Design and Construction Standards - Emory University

Design and ConstructionStandardsPlanning, Design , and ConstructionEmory University Planning, Design , and Construction Design and Construction Standards Table of Contents *Underlined text indicates changes from prior 1 of 4 Design and Construction Standards December, 2019 TABLE OF CONTENTS Warranty Matrix- Summary of warranty requirements throughout Design and Construction Standards FM Global Matrix Summary of FM Global coordination requirements organized by 00 Procurement and Contracting Requirements 00 00 02 Introduction 00 00 03 Space Needs 00 63 00 Clarifications and Proposals Division 01 Internal Requirements 01 11 00 Summary of Work Requirements 01 31 00 Project Management and Coordination 01 32 00 BIM Guidelines Scope, Deliverables & Progress 01 33 23 Submittals, Shop Drawings.

01 81 13 Sustainable Design Requirements 01 91 13 General Commissioning Requirements ... • Emory College Classroom Design Guide • Emory Lab Design Guidelines. ... 01 50 00 Temp Facilities and Contractor Mobilization Warranties permanent equipment used in a building's temporary facilities must have warranty extended to

Tags:

  Guide, General, Design, Standards, Construction, Facilities, Design guide, Design and construction standards

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Design and Construction Standards - Emory University

1 Design and ConstructionStandardsPlanning, Design , and ConstructionEmory University Planning, Design , and Construction Design and Construction Standards Table of Contents *Underlined text indicates changes from prior 1 of 4 Design and Construction Standards December, 2019 TABLE OF CONTENTS Warranty Matrix- Summary of warranty requirements throughout Design and Construction Standards FM Global Matrix Summary of FM Global coordination requirements organized by 00 Procurement and Contracting Requirements 00 00 02 Introduction 00 00 03 Space Needs 00 63 00 Clarifications and Proposals Division 01 Internal Requirements 01 11 00 Summary of Work Requirements 01 31 00 Project Management and Coordination 01 32 00 BIM Guidelines Scope, Deliverables & Progress 01 33 23 Submittals, Shop Drawings.

2 Product Data 01 41 00 Standard Of Quality and Regulatory Requirements 01 43 39 Mock Ups 01 50 00 Temporary facilities and Contractor Mobilization 01 74 00 Cleaning 01 75 00 Starting and Adjusting 01 77 00 Close-Out Procedures 01 78 23 Operation and Maintenance 01 79 00 Demonstrations and Training 01 81 13 Sustainable Design Requirements 01 91 13 general Commissioning Requirements 01 91 19 Facility Shell Commissioning 01 94 00 Facility Decommissioning Division 02 Existing Conditions 02 62 00 Hazardous Waste Recovery Processes FACILITY Construction Division 03 Concrete 03 00 00 Concrete Division 04 Masonry 04 00 00 Masonry Division 05 Metals 05 00 00 Metals Division 06 Wood, Plastic, and Composites 06 00 00 Wood, Plastic, and Composites Division 07 Thermal and Moisture Protection 07 20 00 Thermal Protection Emory University Planning, Design , and Construction Design and Construction Standards Table of Contents *Underlined text indicates changes from prior 2 of 4 Division 07 Thermal and Moisture Protection (continued) 07 30 00 Steep Slope Roofing 07 50 00 Built-Up Bituminous Roofing 07 60 00 Flashing and Sheet Metal 07 84 00 Firestopping Division 08 Openings 08 00 00 Openings & Doors (includes Wood and Laminate Doors)

