Example: barber

Compliance report “Vijay Estate Vakas” project at …

13th February 2017 To, The Director Regional Office (West central Zone), Ministry of Environment, Forest and Climate Change, Ground Floor, East wing, New Secretariat Building, Civil lane, Nagpur-440001 Subject: Half-yearly Compliance report : June to Nov 2016 project Residential Cum Commercial project Lodha Shreeniwas at Lower Parel, Mumbai EC No. SEAC-2013 , dated 29th April, 2013 Dear Sir, We are submitting half-yearly Compliance report (hard & soft copy) in respect of the of stipulated terms and conditions of Prior Environmental Clearance as specified in Environment Clearance Notification Clause No. 10(ii). Thanking you, Yours faithfully, For Shreeniwas Cotton Mills Ltd. project Proponent Enclosure: 1. A hard copy of the Compliance and monitoring report 2. A CD containing the same report CC copy to: 1. Regional officer, Maharashtra Pollution Control Board, Govandi 2.

13th February 2017 To, The Director Regional Office (West Central Zone), Ministry of Environment, Forest and Climate Change, Ground Floor, East wing, New Secretariat Building,

Tags:

  Central

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Compliance report “Vijay Estate Vakas” project at …

1 13th February 2017 To, The Director Regional Office (West central Zone), Ministry of Environment, Forest and Climate Change, Ground Floor, East wing, New Secretariat Building, Civil lane, Nagpur-440001 Subject: Half-yearly Compliance report : June to Nov 2016 project Residential Cum Commercial project Lodha Shreeniwas at Lower Parel, Mumbai EC No. SEAC-2013 , dated 29th April, 2013 Dear Sir, We are submitting half-yearly Compliance report (hard & soft copy) in respect of the of stipulated terms and conditions of Prior Environmental Clearance as specified in Environment Clearance Notification Clause No. 10(ii). Thanking you, Yours faithfully, For Shreeniwas Cotton Mills Ltd. project Proponent Enclosure: 1. A hard copy of the Compliance and monitoring report 2. A CD containing the same report CC copy to: 1. Regional officer, Maharashtra Pollution Control Board, Govandi 2.

2 Member Secretary, Maharashtra Pollution Control Board, Sion, Mumbai 3. Member Secretary, State Environmental Impact Assessment Authority, Govt. of Maharashtra, Mumbai ENVIRONMENTAL CLEARANCE Compliance report for the period of (June to November, 2016) Shreeniwas Cotton Mills Ltd. Residential Cum Commercial project at Lower Parel, Mumbai (Environmental Clearance Letter Dated 29thApril, 2013) Proposed by Shreeniwas Cotton Mills Ltd. CONSULTANT Mahabal Enviro Engineers Pvt. Ltd. Plot F-7, Road 21, MIDC Wagle Estate , Thane-400604 Phone:+91-22-25823139/1663/0658 Compliance report Shreeniwas Cotton Mills Ltd project at Lower Parel, Mumbai Shreeniwas Cotton Mills Ltd. Page 2 Contents Contents .. 2 Environment Clearance .. 4 Conditions of Environmental Clearance Letter No. SEAC-2213/CR-209/TC-1 dated 29th April, 2013 .. 9 Consent To Establish .. 21 Condition of Consent .. 22 Consent to Operate (Part I).

3 31 Consent to Operate (Part II) .. 42 Schedule-II .. 48 Terms & conditions for Compliance of Air Pollution Control: .. 48 49 Details of Bank Guarantees .. 49 Schedule-IV .. 50 General Conditions: .. 50 Annexure I .. 54 Previous Compliance report Submitted copy .. 54 Annexure II .. 55 Site Photograph .. 55 Entrance gate .. 55 Site office .. 55 Construction site .. 56 Access to Labour Camp .. 56 Labour camp .. 57 Toilets for 57 First aid Centre .. 58 Water storage tank .. 58 RO plant .. 59 Fly Ash bricks .. 59 Safety 60 Emergency Access .. 60 Workers with safety equipments .. 61 Assembly Point .. 61 RG Area .. 62 Storm water drainage system .. 62 Water sprinkling at the construction site .. 63 Ready mix cement 63 Compliance report Shreeniwas Cotton Mills Ltd project at Lower Parel, Mumbai Shreeniwas Cotton Mills Ltd. Page 3 Storm water excavation chamber .. 64 Temporary STP .. 64 Parking area for 2 65 Parking area for 4 65 Storage area.

