Example: biology

DNVGL-ST-0358 Offshore gangways

The electronic pdf version of this document, available free of chargefrom , is the officially binding GL ASSTANDARDDNVGL-ST-0358 Edition September 2017 Offshore gangwaysFOREWORDDNV GL standards contain requirements, principles and acceptance criteria for objects, personnel,organisations and/or operations. DNV GL AS September 2017 Any comments may be sent by e-mail to service document has been prepared based on available knowledge, technology and/or information at the time of issuance of thisdocument. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibilityfor loss or damages resulting from any use of this document.

— Sec.7 [7.2.4]: Section has been updated to include more detailed testing requirements and simulator based testing — Sec.7 [7.2.9]: New section has been added • Appendix A — In-operation follow-up requirements have been updated, clarified and moved to App.B.

Tags:

  Simulators

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of DNVGL-ST-0358 Offshore gangways

1 The electronic pdf version of this document, available free of chargefrom , is the officially binding GL ASSTANDARDDNVGL-ST-0358 Edition September 2017 Offshore gangwaysFOREWORDDNV GL standards contain requirements, principles and acceptance criteria for objects, personnel,organisations and/or operations. DNV GL AS September 2017 Any comments may be sent by e-mail to service document has been prepared based on available knowledge, technology and/or information at the time of issuance of thisdocument. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibilityfor loss or damages resulting from any use of this document.

2 Changes - currentStandard DNVGL-ST-0358 . Edition September 2017 Page 3 Offshore gangwaysDNV GL ASCHANGES CURRENTThis document supersedes the December 2015 edition of in this document are highlighted in red colour. However, if the changes involve a whole chapter,section or sub-section, normally only the title will be in red changes October 2017 Introduction [ ]: Application of standard redefined in order to accommodate the introduction of theWalk2work class notation and modular class scheme. [ ]: Fluid service transfers allowed when cables/pipes are fitted with break-away systems. [ ]: Type 4 gangways has been included. [ ]: References have been updated. [ ]: Definitions have been updated.

3 Documentation and certification Table 2-1: Documentation requirements have been updated/clarified. Table 2-2: Clarification has been added. [ ]: Clarification regarding applicability of scope of work have been added. [ ]: Clarification has been added. [ ]: Section has been added. Materials and fabrication Table 3-2: New table has been added. [ ]: Clarification has been added. [ ]: New section bas been added. Structural design and strength [ ]: Rule text has been updated. [ ]: Rule text has been updated. [ ]: Requirements for composite materials added. [ ]: Clarifications regarding LRFD design methodology have been added. [ ]: Rule text has been clarified.

4 [ ]: Section has been updated. Table 4-4: Editorial changes have been made. Table 4-5: Editorial changes have been made. Functional requirements [ ]: New section added. [ ]: Walkway design requirements have been updated. [ ]: Clarification regarding the design requirement has been added. [ ]: Clarification regarding emergency escape has been added. [ ]: Text has been re-written. [ ]: New section added. Changes - currentStandard DNVGL-ST-0358 . Edition September 2017 Page 4 Offshore gangwaysDNV GL AS [ ]: Operating angle now defined as range. [ ]: Rule text has been updated. [ ]: Certification requirements have been added. [ ]: Clarification regarding compliance with a design standard has been added.

5 [ ]: Testing requirements aligned with class practice. [ ]: Text has been clarified. [ ]: Text has been re-written. Safety and safety equipment : Section has been re-written. Sec. 7 Testing and marking Section renamed. [ ]: New section has been added. [ ]: Section has been updated to include requirements for gangways part of/ not part of a classnotation [ ]: Section has been updated to include more detailed testing requirements and simulatorbased testing [ ]: New section has been added Appendix A In-operation follow-up requirements have been updated, clarified and moved to Clarifications regarding the information to be stated in the PC issued by the manufacturer have beenincluded.

