Example: bankruptcy

Contractor Health Safety Environment Handbook

V Version date: 22 Dec 2021 Health Safety and Environment (HSE) requirements for contractors #58733578 Contents 1 Introduction .. 3 2 Getting started .. 3 Prequalification 3 HSE in the bidding process 3 Contract risk assessment 4 Significant risk contracts 4 Minimal risk contracts 4 Insignificant risk contracts 4 Water Corporation HSE induction for contractors 4 Site inductions 5 Safety in design report 5 Clearance to work on Water Corporation assets 5 Inspections and audits 5 Contractor evaluation 5 3 General HSE requirements.

Electrical safety in metallic pipeline construction • Pipeline voltage mitigation. 3.3 Water Corporation Safety Essentials Safety Essentials are mandatory requirements for our high risk activities. Each Safety Essential describes the processes and systems that must be established and maintained to conduct the work

Tags:

  Handbook, Electrical, Safety, Electrical safety

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Contractor Health Safety Environment Handbook

1 V Version date: 22 Dec 2021 Health Safety and Environment (HSE) requirements for contractors #58733578 Contents 1 Introduction .. 3 2 Getting started .. 3 Prequalification 3 HSE in the bidding process 3 Contract risk assessment 4 Significant risk contracts 4 Minimal risk contracts 4 Insignificant risk contracts 4 Water Corporation HSE induction for contractors 4 Site inductions 5 Safety in design report 5 Clearance to work on Water Corporation assets 5 Inspections and audits 5 Contractor evaluation 5 3 General HSE requirements.

2 6 Work Health and Safety (WHS) and Environment policies 6 Risk management 6 Water Corporation Safety Essentials 6 Confined space 7 Electricity 7 Energy release 7 Excavations 7 Hazardous materials 8 Falls 8 Lifting 9 Mobile plant 9 Vehicles and trucks 10 Other requirements 10 COVID-19 10 Personal Protective Equipment (PPE) 10 Alcohol and other drugs 10 Concrete and masonry cutting and drilling 11 Prohibited equipment/materials 11 Trenchless technology 11 Hot work 11 4 Minimum Safety standards for AS4000 and AS4902 13 Supervision 13 Subcontractor management 13 Working around services 13 Temporary works 14 Site establishment 14 Site inductions 14 Mental Health 14 Welfare facilities 15 Assurance and reporting 15 3 #58733578 5 Contractor HSE reporting.

3 16 Incident reporting 16 Monthly performance reporting 16 Regulatory notices reporting 16 6 Definitions and abbreviations .. 17 7 Attachments .. 19 Work Health and Safety (WHS) management plan 19 Construction Environment Management Plan (CEMP) 21 Contractor incident report form 22 Referenced Water Corporation documents 24 Document revision history 24 #58733578 1 Introduction This Handbook outlines Water Corporation s general HSE requirements and applies to all contracts. It is available to download from the Health and Safety page on our website Contractors must comply with all legislated HSE requirements in addition to Water Corporation specific requirements as outlined in this document.

4 Any deviation to the requirements stated in this Handbook must be through management plan acceptance and approved on a case-by-case basis for each contract. A coversheet detailing any deviations must be provided with the management plan. Definitions can be found in section 6. 2 Getting started General requirements that apply to contractors are outlined in this document. Additional HSE requirements specific to the scope of work may need to be addressed. These will be outlined in contract documents. Prequalification Prequalification ensures that contractors have appropriate HSE systems in place to identify and control risks associated with the services they provide.

5 Contractors must complete an application to register interest to work with Water Corporation. How to register as a Water Corporation supplier or Contractor Based on selected work categories, the system generates a list of HSE system documents that must be uploaded. Contractors will only be eligible to complete work within the categories for which they hold current HSE prequalification. To find out the status of a pending HSE prequalification assessment, or to check information about an existing HSE prequalification status, access our supplier portal.

6 HSE in the bidding process The HSE bidding process may include an evaluation of: HSE prequalification status bidder s HSE submission including: - HSE systems and past performance - Proposals for addressing HSE risks via Contractor s risk register, SWMS or SWPs - Company licences (such as demolition licence or asbestos removal licence) - HSE management plans - HSE management system certification performance on previous contracts with Water Corporation completion of similar work (type of work /size of contract, for either Water Corporation or elsewhere).

7 Water Corporation may apply additional or alternative HSE selection criteria or processes for large or long term contracts. 4 #58733578 Contract risk assessment Prior to arranging bids, or awarding a contract, Water Corporation s contract manager will assess the level of contract risk. The contract risk level will be assessed as either: significant risk minimal risk insignificant risk This risk level determines the mandatory requirements during the contract, as detailed below. Significant risk contracts The Contractor provides Water Corporation with a contract specific Work Health and Safety Management Plan (WHSMP) and Construction Environment Management Plan (CEMP).

8 The contract manager may require the plans to be varied. For construction work, the Contractor conducts a Construction Risk Assessment Workshop (CRAW) to identify, assess and control significant risks through development of a construction risk register. This risk register forms a part of the WHSMP and CEMP, and must identify where Safe Work Methods Statements (SWMSs) are required for high risk construction work. A WHSMP must be provided when there are five or more people working on site. Guidelines for the development of the WHSMP and CEMP are in section 7.

9 Note Bidders describe methods for addressing significant risks during the bid phase, and this information must be addressed in the risk assessment workshop and carried through to the WHSMP, CEMP, SWMS or Safe Work Procedures (SWPs) after contract award. The contract manager arranges a prestart meeting involving the Contractor and other stakeholders. Minimal risk contracts The Contractor submits safe work procedures and safe work method statements to the contract manager. The contract manager may require these to be varied.

10 Note 1 A WHSMP must be provided when there are five or more people working on a construction site. A WHSMP may be required for some low risk contracts of long duration Note 2 A CEMP must be provided where the contract specifies, see section for what to include in a CEMP. The contract manager arranges a prestart meeting involving the Contractor and major stakeholders. Insignificant risk contracts The contract manager will instruct the Contractor of any site specific requirements in a commencement meeting. Water Corporation HSE induction for contractors All Contractor and subcontractor workers must complete the Contractor HSE induction prior to commencing work.