GOVERNMENT OF INDIACENTRAL PUBLIC WORKS DEPARTMENTANALYSIS OF RATESFOR DELHI(VOL -1)2014 Published Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New Delhi All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced inany form or by any means, electronic or mechanical including photocopy, recording or any informationstorage and retrieval system, without permission, in writing, from the Director General, cpwd , NewDelhiThis analysis of Rates 2014 for Delhi is prepared for the use of cpwd .

GOVERNMENT OF INDIA CENTRAL PUBLIC WORKS DEPARTMENT ANALYSIS OF RATES FOR DELHI (VOL -1) 2014 Published Under The Authority of Director General CPWD, Nirman Bhawan, New Delhi

Tags:

  Department, Analysis, Public, Central, Work, Cpwd, Central public works department, Central public works department analysis of

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of CENTRAL PUBLIC WORKS DEPARTMENT …

1 GOVERNMENT OF INDIACENTRAL PUBLIC WORKS DEPARTMENTANALYSIS OF RATESFOR DELHI(VOL -1)2014 Published Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New DelhiPublished Under The Authority of Director General cpwd , Nirman Bhawan, New Delhi All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced inany form or by any means, electronic or mechanical including photocopy, recording or any informationstorage and retrieval system, without permission, in writing, from the Director General, cpwd , NewDelhiThis analysis of Rates 2014 for Delhi is prepared for the use of cpwd .

2 However, this may be usedby other Govt. departments, PSUs, private bodies & individuals also at their own discretion. cpwd shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly orindirectly by using or following items of DSR by such bodies or and Marketed byM/s Kshitiz EnterprisesD-57 South Extension Part-1 New Delhi-110049 Phone : 011-41648857,Mobile : 9811032311, 9311332311 Email byDirector GeneralCentral PUBLIC WORKS DepartmentNirman BhawanNew Delhi-110011 Also available atAll leading Govt. Book Dealers in IndiaPrice : Rs. 3000/-Per Set of 2 VolumesExcluding, Postage, Packing and Delivery Charges GOVERNMENT OF INDIA GUPTAD irector GeneraldsU h; yksd foHkkxdsU h; yksd foHkkxdsU h; yksd foHkkxdsU h; yksd foHkkxdsU h; yksd Hkou] ubZ fnYyh & 110011 CENTRAL PUBLIC WORKS DepartmentNirman Bhawan, New Delhi-110011 Tel.

3 :23062556/1317, Fax : 23061884 Email: ljdkjljdkjljdkjljdkjljdkjGovernment of IndiaFOREWORDC entral PUBLIC WORKS DEPARTMENT analysis of Rates for Delhi is a verycomprehensive and useful document forming basis for the rates of various is based on scientific assessment of Inputs of materials, labour and machineryin various items of work normally involved in civil construction was first compiled in the year 1950, followed by subsequent publication orrevision in the years 1955, 1962, 1972, 1977, 1985, 1997, 2007, 2012 & publication of analysis of Rates for Delhi -2013, prices of labour andmaterials have registered substantial increase. Besides the increased cost, therehas been a spurt of new construction materials and introduction of Green BuildingConcept of construction. This has necessitated revision of existing analysis ofRates for Delhi 2013 to include the above changes.

4 Accordingly, this analysis ofRates for Delhi 2014 has been analysis of existing items has been updated in conformity with updated itemsof WORKS in DSR wish to place on record the technical input and the effective coordination on thepart of Shri Diwakar Garg, Special (HQ), Shri Mukesh Vij, ADG (TD), Shri , Chief Engineer(CSQ) and the efforts put in by Shri Mathura Prasad, SE TAS(CSQ) and his team of officers in TAS unit in finalizing analysis of Rates for Delhi2014 in a record am sure that analysis of Rates for Delhi 2014 shall be very usefuldocument to various CENTRAL Govt. Ministries, Departments & PUBLIC SectorUndertakings also besides various units of : New DelhiDate : July 2014( Gupta) analysis of Rates for Delhi 2014 is the revised edition of Analysisof Rates for Delhi 2013.

5 2. analysis of Rates for Delhi 2014 incorporates most of the analysis of items of Analysisof Rates for Delhi 2013 with updated correction slips, including analysis of existingitems and also corresponding new items introduced in DSR analysis of Rates for Delhi, 2014 is published in two volumes volume I & II asunder:VolumeSub-head Sub-headNumberOne00 Basic Rates01 Carriage of materials02 Earth Work03 Mortars04 Concrete Work05 Reinforced Cement Concrete06 Brick Work07 Stone Work08 Marble & Granite Work09 Wood and PVC Work10 Steel Work11 Flooring12 RoofingTwo13 Finishing14 Repairs to Buildings15 Dismantling and Demolishing16 Road Work17 Sanitary Installations18 Water Supply19 Drainage20 Pile work21 Aluminium Work22 Water Proofing23 Horticulture and Landscaping24 Rain Water Harvesting & Tube wells25 Conservation of Heritage buildings26 Structural Glazing and CompositeAluminium Panel4.

