Transcription of Compilation of Approved Specs 2016 - Rhode …
1 Compilation OF Approved SPECIFICATIONS Rhode ISLAND DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION REVISIONS SUPPLEMENTAL SPECIFICATIONS SPECIAL PROVISIONS APRIL 2016 THIS SPECIFICATION Compilation REPLACES THE FOLLOWING DOCUMENTS Document Release Date Compilation of Approved Specifications (Revised 01/24/2011) 01/24/2011 [Replaced Supplement Nos. 1 10] Compilation of Approved Specifications Supplement No. 11 05/18/2011 Compilation of Approved Specifications Supplement No. 12 12/23/2011 Compilation of Approved Specifications Supplement No. 13 04/17/2012 Compilation of Approved Specifications Supplement No. 14 08/02/2013 Compilation of Approved Specifications Supplement No. 15 04/28/2015 Compilation of Approved Specifications Supplement No. 16 05/07/2015 NOTES: 1.
2 ALL THE MATERIAL CONTAINED IN THIS DOCUMENT HAS BEEN PREVIOUSLY RELEASED IN THE SPECIFICATION COMPILATIONS LISTED ABOVE. 2. DIVISION I, PART 100 GENERAL REQUIREMENTS AND COVENANTS, INCLUDING REVISIONS; DIVISION II, CONSTRUCTION DETAILS AND DIVISION III, MATERIALS, OF THE 2004 EDITION OF THE RI STANDARD SPECIFICATIONS ARE REPLACED WITH THE RI STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, AMENDED AUGUST 2013. Compilation of Approved Specifications Date: 04/22/2016 AC-i TABLE OF CONTENTS Section Title Page 109 Measurement and AC-1 201 Load and Haul Solid Waste & Disposal of Solid Waste .. AC-5 202 Excavation and AC-7 203 Structure Excavation and AC-11 206 Perimeter Erosion AC-12 207 Check AC-17 212 Maintenance and Cleaning of Erosion and Pollution AC-19 300 Aggregate and Gravel Base and Subbase AC-21 401 Dense Graded Hot Mix Asphalt (HMA) AC-23 Friction Courses Production and Placement.
3 AC-47 403 Asphalt Emulsion Tack AC-48 & Cleaning and Sealing Cracks in Bituminous Concrete Pavement: .. AC-50 Cracks Less than 1-Inch and 1-Inch and Over in Width 410 Temporary Patching of Potholes and Trenches .. AC-55 Paver-Placed Elastomeric Surface AC-57 Rubberized Asphalt Chip AC-61 414 Warm Mix Additive .. AC-67 601 Portland Cement Concrete .. AC-68 Mineral Additives for Portland Cement AC-98 604 Class HP(AE) Portland Cement AC-99 605 Concrete with Calcium Nitrite Based Corrosion AC-100 606 Self-Consolidating Concrete (SCC).. AC-101 607 Mass AC-103 Compilation of Approved Specifications Date: 04/22/2016 AC-ii Section Title Page 701 Culverts and Storm Drains.
4 AC-115 714 Post Type AC-119 Partial Removal and Disposal of Existing Concrete AC-121 Cleaning Bridge Beam AC-125 Temporary Deck Underside and Side Protective AC-127 804 Driven AC-129 Earth Retaining Systems Ground AC-131 Curing Concrete .. AC-132 Concrete Architectural Treatment Form Liner AC-133 809 Precast/Prestressed Structure Concrete AC-135 810 Reinforcing AC-145 812 Water AC-150 813 Waterproofing and AC-152 Placement of Concrete Bridge AC-157 815 Latex Modified Concrete for Bridge AC-160 817 Repairs to Structure Concrete AC-161 818 Portland Cement Concrete Bridge Deck AC-163 Concrete Surface Treatment Protective Coating Materials.
