Example: stock market

Consolidated Table of Contents - Deltek (formerly Avitru)

Consolidated Table OF CONTENTSS ectionSection TitleArchitecturalBuilding 00 - PROCUREMENT AND CONTRACTING REQUIREMENTSU000101 Project Title PagellllllllllProject Manual title PagellllllllllFor seals of design professionals on Project of Drawing SheetsllllllllllList of of SchedulesllllllllllFor a list of separately bound for BidsllllllllllFor use on public for Prequalification of BiddersllllllllllFor use on public to BidllllllllllFor use on private for QualificationsllllllllllFor use on public to BiddersllllllllllIncorporates AIA A701 by Instructions to BiddersllllllllllFor use with AIA MeetingsllllllllllSets date, time, place, and terms for prebid Substitution ProceduresllllllllllSubstitution procedures during SchedulesllllllllllPreliminary Condition Informati

018113.16 Sustainable Design Requirements - LEED 2009 for Commercial Interiors General requirements and procedures for LEED 2009 for Commercial Interiors. 018113.17 Sustainable Design Requirements - LEED v4 ID+C General requirements and procedures for LEED v4 ID+C. 018113.19 Sustainable Design Requirements - LEED 2009 for Core and Shell Development

Tags:

  Leeds, Leed v4

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Consolidated Table of Contents - Deltek (formerly Avitru)

1 Consolidated Table OF CONTENTSS ectionSection TitleArchitecturalBuilding 00 - PROCUREMENT AND CONTRACTING REQUIREMENTSU000101 Project Title PagellllllllllProject Manual title PagellllllllllFor seals of design professionals on Project of Drawing SheetsllllllllllList of of SchedulesllllllllllFor a list of separately bound for BidsllllllllllFor use on public for Prequalification of BiddersllllllllllFor use on public to BidllllllllllFor use on private for QualificationsllllllllllFor use on public to BiddersllllllllllIncorporates AIA A701 by Instructions to BiddersllllllllllFor use with AIA MeetingsllllllllllSets date, time, place.

2 And terms for prebid Substitution ProceduresllllllllllSubstitution procedures during SchedulesllllllllllPreliminary Condition InformationllllllllllReferences documents for survey and as-built Hazardous Material InformationllllllllllReferences documents for existing hazardous DatallllllllllReferences documents for geotechnical ApplicationllllllllllIndicates responsibility for building permit Form - Stipulated Sum (Single-Prime Contract)llllllllllFixed price, single Form - Stipulated Sum (Multiple-Prime Contract)llllllllllFixed price, multiple Form - Construction Management (Single-Prime Contract)llllllllllFixed price, construction management, single Form - Construction Management (Multiple-PrimeContract)llllllllllFixed price, construction management, multiple Form - Cost-Plus-Fee (Single-Prime Contract)

3 LlllllllllCost plus, with or without guaranteed Security FormsllllllllllReferences AIA FormllllllllllAttachment for Bid Prices FormllllllllllAttachment for Bid FormllllllllllAttachment for Bid Schedule of Values FormllllllllllAttachment for Bid Submittal ChecklistllllllllllAttachment for Bid of AwardllllllllllFor notifying successful FormsllllllllllReferences Agreement, General Conditions, and notifying bidders of 01 - GENERAL REQUIREMENTS010000 General RequirementsllllllllllEvaluations: Role of Division 1 Sections, their preparation = New U = UpdateCopyright 2019 - The American Institute of Architects (AIA)

4 Exclusively published and distributed by AVITRUM arch 2019 Page 1 of 35 Consolidated Table OF CONTENTSS ectionSection TitleArchitecturalBuilding of the Work, phased construction, purchase contracts,Owner-furnished products, access to site, and work Contract SummaryllllllllllResponsibilities of each contract for the Work, coordination, andtemporary facilities and for cash allowances including lump-sum, unit cost,contingency, and testing and inspecting PricesllllllllllProvisions for unit for change-of-scope and cost-comparison ProceduresllllllllllProcedural requirements for requests for substitutions Modification ProceduresllllllllllProcedural requirements for changes to the ProceduresllllllllllAdministrative requirements for Contractor's Applications Management and CoordinationllllllllllAdministrative requirements for project meetings;preconstruction, preinstallation, and project closeoutconferences; RFIs.

