarder) .. 21 Attachment Rate Requirements for Plate Bonded Systems with an Air Barrier .. 22 Modified Bitumen Base Sheet Attachment .. 23 General .. 23 Base Sheet Attachment with any Modified Bitumen Base Sheet.

6 23 Base Sheet Attachment , Coiled Metal Batten, with a SBS Torch Cap .. 24 Base Sheet Attachment , MB 2" Barbed Plates, with a SBS Torch Cap .. 24 Single-Ply Membrane Attachment .. 25 Acceptable Fastener and Plate Guidelines .. 25 Perimeter Enhancements .. 28 Peel Stops .. 29 Factory Mutual (FM) Attachment Layout Examples .. 29 RubberGard EPDM .. 29 UltraPly TPO .. 30 Firestone PVC and PVC KEE .. 31 Invisiweld .. 31 Layouts in Chart Form Firestone Warranty Requirements .. 31 InvisiWeld Attachment .. 34 General .. 34 Induction welded membrane.

7 35 Heat welded membrane seams: .. 35 Invisiweld Fastener Patterns: .. 35 Invisiweld Warranty Requirements: .. 37 Invisiweld Enhancement Requirements: .. 37 Metal Building Re-Cover (MBR) Invisiweld Attachment Rates Standard Warranty .. 39 Metal Building Re-Cover Mechanically Attached FM Enhancement Options .. 40 Factory Mutual Loss Prevention Data Sheet 1-31 .. 40 Standing Seam Roof (SSR) Factory Mutual (FM) Inseam Enhancement Options .. 40 Firestone Increased Wind Speed Warranty Minimum Attachment Rate Guide .. 42 Alaska, Hawaii and International Projects.

8 42 Metal Roofing .. 42 4 | Page Firestone Attachment Guide November 29, 2021 Asphalt/Mod-Bit 42 General Notes .. 43 Edge Metal Requirements .. 43 Hurricane-Prone Regions and Special Wind Regions .. 44 Increased Wind Speed Warranty Attachment Requirements .. 45 Cover Board/Insulation Attachment Rates - Adhered Single-Ply Membrane Roofing Systems .. 45 Additional Notes: .. 46 Ballasted Roofing Systems .. 46 Stone, Firestone Ballast Pavers and Heavy-Weight (90 lbs) Paver Ballast .. 46 Half Sheet Information .. 47 Warranty.

9 47 UltraPly TPO Mechanically Attached or Adhered Membrane Options .. 47 Increased Wind Speed System Options .. 47 UltraPly TPO Membrane Mechanically Attached Requirements .. 48 TPO - Steel/Concrete - 22 ga Steel Deck or 2,500 psi Structural Concrete Decks .. 48 TPO - Wood Decks .. 49 TPO - LWC over Steel/Structural Concrete - UltraPly TPO Membrane Mechanically .. 50 TPO - Invisiweld Attachment Requirements .. 50 Firestone PVC and PVC KEE Mechanically Attached or Adhered Membrane .. 51 Increased Wind Speed System Options .. 51 Firestone PVC or PVC KEE Membrane Mechanically Attached Requirements.

10 51 PVC or PVC KEE Min. 22 ga Steel Deck or 2,500 psi Structural Concrete Decks .. 51 PVC and PVC KEE - Wood Decks .. 52 PVC and PVC KEE - LWC over Steel/Structural Concrete - Mechanically Attached .. 53 PVC and PVC KEE - Invisiweld Attachment Requirements .. 53 RubberGard MAX EPDM Mechanically Attached or Adhered Membrane Options .. 54 Increased Wind Speed System Options .. 54 RubberGard MAX EPDM Membrane Mechanically Attached Requirements .. 54 EPDM - Steel/Concrete - 22 ga Steel Deck or 2,500 psi Structural Concrete Decks.


Related search queries