6 Appendix B New appendix for periodical survey, tests and repairs,Editorial correctionsIn addition to the above stated changes, editorial corrections may have been made. ContentsStandard DNVGL-ST-0358 . Edition September 2017 Page 5 Offshore gangwaysDNV GL ASCONTENTSC hanges 3 Section 1 2 Documentation and Periodic 3 Materials and Design Structural Material manufacture survey, certification and Structural Fabrication and 4 Structural design and Design Load Strength Design loads type 1 Design loads type 2 46 Section 5 Functional Walking Clear 50 ContentsStandard DNVGL-ST-0358 . Edition September 2017 Page 6 Offshore gangwaysDNV GL Access to gangway and waiting Protecting Operator's Landing Operation Power Electrical installations, equipment and Hydraulic Pneumatic Control and monitoring Control and monitoring systems for active motioncompensating 6 Safety and safety Safety Safety Generic risk Alarm Handling of deviations and extended 70 Section 7 Testing and Functional Load Examination after 8 Type 3 Technical A Examples on basis for acceptance of product certificates issued bythe Transmission gears and slewing B Periodic survey.

7 Tests and ContentsStandard DNVGL-ST-0358 . Edition September 2017 Page 7 Offshore gangwaysDNV GL Survey, tests and Annual 5-yearly Repairs and modifications of 86 Changes DNVGL-ST-0358 . Edition September 2017 Page 8 Offshore gangwaysDNV GL ASSECTION 1 IntroductionHowever, the provisions in this standard should represent the technical conclusion resulted following theselection of the appropriate gangway GL has developed a walk to work (W2W) guidance, Gangway access to Offshore facilities available onDNV GL website and free to download at , to assist Offshore facility operators achievesafe and efficient personnel transfers to/from their facilities via a gangway system on a workboat, ship orsemi-submersible to the proposal of a gangway design.

8 It is recommended that the above mentioned document is used asa reference in better understanding the role of the gangway as an individual piece of equipment in the biggerpicture of manning an Offshore ObjectiveThis standard provides technical and safety guidance for the design and certification of Offshore gangwayswith the purpose of aiding in the development of an alternative solution for manning an Offshore ScopeThis Offshore standard provides criteria and guidance for certification and verification of the design,materials, fabrication, installation, testing and follow-up of gangways used GeneralThis standard describes the procedures and requirements for obtaining certificates for Offshore following topics are covered: design approval materials welding production for operational procedures and training as required for type 3 gangways (see ), are notpart of the standard does not cover the gangway's interfaces with the vessel, welded structural connections andfoundations, electrical/hydraulic power supply, integration with vessel systems or the influence the gangwaymight have on the supporting vessel stability, trim, etc.

9 See relevant rules, DNVGL-CG-0156 and DNVGL-ST-E272 for further Passive and active systemsThe scope of this standard covers both passively and actively motion compensated gangways . The design of passive motion compensated gangways incorporates features that allow the gangwayto accommodate the relative motions between vessels without making use of any external systems orequipment. Active motion compensation implies a system powered by an external power supply that reduces orcancels (compensates) the effect of the vessel motions (from one degree of freedom to all 6 degrees offreedom) on the gangway DNVGL-ST-0358 . Edition September 2017 Page 9 Offshore gangwaysDNV GL Types of gangwaysThe standard covers the following types as related to the operation of the gangway.

10 The appropriate typeshall be agreed with DNV GL prior to commencing Type 1 Uncontrolled flow of people, routine personnel transfer. people move freely between the connected units connection time: indefinite gangway is usually supported in X, Y and Z axis directions at both ends gangway shall not be permanently connected to at least one of the units gangway shall contain means to self-detach at one end and move away in a safe manner and short Type 2 Controlled flow of people, routine personnel transfer. People do not move freely between the connected units, the flow of people is controlled/regulated bymeans of manual ( the gangway operator) or automatic control. Connection time: usually less than 24 hours, the control of the flow of people shall be ensured throughoutthe entire connection time.


Related search queries