5 And project Web Progress DocumentationllllllllllContractor's Construction Schedule including Gantt charts andCPM schedules; and web-based project DocumentationllllllllllConstruction photographs, video recordings, and web-basedphotographic ProceduresllllllllllProcedures for Action and Informational Submittals includingDelegated-Design Submittals and Submittals Project Procedures for Detention FacilitiesllllSpecial requirements for detention work including responsibilitiesof a detention Project ProcedureslllllllllGeneral protection and work procedures for remodeling,renovation, repair.

6 And maintenance Treatment ProceduresllGeneral protection and treatment of historic RequirementsllllllllllQuality-assurance and -control requirements, special tests andinspections, and Contractor's quality-control definitions and terms; and acronyms and trade namesof associations, government agencies, and other entitiesreferenced in Facilities and ControlsllllllllllTemporary utilities and facilities for construction support,security, and Tree and Plant ProtectionlllllConstruction-phase tree and plant protection, trimming,protection- zone fencing, and Storm Water Pollution ControlllllRequirements for compliance with EPA s Stormwater PollutionPrevention Plan (SWPPP).

7 016000 Product RequirementsllllllllllAdministrative and procedural requirements for product,material, and equipment selection and handling; warranties; andcomparable requirements for product installation, cutting andpatching, protection, field engineering, and progress = New U = UpdateCopyright 2019 - The American Institute of Architects (AIA)Exclusively published and distributed by AVITRUM arch 2019 Page 2 of 35 Consolidated Table OF CONTENTSS ectionSection TitleArchitecturalBuilding Waste Management and DisposalllllllllllSalvaging, recycling, and disposing of non-hazardous demolitionand construction ProceduresllllllllllContract closeout including Substantial Completion and FinalCompletion procedures, warranties, and final and Maintenance DatallllllllllEmergency, operation.

8 And maintenance manuals for productsand Record DocumentsllllllllllRecord record Drawings, Specifications, and Product and TrainingllllllllllAdministrative and procedural requirements for instructingOwner's personnel in operation and Design Requirements - LEED 2009 for NewConstruction and Major RenovationsllllllllllGeneral requirements and procedures for LEED 2009 for NewConstruction and Major Design Requirements - leed v4 BD+CllllllllllGeneral requirements and procedures for leed v4 BD+ Design Requirements - LEED 2009 for CommercialInteriorslllllllllGeneral requirements and procedures for LEED 2009 forCommercial Design

9 Requirements - leed v4 ID+ClllllllllGeneral requirements and procedures for leed v4 ID+ Design Requirements - LEED 2009 for Core andShell DevelopmentlllllllllGeneral requirements and procedures for LEED 2009 for Core andShell Design Requirements - LEED 2009 for SchoolslllllllllGeneral requirements and procedures for LEED 2009 for Design Requirements - IgCCllllllllllGeneral requirements and procedures for Design Requirements - ASHRAE requirements and procedures for ASHRAE Design Requirements - Green GlobesllllllllllGeneral requirements and procedures for Green Commissioning RequirementsllAdministrative requirements and procedures for commissioningall Enclosure CommissioningllRequirements for testing building enclosure systems andassemblies as part of the commissioning 02 - EXISTING CONDITIONS024116 Structure DemolitionlllllllDemolition of existing buildings, structures, and associated DemolitionlllllllllDemolition of selected portions of existing buildings, structures.

10 And associated site Removal and DismantlingllSpecial types of selective demolition work for historic spaces Excrement RemovalllRemoval of bird excrement in historic or nonhistoric 03 - CONCRETE030130 Maintenance of Cast-In-Place ConcretelllllConcrete patching and repair, epoxy crack injection, corrosioninhibiting surface treatment, polymer overlays and sealers, andcomposite structural Forming and AccessoriesllllGeneral building and structural applications; concrete formworkand ReinforcingllllGeneral building and structural applications; concrete ConcretellllllGeneral building and structural applications.


Related search queries