4 66 Solid waste bins .. 66 set .. 67 Annexure III .. 68 PUC Copy .. 68 (As per the EC construction phase construction:xiv) .. 68 Annexure 69 Structural Certificate .. 69 (As per the EC construction phase construction: xviii) .. 69 Annexure V .. 70 Monitoring report .. 70 Annexure 71 Environment Clearance letter .. 71 Annexure VII .. 72 Consent to Establish letter .. 72 Annexure VIII .. 73 Consent to Operate Part I .. 73 Annexure 74 Consent to Operate Part II .. 74 Compliance report Shreeniwas Cotton Mills Ltd project at Lower Parel, Mumbai Shreeniwas Cotton Mills Ltd. Page 4 Environment Clearance State Level Environment Impact Assessment Authority SEAC-2013 Environment Department Room , 2nd floor, Mantralaya Annex, Mumbai-400 032. Dated: 29th April, 2013. To, Shreeniwas Cotton Mills Ltd. Lodha Excelus, N. M. Joshi, Marg, Mahalaxmi Mumbai 400011 Subject: Environment clearance for proposed residential, Commercial, IT & MCGM parking building on plot bearing CS No.

5 443,444,444/1,446 Lower Parel Division at 402 Senapati Bapat Marg, Lower Parel, Mumbai by M/s. Shreeniwas Cotton Mills clearance regarding. Sir, This has reference to your communication on the above mentioned subject. The proposal was considered as per the EIA Notification 2006, by the State Level Expert Appraisal Committee-II, Maharashtra in its 10thmeeting decided to recommend the project for prior environmental clearance to SEIAA. Information submitted by you has been considered by State Level Assessment Authority in its 58th Meeting. 2. It is noted that the proposal is for grant of Environmental Clearance for proposed expansion of Residential, Commercial, IT & MCGM parking building on plot bearing CS No. 443,444,444/1, 446 Lower Parel Division at 402 Senapati Bapat Marg, Lower Parel, Mumbai. SEAC considered the project under screening category 8(a) B2 as per EIA Notification 2006.

6 Brief Information of the project submitted by you is as Name of the project Expansion of Residential, Commercial & Municipal Car Parking project project Proponent Shreeniwas Cotton Mills Ltd. Consultant Mahabal Enviro Engineers Pvt. Ltd. Type of project : Housing project / Industrial Estate / SRA scheme/ MHADA/ township or others Residential, Commercial & Municipal Car Parking project Location of the project CTS No. 443, 444, 445(P), 446, 453 of Lower Parel division, Senapati Bapat Marg, Mumbai. Total Plot Area 71, Deductions 10, m2 Compliance report Shreeniwas Cotton Mills Ltd project at Lower Parel, Mumbai Shreeniwas Cotton Mills Ltd. Page 5 Net plot area 60, m2 Permissible FSI (Including TDR etc.) 238, m2 Proposed Built-up Area (FSI & Non-FSI) FSI area in m2 238,289,00 Non FSI area in m2 496, Total Built up area in m2 735, Ground-coverage percentage(%) Estimated cost of the project Crore No.