3 08 50 00 Windows 08 70 00 Hardware 08 80 00 Glass and Glazing Division 09 Finishes 09 20 00 Plaster and Gypsum Board 09 30 00 Tile 09 51 00 Acoustical Lay-In Ceilings 09 65 00 Resilient Flooring 09 68 00 Carpet 09 90 00 Paints and Coatings 09 95 00 Wall Coverings Division 10 Specialties 10 10 00 Graphics and Signage 10 21 13 Toilet Compartments 10 28 13 Toilet Accessories 10 43 00 Defibrillator, AED Cabinet and Sign 10 44 00 Fire Protection Specialties Division 11 Equipment Requirements 11 24 29 Facility Fall Protection 11 53 13 Fume Hoods 11 53 53 Biological Safety Cabinets Division 14 Conveying Equipment 14 20 00 Elevators FACILITY SERVICES Division 21 Fire Suppression 21 13 00 Fire-Suppression Sprinkler Systems 21 30 00 Fire Pump Division 22 Plumbing 22 00 00 Plumbing Division 23 Heating, Ventilating, and Air-Conditioning (HVAC)

4 23 00 00 Mechanical Narrative and Information 23 05 00 Basic Materials & Methods 23 05 14 Variable Frequency Motor Controls 23 05 19 Utility Metering 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 HVAC Insulation 23 08 00 Commissioning of HVAC 23 09 00 Instrumentation and Control for HVAC 23 21 23 Hydronic Pumps 23 22 00 Steam & Condensate Specialties 23 25 00 HVAC Water Treatment Emory University Planning, Design , and Construction Design and Construction Standards Table of Contents *Underlined text indicates changes from prior 3 of 4 Division 23 Heating, Ventilating, and Air-Conditioning (HVAC) continued 23 25 00a New Building Chemical Station Turn Over 23 30 00 HVAC Air Distribution 23 50 00 Central Heating Equipment 23 57 00 Heat Exchangers for HVAC 23 60 00 Central Cooling Equipment 23 63 13 Refrigerant Condensers 23 64 16 Centrifugal Water Chillers 23 65 13 Cooling Towers 23 65 23 Field-Erected Cooling Towers 23 70 00 HVAC Equipment Division 26 Electrical Electrical Systems Narrative26 00 00 Electrical general Requirements 26 01 00 Basic Electrical Systems Testing By Electrical Contactor 26 05 00 Basic Electrical Materials and Methods 26 08 00 Commissioning of Electrical Systems 26 10 00 Medium-Voltage Electrical Distribution 26 20 00 Electrical Service & Distribution 26 29 00

5 Variable Speed Drives 26 30 00 Standby Power Generator Systems 26 50 00 Lighting 26 60 00 Special Electrical Systems (see Division 28) Division 27 Communications 27 00 00 Emory University Library & Information Technology Services Standards Division 28 Electronic Safety and Security 28 10 00 Electronic Security Systems 28 31 00 Fire Detection and Alarm SITE AND INFRASTRUCTURE Division 31 Earthwork 31 00 00 Earthwork 31 10 00 Tree Protection and Selective Clearing 31 25 00 Construction Storm Water and Erosion Control Division 32 Exterior Improvements 32 00 00 Exterior Improvements 32 12 16 Asphalt Paving 32 12 43 Porous Flexible Paving 32 13 13 Concrete Paving 32 14 16 Pavers 32 16 13 Concrete Curbs and Gutters 32 17 13 Car Stops 32 17 23 Pavement Markings 32 80 00 Irrigation 32 90 00 Planting 32 92 00 Turf and Grasses

6 Emory University Planning, Design , and Construction Design and Construction Standards Table of Contents *Underlined text indicates changes from prior 4 of 4 Division 33 Utilities 33 10 00 Water Utilities 33 30 00 Sanitary Sewerage Utilities 33 40 00 Storm Drainage Utilities 33 60 00 Steam and Chilled Water Distribution Systems Additional Documents by Reference: All referenced document can be downloaded from Campus Services Design and Construction Standard website: Building Information Modeling (BIM) BIM Execution Plan (BEP) template BIM Asset Information Database (BIM-AID) templateSubstantial Completion / Closeout Document Requirements: Document Delivery Standards Architectural Floor Plan Evacuation Guidelines: 2012 Campus Design Guidelines Campus Master Plan Guidelines Emory College Classroom Design guide Emory Lab Design GuidelinesWARRANTY LOGSECTIONS tandard TitleReferenced Sub-sectionsDetail01 50 00 Temp facilities and Contractor MobilizationWarrantiespermanent equipment used in a building's temporary facilities must have warranty extended to coincide with warranties and completion of entire project01 77 00 Close-Out ProceduresSubstantial Completion dateSubstantial Completion (SC) issued the date warranty startsEnd of Warranty Inspectionconducted one year after SC date.