6 The new items for 100 mm thick M-25, RCC drain covers and M-30 PU mould paverblocks have been introduced in Sub head-16 Road of few existing items in sub head -20 (pile work ) have been deleted. Similarly,analyses of many items have been modified to correspond to items of DSR new analysis and sub items have been introduced in analysis of Rates for analysis of Rates for Delhi, 2014 is based on the current market rates of materials atDelhi, collected during the period of March- April 2014. The basic rates of materials,incorporated in the analysis , pertain to materials conforming to BIS Standards/ CPWDS pecifications/Materials of good quality generally available in the market. Labour ratesare the minimum wages issued by the Government of Delhi The nomenclatures of main items have been printed along with the analysis of firstSub item only to conserve the space and number of Sundries have been considered as times, based on Cost Index of Delhi as with a base as per A lot of effort has gone into the preparation of this DAR-2014, I convey my deepappreciation and sincere thanks to Shri Mathura Prasad SE(TAS), SinghSE(QA), Shri Meena EE (TAS-I), Sh.

7 Goel EE(QA-I), Shri Chhabilal SinghAE, Shri Saxena AE, Shri Ram Janam Chaudhary JE, Shri Vijay Kumar ChiefEstimator, Shri Bahal Singh Sr. Drafts Man, Shri Vijay Singh Man, and otherofficers & staff of TAS unit for sincere efforts made in the preparation of this documentin such a short time. Various field units, who contributed field inputs, also deserveappreciation for their timely Due care has been taken to print the analysis of Rates for Delhi as correctlyas possible. It is, however possible that some errors might have crept in. In case anyerror or omission is noticed, it may be brought to the notice of the SuperintendingEngineer (TAS), cpwd , Room no. 418, A-wing, Nirman Bhawan, New Delhi. (Mukesh Vij) ADG (TD), cpwd ,Nirman Bhawan, New DelhiJune, 2014viSH.

8 OF SUB-HEADPAGE Charges of Labour Materials Codes of Materials work Cement & Granite and PVC 615-688 Note : For remaining Sub Heads refer to 1C O N T E N T HIRE CHARGES OF PLANTSCode `0001 Hire charges of Coaltar Boiler 900 to 1400 charges of Concrete Mixer to cum with charges of Diesel Road Roller - 8 to 10 cost of concrete by batch mix charges of Diesel Truck - 9 charges of Spraying machine including electric charges of Coaltar charges of Barber green, drying, mixing and Asphalt Plant,with accessories, capacity 30/45 charges of concrete including Hire charges of pump,piping work & accessories charges of Derrick monkey charges of Pump set of capacity 4000 (Needle type 40 mm)

9 For rubbing of end loader capacity and running charges of Tripod and Mechanical Winch machinecomplete with power unit and and running charges of and running charges of Grinder for mirror Excavator (3D) with driver and Bitumen Mixer cum i/c hand and running charges of hydraulic piling rig with powerunit etc. including complete accessories and shifting at and running charges of light and running charges of bentonite and running charges of vibrating pile driving hammercomplete with power unit and and running charges of crane 20 tonne of concrete by transit 250 with ripper with compressor 250 cfm with two leads for pneumaticcutters / RATES : HIRE CHARGES OF PLANTS30041 Joint cutting machine with 2-3 .batch mix form paver with tanker 5000 joint cutting.

10 - Above hire - charges include cost of services ofoperating staff and supply of lubricating D-80-A Grader metre Excavator of 1 cum end loader 1 cum bucket capacity (incl POL) -5 Cumtonne roller 8 to 10 Wheeled Roller 8 to 10 Road Tanker 5 to 6 KL Mix Plant 60 Broom Pressure Distributor @ 1750 sqm per hour mix Plant -120 TPH mix Plant 100 TPH finisher Hydrostatic with sensor control 100 finisher Mechanical 100 and Mixing Plant @ 75 cum per Paver finisher with 40 HP Motor and 250 100 KVA/125 cum/ 10 tonnestonne sweeper (Mechamical Broom) @ 1250 sqm per Type HMP of 60-90 TPH capacity @ 75 tonne per houractual and running charges of drill machine up to 400 mm dia(including cost of mobile oil, diesel consumption in ordinarysoil and operator) Integrity testing `BASIC RATES : HIRE CHARGES OF PLANTS40082 Excavation of Diaphragm wall by Mechanical :- Above hire - charges (from item code 0049 to 0082) includecost of services of operating staff, supply of lubricating oil and charges of TATA 407 or equivalent for local `BASIC RATES : HIRE CHARGES OF PLANTS5 BASIC LABOURNote :- These rates are exclusive of contractor s profit and over heads and are inclusive of wages for weeklyday of restCode ` 1 st 2nd 1 st 2nd (grade 1) Fitter or 2nd class (for plaster of paris work ) 1 st (brick layer) 1 st (brick layer) 2nd (for plain stone work ) 2nd (for ornamental stone work ) 1 st (for Road Roller, Concrete Mixer, Truck etc.)