5 AC-166 High-Pressure Water Cleaning of Concrete AC-167 High-Pressure Water Cleaning of Bridge AC-168 823 Roadway Joints Expansion and AC-170 Asphaltic Expansion Joint System Materials and .. AC-171 Workmanship Warranty Surface Preparation for Weathering Steel Final AC-183 825 Painting Structural AC-184 Compilation of Approved Specifications Date: 04/22/2016 AC-iii Section Title Page 841 Pre- and Post-Construction Condition Surveys .. AC-197 842 Anti-Graffiti Coating .. AC-200 Guardrail End Treatment Non-Energy Absorbing AC-202 Guardrail End Treatment Energy Absorbing AC-202 903 Fences Temporary Chain Link Fence.
6 AC-203 903 Fences Split Rail Fence .. AC-205 905 Sidewalks and AC-207 Sidewalks Failure to AC-211 906 Curbing for AC-212 913 AC-216 Flagpersons - AC-217 918 Rural Mailboxes Postmaster Approved .. AC-218 926 Anchored and Unanchored Precast Concrete Barrier AC-219 Temporary Traffic Control 927 Remove and Relocate Precast Concrete Median Barrier AC-222 Temporary Traffic Control 929 Field Offices and Materials AC-223 Field Offices and Materials Laboratory .. AC-226 930 Plant Field AC-228 Plant Field AC-236 934 Field Control and Construction AC-237 935 Removing Bituminous Pavement by Micro AC-242 936 Mobilization and Demobilization.
7 AC-243 937 Maintenance and Movement of Traffic Protective AC-245 Price AC-247 Compilation of Approved Specifications Date: 04/22/2016 AC-iv Section Title Page 942 Detectable Warning Panel .. AC-248 On-the-Job AC-249 944 Diesel Emissions Reduction Program .. AC-253 Electrical AC-257 Highway AC-259 Ground Rods and Bare or Insulated Ground AC-260 Wire and AC-261 Handholes and Pull AC-263 AC-265 AC-268 Aluminum Lighting Standards and AC-270 Service AC-271 Detectors and Relays.
8 AC-272 Post AC-273 Borrow and AC-274 Latex Emulsion AC-276 Bituminous AC-277 AC-279 AC-280 AC-283 Sheet Piling and AC-286 Waterproofing, Dampproofing and AC-287 Traffic Control Systems .. AC-292 Glass Beads Dual AC-312 Compilation of Approved Specifications Date: 04/22/2016 AC-v Section Title Page Epoxy Resin Pavement AC-314 Landscaping AC-315 Anti-Graffiti Systems.
9 AC-316 Compilation of Approved Specifications Date: 04/22/2016 AC-1 Replace Subsection , Measurement and Payment Differing Site Conditions, Changes, Extra Work and Force Account Work, pages 1-80 to 1-82 of the RI Standard Specifications for Road and Bridge Construction in its entirety with the following. SECTION 109 MEASUREMENT AND PAYMENT DIFFERING SITE CONDITIONS, CHANGES, EXTRA WORK AND FORCE ACCOUNT WORK. a. Methods of Payment. Differing site conditions, changes, extra work, and significant changes in the character of the work, all performed in accordance with SECTION 104; SCOPE OF WORK, will be paid for in accordance with the following methods as appropriate: 1. Contract unit prices. 2. Unit prices agreed upon in the order authorizing the work. 3. An agreed upon lump sum amount. 4. If directed by the Department, on a Force Account Basis to be compensated in the following manner: (a) Labor.
10 For all labor and foremen in direct charge of the specific operations, the Contractor shall receive the rate of wage actually paid as shown by its certified payroll, which rate shall be at least the prevailing rate of wage (or scale), for each and every hour that said labor and foremen are actually engaged in the work. No part of the salary or expenses of anyone connected with the Contractor's forces above the grade of foreman, and having general supervision of the work, shall be included in the labor item as specified above. The Engineer reserves the right to determine the number and type of labor employed. The Contractor shall receive the actual costs paid to, or in behalf of, workers by reason of subsistence and travel allowances, health and welfare benefits, pension fund benefits or other benefits, when such amounts are required by collective bargaining agreement or other employment contract generally applicable to the classes of labor employed on the work.