7 Of building & its Configuration As per EC received dated Residential Buildings Residential 1:2B + 4P + S + 111 Residential 2:2B + 4P + S + 57 Tenant: S + 18 IT Buildings Commercial 1: 2B + 4P + 21 Commercial 2: 2B + L + 3P + 13 MCGM Car Park: 3B + G + 18 Total After Expansion Residential Buildings Residential 1: 2B + 4P + S + 111 Residential 2:2B + 4P + S + 57 Residential 3:2B + 4P + S + 72 Tenant: B + G + 20 IT Buildings Commercial 1: 2B + 4P + 21 Commercial 2: 2B + L + 3P + 13 MCGM Car Park: 3B + G + 4 Number of tenants and shops As per EC received dated Total After Expansion 1051 flats 1108 flats Numbers of expected residents/ users 12,882 Nos. Height of the building(s) Residential 1 m Residential 2 m Residential 3 m Tenant m Commercial 1 m Commercial 2 Right of way The project site is accessed by 30m wide Senapati Bapat Marg Turning radius 9 m Compliance report Shreeniwas Cotton Mills Ltd project at Lower Parel, Mumbai Shreeniwas Cotton Mills Ltd.

8 Page 6 Total Water Requirement Dry Season Fresh water (CMD) 609 Source MCGM Recycled Water (CMD) 470 Total water requirement (CMD) 1078 Swimming pool make up (cum) From Tanker Firefighting (cum) As per CFO Noc Wet Season Fresh water (CMD) 296 Source MCGM Recycled Water (CMD) 470 Total water requirement (CMD) 766 Swimming pool make up (cum) From Tanker Firefighting (cum) As per CFO Noc Rain Water Harvesting (RHW) Level of ground water table Average Size and No. of RWH tanks and quantity 1 No 169 cum 1 No 125 cum 1 No 108 cum 1 No 98 cum 1 No 97 cum 1 No 28 cum Location of RWH tank Basement Size and no. of recharge pits and quantity 22 Nos. Budgetary allocation Capital Cost: Lakh O & M Cost: Lakh Storm Water Drainage Natural water drainage pattern Towards West Side of road Quantity of storm water Size of SWD 1 # 500 mm /Dia 1 # 300 mm /Dia Sewage and waste water Sewage generation (CMD) 957 m3/day STP Technology MBBR Technology Capacity of STP (CMD) 1010 m3/d DG sets (during emergency) DG sets will be provided as alternate supply for essential services such as STP, Fire Fighting, Lift etc.

9 Capacity: 16,650 kVA Budgetary allocation: Capital Cost: 165 Lakh O & M Cost: lakh Compliance report Shreeniwas Cotton Mills Ltd project at Lower Parel, Mumbai Shreeniwas Cotton Mills Ltd. Page 7 Solid waste management Waste generation in the pre-construction and construction phase Waste generation in the Operation phase Dry Waste (kg/d) 2543 kg/day Wet Waste (kg/d) 1695 kg/day STP Sludge (dry sludge) (kg/d) 19 CMD Mode of Disposal of Waste Dry Waste: Dry garbage will be segregated & disposed off to recyclers Wet Waste: Wet garbage will be composted using Mechanical Composting system (Eco Bio-compack) and used as organic manure for landscaping. E-waste: E-Waste generated will be given to authorized recyclers Biomedical Waste The generated biomedical waste will be disposed as per the norms STP sludge (dry sludge) Sludge will be used as manure for gardening Area requirement Budgetary allocation: Capital Cost: 28 Lakh O & M Cost.

10 Lakh Green Belt Development Total RG Area 33,677m2 RG on ground m2 RG on Podium m2 Energy Power supply Maximum demand MW Connect load MW Source TATA (TPC) Energy saving by non-conventional method Energy saving measures Natural shading through elevation features to minimize heat gain and reduce air conditioning requirement Use of AC and fa ade system to reduce heat gain and power consumption Use of low-e glass to reduce power requirement Large central atriums for natural cross ventilation Solar lighting in common areas, garden and road Solar hot water for sale building Energy efficient lighting fixtures (LED lights) to all buildings Detail calculations & % of saving Budgetary allocation Capital Cost: Lakh O & M Cost: Lakh/year DG set Number and capacity of the DG sets to be used Capacity of DG Set provided for 16,650 kVA Type of fuel used: High Speed Diesel Compliance report Shreeniwas Cotton Mills Ltd project at Lower Parel, Mumbai Shreeniwas Cotton Mills Ltd.