7 05 00 00 MetalsFinishesminimum 20 year warranty against fading, cracking or chipping07 30 00 Steep Slope RoofingExecutioncontract documents will initially require 5 / 75 year limited warranty on roofing systems, unless modification required and assessed by Emory PM. The warranty should include all labor and materials required to make any necessary 50 00 Built-Up Bituminous RoofingProductscontract documents will initially require 20 year warranty on roofing systems, unless modification required and assessed by Emory PMOwner Preferences20-year Total System Warranty without monetary limitation for repair or replacement of failed material or workmanship within warranty period. (Roof leaks included) Includes roofing membrane, base flashings, roof membrane accessories, cover boards, all metal used on project, base sheets and their fasteners, wind speeds up to 73 mph, and other system components.

8 Period begins on date of Substantial Completion. Special Project Warranty determined by installer and meets a minimum 5 years from date of Substantial completion. The warranty should include all labor and materials required to make any necessary 84 00 FirestoppingWarranty and Contractor QualificationsInstaller must warranty firestopping for life of building, Manufacturer must warranty properly installed products for sustainable life of structure. Lack of warranty does not release either's liability for faulty product. 08 00 00 Openings, DoorsLifetime warrantyDoors warrantied for life of installation08 50 00 WindowsRequirementscontract documents require a 5-year warranty on installed windows, unless modification is required and assessed by Emory PM08 70 00 HardwareRequirementsminimum 3-year for hardware (except door closers); 10-year for door closers08 80 00 Glass and GlazingWarrantyProvide insulating glass manufacturer's warranty; include replacement installation costs; include replacement of glass due to nickel sulfide inclusion; warrantied for 10-years after Substantial Completion for all glass types; lack of warranty does not release installer from same requirements.

9 Ensure window film, if used, does not void 68 00 CarpetRequirementsmanufacturer, installer and contractor must submit 20-year warranty10 10 00 Graphics and SignageWarrantied5-year plastic and metal joints, 5-year interior room signs, 8-year vinyl films, 2-year exterior paint finishes, 3-year plastic and metal paint finishes, and at least 1-year electrical components and signs. During warranty, all replacements must meet contract document 20 00 ElevatorWarranty, Subsequent s free warranty and maintenance service year shall begin at Owner acceptance and occupancy. Elevator vender shall accept Emory University standard elevator service contract, which is a premium service arrangement and includes a monthly service inspection, 24 hour free callbacks for all new elevators during the warranty year, a forgiveness clause equal to four normal hours or $640 whichever is greater (for callbacks outside the Contractor s control), and 24 hour free mechanical callbacks for all residential elevators, all parking deck elevators, and others as specified.

10 21 13 00 Fire-Supression Sprinkler SystemsAcceptance Tests, Documentation, WarrantiesMaximum equipment warranty to Owner including minimum 10year materials and workmanship. Repairs during warranty completed promptly at Contractor's expense. 23 05 14 Variable Frequency Motor ControlsWarranty3-year variable speed drive warranty after start-up23 64 16 Centrifugal Water ChillersWarrantyMaterial and labor warranty for chiller and starter (variable speed drive) lasting 15 months after date of factory start-up or 18 months from delivery date - whichever occurs first. 26 30 00 Standby Power Generator SystemsWarranty5-year extended warranty on new generators that match original factory warranty28 31 00 Fire Detection and AlarmWarranty, Subsequent Service, and Initial Inspection Reports2-year installation defects warranty, transfer manufacturer's equipment warranty (minimum 1-year) to Owner, warrantied repairs completed at Contractor's expense.