CONSTRUCTION HEALTH AND SAFETY PLAN

_____ CONSTRUCTION HEALTH AND SAFETY plan for 400 and 390 Park Avenue South New York, New York Tax Map Block 857, Lots 40 and 46 NYCOER Project Number: 12 RHAZ083M Prepared For: ET 400 PAS, LLC c/o Equity Residential Two N. Riverside Plaza, Suite 400 Chicago, IL 60606-2609 For Submittal To: New York City Office of Environmental Remediation Brownfields Cleanup Program 100 Gold Street, 2nd Floor New York, New York 10038 Prepared By: Langan Engineering & Environmental Services, Inc. PC River Drive Center One Elmwood Park, New Jersey 07407 Chris McMahon Project Geologist Steven A. Ciambruschini, PG, LEP Senior Associate / Vice President 31 January 2012 100271601 ENVIRONMENTAL HEALTH AND SAFETY plan Client: ET 400 PAS, LLC Project: Excavation Activities During Site Work Location: 390 and 400 Park Avenue South Chemical Hazards: Volatile Organic Compounds, Polycyclic aromat

CONSTRUCTION HEALTH AND SAFETY PLAN for 400 and 390 Park Avenue South New York, New York Tax Map Block 857, Lots 40 and 46 NYCOER Project Number: 12RHAZ083M Prepared For:

Tags:

  Safety, Plan, Safety plan

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of CONSTRUCTION HEALTH AND SAFETY PLAN

1 _____ CONSTRUCTION HEALTH AND SAFETY plan for 400 and 390 Park Avenue South New York, New York Tax Map Block 857, Lots 40 and 46 NYCOER Project Number: 12 RHAZ083M Prepared For: ET 400 PAS, LLC c/o Equity Residential Two N. Riverside Plaza, Suite 400 Chicago, IL 60606-2609 For Submittal To: New York City Office of Environmental Remediation Brownfields Cleanup Program 100 Gold Street, 2nd Floor New York, New York 10038 Prepared By: Langan Engineering & Environmental Services, Inc. PC River Drive Center One Elmwood Park, New Jersey 07407 Chris McMahon Project Geologist Steven A. Ciambruschini, PG, LEP Senior Associate / Vice President 31 January 2012 100271601 ENVIRONMENTAL HEALTH AND SAFETY plan Client: ET 400 PAS, LLC Project: Excavation Activities During Site Work Location: 390 and 400 Park Avenue South Chemical Hazards: Volatile Organic Compounds, Polycyclic aromatic hydrocarbons, Metals, Pesticides, Polychlorinated Biphynels Prepared By: LANGAN ENGINEERING & ENVIRONMENTAL SERVICES, INC.

2 Version: 1 Date : 31 January 2012 Client Contact: Robert Piazza Langan Project Manager (PM): Chris McMahon (201)218-2339 Langan HEALTH & SAFETY Coordinator (HSC): Tony Moffa, CHMM (215)491-6545 Langan Site SAFETY Officer (SSO): Field Personnel Langan Incident/Injury Hotline: (201)398-4699 LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, PC) LANGAN), AND LANGAN SUBCONTRACTORS, DO NOT GUARANTEE THE HEALTH OR SAFETY OF ANY PERSON ENTERING THIS SITE. DUE TO THE NATURE OF THIS SITE AND THE ACTIVITY OCCURRING THEREON, IT IS NOT POSSIBLE TO DISCOVER, EVALUATE, AND PROVIDE PROTECTION FOR ALL POSSIBLE HAZARDS WHICH MAY BE ENCOUNTERED.

3 STRICT ADHERENCE TO THE HEALTH AND SAFETY GUIDELINES SET FORTH HEREIN WILL REDUCE, BUT NOT ELIMINATE, THE POTENTIAL FOR INJURY AT THIS SITE. THE HEALTH AND SAFETY GUIDELINES IN THIS plan WERE PREPARED SPECIFICALLY FOR THIS SITE AND SHOULD NOT BE USED ON ANY OTHER SITE WITHOUT PRIOR RESEARCH AND EVALUATION BY A TRAINED HEALTH AND SAFETY SPECIALIST. APPROVALS By signature, the personnel identified below hereby acknowledge that they have reviewed this CONSTRUCTION HEALTH and Safely plan (CHASP) and agree to comply with the requirements contained therein as well as the applicable provisions of 29 CFR Parts 1910 and 1926.

4 The undersigned also acknowledge and accept that this CHASP is the project CHASP for the site work described in the Remedial Action Work plan (RAWP). Furthermore, in reviewing and accepting this CHASP, as currently written, the undersigned agree that to the best of their knowledge, this CHASP adequately identifies the activities and hazards associated with work at this site and describes the appropriate and necessary precautions and protections for site workers required by the applicable OSHA statutes and regulations. 7/19/2011 LANGAN Project Manager - PM (Chris McMahon) Date 7/19/2011 LANGAN HEALTH and SAFETY Coordinator (Tony Moffa, CHMM) Date LANGAN Site SAFETY Officer SSO Date TOC - i TABLE OF CONTENTS INTRODUCTION.

