Example: biology

Bill of Quantities (BoQ) ITB2013208 - UNDP

bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 1 Demolishing WorksPreamble:The contractor should be aware that the proposed work will be carried out in the existing functioning building and that the his daily activities shall not interrupt others ongoing daily activities in the other floors of the existing building. Unit rates shall include, but not limited to, the following:a. Removing of demolished material out of site to an approved dump The dismantled material are the sole properties of the The contractor shall coordinate implementation of his daily work activities, working hours, throughout the construction period with the client and the supervising engineerd. The contractor shall protect and safe guard the existing facilities and building finishes, including the painting, the floor tiles, *etc. the contractor shall not use the existing elevator for loading the construction materiale.

Bill of Quantities (BoQ) Refurbishment of a forensic laboratory in Ramallah ITB2013208 No. Description Unit Qty Unit Rate US$ Total US$ 2 Block & Plaster Works The contractor shall, when pricing the rates of …

Tags:

  Bill, Quantities, Bill of quantities

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Bill of Quantities (BoQ) ITB2013208 - UNDP

1 bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 1 Demolishing WorksPreamble:The contractor should be aware that the proposed work will be carried out in the existing functioning building and that the his daily activities shall not interrupt others ongoing daily activities in the other floors of the existing building. Unit rates shall include, but not limited to, the following:a. Removing of demolished material out of site to an approved dump The dismantled material are the sole properties of the The contractor shall coordinate implementation of his daily work activities, working hours, throughout the construction period with the client and the supervising engineerd. The contractor shall protect and safe guard the existing facilities and building finishes, including the painting, the floor tiles, *etc. the contractor shall not use the existing elevator for loading the construction materiale.

2 The contractor shall make the necessary temporary water, electrical power connections ..etc to prevent interruption of the power and water supply for the existing functioning The contractor shall take all necessary measures to protect and minimize environmental hazards including pollution, noise, dust * of the existing internal partitions including block works, concrete,* etc, price to include dismantling of the electrical, mechanical installation; all as approved by the of existing wall or floor tiles as shown on drawing A02 and as per the Engineer instructions. Price should include removal of mortar, fill material below the floor and preserving the existing wooden or metal doors as shown on drawing A02 and A03. Price to include removal of the door leafs and frames, preserving and storing the doors; all as instructed by the and preserve the existing kitchen cabinets, including careful removal of the counter tops and any associated electromechanical fixtures or and preserve the existing mechanical fixtures including one toilet, one sink, water Demolishing Works carried to summary1 of 31 bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 2 Block & Plaster WorksThe contractor shall, when pricing the rates of this bill , take into consideration including and allowing for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the and install 10 cm thick hollow blocks with reinforced concrete tie beams over all block walls with steel reinforcement 4Ф12mm and stirrups diameter 6mm@20cm, 20cm high and width equal to the wall thickness.

3 The price should include 4Ф12@20cm length steel dowels to be planted in the adjacent concrete or stone wall and fastened with the beam reinforcement Price shall also include properly fixing and anchorage of the block works with the adjacent concrete elements as approved by the surfaces, apply 13mm thick plaster on new or existing walls composed of 2 coats of cement sand plaster (rough and fine finish) over cement splashing coat. The price includes angles beads, wire mesh on all kinds of joints especially electro mechanical. The price should include patching works on previously plastered walls for electro mechanical for Block and Plaster Works carried to summary2 of 31 bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 3 Tiling WorksThe contractor shall, when pricing the rates of this bill , take into consideration including and allowing for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the rate shall include all design pattern and cutting, cement mortars, cement sand filling bellow floor tiles and and install non slip 30X30cm 7mm thick granite porcelain floor tiles, simlar to model "Coco from TAU CERAMICA" or equally approved Spanish or Italian tiles; all as per the Engineer's choice and approval.

4 The price should include the installation of the tiles at 5mm spacing and to any pattern selected by the engineer, grouting with anti bacterial epoxy grout. Price shall include the cement mortar (1:3), sand with cement and install glazed porcelain tiles first grade for wall tiling Spanish or Italian made and as approved by the Engineer. Tiling shall be to any pattern and color selected by the Engineer, with 5mm spacing, pointing with water resistant grout like Mapei. Price shall include surface preparation, installation of the tiles, on new or existing walls, with approved adhesive material. m230 Total for Tiling Works carried to summary4 Sealing WorksThe contractor shall, when pricing the rates of this bill , take into consideration including and allowing for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the and apply three coat of Sika Top Seal 107 or equivalent on clean surfaces at the wet areas.

