time Required for 1,000 sq. :1. Halls and Corridors 15 General Rooms

Time Required for 1,000 sq. ft. Dry Vacuuming: 1. 12" Upright Vacuum With 1 Motor Unobstructed 15 min. 2. 12" Upright Vacuum With 1 Motor Obstructed 24 min.

Tags:

  Time, Cleaning, Estimator, Ferguson, Cleaning time estimator ferguson

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of CLEANING TIME ESTIMATOR FERGUSON …

1 time Required for 1,000 sq. :1. Halls and Corridors 15 General Rooms

2 20 :1. 36" Dust Mop Unobstructed 6 36" Dust Mop Obstructed 10 24 oz. Damp Mop Unobstructed 25 24 oz.

3 Damp Mop Obstructed 45 24 oz. Wet Mop & Rinse Unobstructed 35 24 oz. Wet Mop & Rinse Obstructed 50 Scrubbing:1. Hand Scrub 10" Brush 5 Deck Scrub 10" Brush 1 hr.

4 40 Doodlebug Scrub Baseboards 1 hr. 20 Scrubbing:1. 13" Electric Floor Machine 44 16" Electric Floor Machine 36 18" Electric Floor Machine

5 32 20" Electric Floor Machine 18 26" Electric Floor Machine 6 32" Electric Floor Machine 5 Vacuuming:1.

6 15" Pick Up Tool Unobstructed 20 15" Pick Up Tool Obstructed 30 Buffing:1. 19" 175 rpm Buffer Unobstructed 30 19" 175 rpm Buffer Obstructed 45 19" 300 rpm Buffer Unobstructed 20 19" 300 rpm Buffer

7 Obstructed 35 Speed Burnishing:1. 20" I,500 rpm Electric Machine 12 20" 2,400 rpm Propane Machine 6 or Finish Application:1.

8 Apply Wax or Finish, Each Coat 30 Wet Strip and Refinish (1 man, 2 coats) 2 Top Scrub and Refinish (1 man, 2 coats) 2 CLEANING :1. Sweep and Dust 1 Flight 15 Steps 6 Damp Mop 1 Flight 15 Steps 5 Hand Scrub 1 Flight 15 Steps

9 20 FLOOR OPERATIONSCLEANING time ESTIMATOR time Required each jobWashing Fluorescent Light Fixture 2 Fixture 4 Fixture 8 Fixture (spot wash both sides)1 min. 23 Napkin Dispenser1 Napkin Disposal or Tub6 Basin with Soap Dispenser3 Dispensers6 and Fixtures CLEANING and 15 cases (3 Tier) 20 Cabinets (4 Drawers) Disposal and Stand1min. 20 Basin (Office) Blind (standard size)3min. 50 Lamp and Light Ft. Fluorescent Ft. Fluorescent Fluorescent Fluorescent Lamp and Lamp and & FURNITURE OPERATIONSTime Required for 1,000 sq. " Upright Vacuum With 1 Motor " Upright Vacuum With 1 Motor " Upright Vacuum With 2 Motor Unobstructed8 " Upright Vacuum With 2 Motor Vacuum With 12" Tool Vacuum With 12" Tool Shampooing, 17" Buffer50min. ** Shampooing, 18" Foamer50min. ** Bonnet Buffing, 20" Buffer30min. * Dry CLEANING (Host)1 hr.

10 30 min. ** Water Extractor With 12" Drag Tool1 hr. 40 min. * Water Extractor With 16" Drag Tool1 hr. 40 min. * Contained Hot Water Extractor W/Brush30min. * Pressure Rotating Jet Extractor18min. * , Self Propelled Extractor17min. * Upholstery or Vacuum Armless Chair1 or Vacuum Arm Chair1 or Vacuum Couch2 Armless Chair4 Arm Chair7 Couch30min.* Times listed do not include prior vacuuming or drying times.**Times listed do not include vacuuming after CLEANING which is required for residue :All estimates represent average CLEANING times for each tasklisted. Room configuration, obstacles, weather, environmental conditions, skill of personnel, etc. will affect actual CLEANING CARE OPERATIONS time Required each jobGeneral Restroom Cleaning1 hr. 30 & Lockers2 Walls (manual)3 hrs. 20 Walls (machine)1 hr. 40 Walls (manual)1 hr. 40 Washing (manual)4 Washing (machine)3 Pane (Exterior)2 (Exterior)2 hrs. 40 Single Pane3 hrs.