5 1 Purpose and Policy .. 1 Site Descriptions .. 3 Scope of Work .. 3 PROJECT TEAM ORGANIZATION AND RESPONSIBILITIES .. 4 Project Manager .. 4 HEALTH and SAFETY Coordinator (HSC) .. 5 Site SAFETY Officer (SSO) .. 5 HAZARDS ANALYSIS .. 7 General Hazard Assessment .. 7 Chemical Exposure Hazards .. 8 Specific Chemical Hazards Previously Detected at the Site .. 8 Chemical Hazard Exposure Routes .. 8 Control of Exposure to Chemical Hazards .. 9 Physical Hazards .. 9 Temperature Extremes .. 9 Noise and Air Resources .. 10 Hand and Power Tools .. 10 Slips, Trips, and Falls.

6 11 Fire and Explosion .. 11 Material Handling .. 11 Confined Space/Excavation Hazards .. 12 Working Near Equipment .. 12 Electrical SAFETY .. 13 Utilities .. 13 Vehicular 13 Biological Hazards .. 13 Animals .. 13 Insects .. 14 Wound Care .. 14 Task Hazard Analysis .. 14 PERSONAL PROTECTIVE EQUIPMENT (PPE) .. 15 Levels of Protection .. 15 Respirator Fit-Test .. 16 Respirator Cartridge Change-Out Schedule .. 16 TABLE OF CONTENTS (Continued) TOC-ii AIR QUALITY MONITORING AND ACTIONS LEVELS .. 17 Monitoring During Site Operations .. 17 Volatile Organic Compounds.

7 18 SVOCs, Pesticides, and Metals .. 18 Noise Monitoring .. 18 Monitoring Equipment Calibration and Maintenance .. 19 Determination of Background Levels .. 19 COMMUNITY HEALTH AND SAFETY CONSIDERATIONS .. 19 WORK ZONES and DECONTAMINATION .. 20 Site Control .. 20 Contamination Control .. 20 Personnel Decontamination Station .. 20 Minimization of Contact with Contaminants .. 21 Personnel Decontamination Sequence .. 21 Emergency Decontamination .. 21 Hand-Held Equipment Decontamination .. 22 Heavy Equipment Decontamination .. 22 Communications .. 23 MEDICAL SURVEILLANCE.

8 23 MEDICAL SURVEILLANCE PROGRAM REQUIREMENTS .. 23 EMERGENCY RESPONSE plan .. 24 Responsibilities .. 24 HEALTH and SAFETY Coordinator (HSC) .. 24 Site SAFETY Officer (SSO) .. 24 Emergency Coordinator .. 24 Site Personnel .. 25 Communications .. 25 Local Emergency Support Units .. 25 Pre-Emergency Planning .. 26 Emergency Medical Treatment .. 26 Emergency Site Evacuation Routes and Procedures .. 27 Fire Prevention and Protection .. 27 Fire Prevention .. 27 Significant Vapor Release .. 28 Overt Chemical Exposure .. 28 Decontamination During Medical Emergencies .. 29 Incident Reporting.

9 29 Adverse Weather Conditions .. 30 TABLE OF CONTENTS (Continued) TOC-iii Spill Control and Response .. 30 Emergency Equipment .. 32 Restoration and Salvage .. 32 TRAINING .. 32 General HEALTH and SAFETY Training .. 32 Annual Eight-Hour Refresher Training .. 33 Site-Specific 33 Onsite SAFETY Briefings .. 33 First Aid and CPR .. 33 Hazard Communication .. 34 RECORDKEEPING .. 34 Field Change Authorization Request .. 34 Medical and Training Records .. 34 Onsite Log .. 34 Daily SAFETY Meetings ( Tailgate Talks ) .. 35 Exposure Records .. 35 Incident Reports .. 35 OSHA Form 35 Hazard Communication Program/MSDS.

10 35 FIELD PERSONNEL REVIEW .. 35 TABLE OF CONTENTS (Continued) TOC-iv TABLES Table 1 Contaminants of Concern Table 2 Chemical Exposure Limits and HEALTH Effects Table 3 Hazard Analysis Table 4 Instrumentation Action Levels Table 5 Personal Protective Equipment FIGURES Figure 1 Site Location Map Figure 2 Emergency Hospital Route Map ATTACHMENTS Attachment A HEALTH and SAFETY Briefing Statement Attachment B Field Procedures Change Authorization Form Attachment C Unsafe Conditions and Practices Form Attachment D Calibration Log Attachment E EMERGENCY NOTIFICATION NUMBERS Attachment F Accident/Incident Report Form Attachment G Material SAFETY Data