5 The price include 5*5cm angle fillet with smooth sand cement mortar (1:3), applaying of smooth surface layer of cement sand screed to recieve the sealing material. m225 Total for Sealing Works carried to summary3 of 31 bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 5 Wooden and Carpentry WorksThe Contractor shall when pricing the rates of this bill , take into consideration including and allowing for the cost or expenses of all requirements stipulated in the preambles, drawings, and technical Wooden doorsSupply and install the following 45mm thick PLY wooden doors. Price to include pine woode frames, three door hinges at each door leaf, 20 cm high stainless steel kick plates from both sides of the door leafs, door stoppers, door locks, cylinders (Wally or equally approved), and the accessories as approved by the to include painting of the door leafs and frames by 2 coats of putty 2 coats of under coat ORANGE as made by APC or equaly approved,and 3 coats of APC ARAMAT; all as instructed and approved by the ,clear leaf dimensions 80x210cm.

6 Please refer to drawings details 34 + Dismantled , preserve and re install the existing wooden doors as shown on drawing A03 and instructed by the Engineer. Price shall include, but not limited to, the followings: 1 supply and install pine wooden doors frame 50mm thick and width equal to the wall thickness. 2 Fixing of the frames by galvanized steel anchors L75x100mmx40mm width and mm thick ( 4 anchors for each side) 3 Installing new handles, locks and cylinders as made by Wally or an approved Painting of the new door frames and the dismanteled door leafs with oil paint including primer, 2 coats of putty, 1 coat of undercoat and three coats of oil based wooden of 31 bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ Counters, benches and cabenitsSupply and install laboratory cabinets with the following specifications.

7 1 All handles are as made by TIRADOR 2012/14 Length of handle 96/160 mm, Color is NIROSTA All hinges are as made by BLOOM3 All Ply wood used is 17mm BARCELONA made or equivalent that should be approved by the site and install lower laboratory cabinets, as per the detailed drawings and instructed by the site engineer, price includes counter with granite tops as made by CAESAR color No. 7100, Preformed casements, upper and lower steel ends. Refer to Detail 6 + 7 + 8 + 9 +10 + 11 + 12 +13 + 14 +15 +16+18 +19 +21 + 22 + and install lower laboratory cabinets, as per the detailed drawings and instructed by the engineer, price includes ready made Formica top counter c. Refer to Detail 2 + 3 + 4 + 5 + 6 + 9 + 12 + 13 + 14 + 15 + 16 + 18 + 19 + 20 + 22 + 24 + but upper cabinets, 40cm deep, without counter top part. Refer to Details 3 + 4 + 11 + 21 + 26 + but to be installed back to back as a middle counter. Refer to Details 5 + 6 + 7 + 8 + 9 + 12 + 13 + 17 + 18 + 19+ 20 + 22 + 23 + 24 + Ditto but covers for electro mechanical cabinets.

8 , but reception counter complete, as shown on drawings and approved by the but for shelving units. The price should include 4*4mm steel tubes for hanging the shelves from the ceiling. Refer to details 20 + 22 + 25mr10 Total for Wooden and Carpentry Works carried to summary5 of 31 bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 6 False Ceiling WorksThe contractor shall, when pricing the rates of this bill , take into consideration including and allowing for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the and install ECOPHONE ADVANTAGE E 15mm thick over fine line structure 60x60cm false ceiling, price to include structure and installation using special gloves as instructed and approved by the site engineer. The Price should include install paper corner and joints beads on all joints, corners, connections between walls and boards using putty (GOLD BOND BRAND), laying one layer of putty over the joints and corners and another one layer over all gypsum boards, sanding with sand paper and finishing all as approved by the site engineer.

9 Refer to Details 30 + 31 + Gypsum False ceiling Supply and install ORBOND water proofing (GREEN) gypsum board for false ceilings of mm thick gypsum panels with studs at every 40cm in both directions including decorations, forms, trims with all connections supports , fixing, putty sealer , wire mesh and special angles for edge of boards and all necessary accessories needed for the best completion of works . The contractor shall provide a shop drawing for architect ORBOND water proofing (GREEN) gypsum mm thick less than 50cm widem240 Total for False Ceiling Works carried to summary6 of 31 bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 7 Painting WorksThe contractor should allow in his pricing that the engineer may use as many different colors or combination of colors to meet an approved color hand made color mix is contractor has to prepare a color sample on site for each color asked by the EngineerThe owner has the right to choose any color of or combination, no price difference will be measured for any color variation doneAll paint works should conform to manufacturer's instructions regarding number of coats, rate of application or drying timePainting to be carried out on new or old surfaces.

10 Price shall include surface preparation , pealing off old defective paint, batching, ..etc On walls & all kinds of raw material and apply paint for internal walls, stairs walls, landings, and wherever needed or instructed by the site engineer, the price should include preparing surface, clean, remove dust and foreign matter, sanding with sand paper, checking the walls with Calcimo X and putty, applying one coat of APC FILL , laying two coats of putty (GOLD BOND brand or an approved equivalent), applying one coat of SUPER BOND ROLL and applying three coats of ARACRYL 2000 all as instructed and approved by the site all kinds of raw material and apply paint for gypsum boards up to high, and wherever needed or instructed by the site engineer, the price should include preparing surface, clean, remove dust and foreign matter, sanding it well with sand paper, checking the walls with putty, laying two coats of putty (GOLD BOND brand or an approved equivalent)