Transcription of CONSTRUCTION PERMITS INTRODUCTION - Dallas
1 CONSTRUCTION PERMITS INTRODUCTION . WHO SHOULD USE THIS: WHERE TO GET A PERMIT: Any entity must obtain a master permit before they: Permit Center erect, construct, enlarge, add to, alter, repair, replace, Oak Cliff Municipal Center improve, remove, install, convert, equip, use occupy or 320 E. Jefferson Blvd. Room 118. maintain a structure or building service equipment. Barricade | Building | Demolition | Electrical | Fence Fire extinguishing system | Flammable liquids WHEN A PERMIT IS NOT NEEDED: Landscape | Lawn sprinkler | Liquid petroleum Outside certain historic, conservation or planned devel- opment districts, you do not need a permit for the fol- Mechanical | Paving / Excavation | Plumbing lowing. (Refer to Chapter 52, Section 301 of the Admin- Septic tank | Sign | Tent istrative Procedures for the CONSTRUCTION Codes). district Offices: Stopping leaks in pipes, drains or plumbing without NE: 11910 Greenville Ave. # 100 | 214-670-7278. replacing or rearranging valves, pipes or fixtures NW: 7610 N.
2 Stemmons Fwy #180 | 214-671-0720. Fences (not serving as a pool enclosure) not over 4. feet in a front yard and not over 6 feet elsewhere SE: 725 Jim Miller Rd. | 214-670-8160. Storm windows, rain gutters, insulation. SW: 2730 Coombs Creek Dr. | 214-671-1531. Call first to ensure there are no unusual circumstances, but Retaining walls not over 4 feet measured from the district Offices can issue Backflow, Drive Approach, Electrical, bottom of footing to the top of the wall Foundation Repair, Mechanical, Lawn Sprinkler, Plumbing, In addition, for single family or duplex dwellings, and Single Family & Duplex Re-Roof. no permit is required for: HOW THE PROCESS WORKS: Nonstructural, interior remodeling with no increase in floor area or changing external doors or windows Complete and submit permit application/checklist: Re-roofing that does not exceed $ buildinginspection/ One-story, detached accessory structures less than Submit two sets of plans for review 200 square feet, without utilities Additional information is required in some cases.
3 For Detached patio covers less than 200 square feet, some projects, state law requires plans sealed by an behind front yard setback engineer or architect. Decks, platforms, walks or driveways not more than Wait time varies. Current typical times to first round of 30 inches above grade, not over basement or story review: Prefabricated pools not exceeding 5,000 gallons, Single family / duplex PERMITS : 1 - 3 working days completely above grade Commercial remodel, no use change: 12 working Carports freestanding, detached, 200 square feet or days less, not in front yard setback New commercial CONSTRUCTION : 20 + working days Addition of trim or siding We offer an expedited plan review process Attaching window awnings where awnings don't project more than 54 from wall (or 12 into a set- through our Q-Team. back). Sustainable Development and CONSTRUCTION Building Inspection 320 East Jefferson Boulevard, Dallas , Texas 75203 | 214-948-4480.