Transcription of DECRA Villa Tile Installation Details
1 DECRA Villa Tile Installation DetailsDECRA Villa Tile Installation Details DECRA Roofing Systems, Inc. 2008 DECRA Villa Tile Installation DetailsDECRA Villa Tile Installation DetailsVilla Panel DetailDeck Preparation New ConstructionPrepare roof deck to meet local building codes in areas building codes in areas susceptible to freeze/thaw, ice & water shield is recommendedUnderlayment is required one layer Type 15 or Type 30 felt or greater if required by gqylocal codeDeck Preparation Tear-off / Re-roofTear off old roofClean and prepare deck to meet Tear off old roofClean and prepare deck to meet local codesUnderlayment is required one Underlayment is required one layer Type 15 or Type 30 felt or greater if required by local codeDeck Preparation roof Over AsphaltppCut asphalt shingles back flush with the fascia or rakes as needed and remove hip & and remove hip & ridge piecesUnderlayment is Underlayment is required one layer Type 15 or Type 30 felt or t if id greater if required by local codeInstall
2 Stacked 2 X 2 sOver prepared deck, position two stacked 2 x 2s flush along rake/gables, up the center of the hips and along ridgesg,ppggVilla ChannelInstall Villa Channel at rake/gable, roof -to-wall, and along both sides of the 2 x 2s at the hipthe hipVilla Channel - FasteninggOverlap a minimum of 6 fasteners are positioned outside the lt iblast ribVilla ValleyValley pieces should overlap minimum 6 fasteners should be positioned outside the last rib on either side paint the valley before installing panelsUse Villa Valley or standard before installing panelsconcrete valley metal minimum 26 gauge pre-finished aluminum-zinc alloy coated steel, minimum 16 wide with a minimum 3-1/4 16 wide with a minimum 31/4 center upstandIce & water shield recommended for f/thditifreeze/thaw conditions1 x 4 at First CourseInstall a 1 x 4 behind the first course of panels 15-1/2 from the edge of the fasciaeave15-1/2 Fasten to the deck with a screw that will fit flush and is long enough to will fit flush and is long enough to penetrate the deck1 x 4 provides for easier Installation and accurate panel alignmentPanel InstallationLay out panels and fasten as you go along - start at the fascia and work towards the fascia and work towards the ridgeFasten only the back of the first course of panels at the eave the nose of the panel eave
3 The nose of the panel will be fastened after the Bird Stop Eave is installedPanel InstallationPanels can be laid right to left or left to right overlap Periodically check alignment by left or left to right overlap area must be covered by overlapping panelsnapping a chalk line at 14-1/2 intervalsFastener PlacementBird Stop - EaveInstall and fasten Bird Stop Eave afterinstalling a gminimumof two courses above the eaveRequired along the fasciaBird Stop Eave must be notched where it terminates into the Villa Channel into the Villa Channel fasteners placed every 10 Right and left edges notched in the same mannerEave FasteningFasteners will go through the Make sure the Bird Stop Eave nose of the panel and the Bird Stop Eave into the deckfits tight to the first course of panels without gapsPanel Installation Valley & HipypWhen installing along valleys and hips, Villa Panels will terminate into the Villa Channel or Villa Valley cut panels at an angle to fit tight the Villa Channel or Villa Valley, cut panels at an angle to fit tight where they terminateRoof to WallInstall panels up to the wall cut the back of the last course so it fits tight If wall flashing is present.
4 Tuck Villa Channel behind existing flashing cut panel ginstall Bird Stop - Ridgeggpinto the ChannelPanel Installation at RidgeInstall panels up to the 2 x 2 at the ridge cut back the last course so it fits tight against the stacked 2 x 2s use a hand bender to turn up the pan bender to turn up the pan portionBird Stop RidgeInstall by lining up with the back of the cut panel and attaching it to the stacked 2 x 2s overlapping the last course2s overlapping the last courseRidge Ventilation - ExamplesIf a vented ridge is desired, stack three 2 x 2 battens and install along the length of the ridge fasten a 1 x 2 on top install along the length of the ridge -fasten a 1 x 2 on top of the 2 x 2s.
5 Use a 1 venting material and fasten to both sides of the battens along the length of the ridge secure the Hip & Ridge trim through the 1 x 2pggHip and RidgeI t ll l th Install along the rake/gable, hips and ridges fasten through the top down into the pstacked 2 x 2sUse a Tile End Cap to cover open end of Hip & Ridge pieces at fasciaPenetrationsCut a Villa Tile Underpan to fit tight fit the pipe-flashing apron to the Underpan cut ppthe Villa panel to fit tight seal around base and use Touch-up KitChimney, Skylights & DormersCut panels to fit around the chimney, skylight or dormery,y gShort CourseA short course is inserted by cutting off the back shelf of the lower panel A short course is inserted by cutting off the back shelf of the lower panel and running the full panel above over the top fasten through the nose into the high point of the panel belowCapri ClayVenetian GoldRustico ClayPompeii AshAmalfi SandHelpful ToolspVilla Estimating SheetVilla Installation GuideBoth available at DECRA Manufactured Other Manufactures Villa panels Trim 1/Ft.
6 Gable, hip, and ridgellhl 1 X 4 Lumber total eave measurement 2 X 2 Lumber gable, hip and ridge measurement X 2 Or 2 X 4 lumber at gable hip and Villa Channel 6 6 Villa Valley 6 6 Colored #9 X Screws Zinc #9 X 1 5 Screws Or 2 X 4 lumber at gable, hip and ridge total measurement Pipe flashings (Alum works best) UnderlaymentZinc #9 X Screws 4/Panel Eave Bird Stop 5 Ridge Bird Stop 5 Screen Mesh Ridge Vent material Paint Standard Gable Metal WZ only Touch up kit 1/15Sq. Underpans 1/penetration Barrel EndsUnique Situations Trouble-shootingqg Alternate Installation direction every other coursey Install panels from the middle out for long runs Use a stitch screw at back flange overlap to draw up panel Work into valleys and hips Lower batten build up and notch Hip & Ridge at Lower batten build up and notch Hip & Ridge at high points so the barrel fits tighter at low points Weave jack in with paper when using Underpanjpp gp When cutting panel, cut through the back first metal to stone coating