ElectricServiceGuidelinesTSN 449260 May 2020 Copyright 2019 Oncor Electric Delivery Company. All rights 2 Important Notice Regarding Removal ofOncor Electric Delivery Company LLC Meters to Perform Work on Customer's PremiseEffective October 15, 2013, as provided for in the Oncor Tariff for Retail Delivery Service approved by thePublic Utility Commission of Texas (PUC), unauthorized removal of an Oncor meter, which includes any workon the customer's equipment that would require cutting the seal and removal of the meter, will result in acharge to the customer of $ Additional charges may also be applied if tampering is determined to ensure that a customer is not charged these fees as a result of work being performed, prior authorizationmust be obtained by following the steps below BEFORE removing self-contained meters (only Oncor isauthorized to remove 480 volt self-contained meters)

If you have questions or need additional information, please refer to the Oncor.com website or call 1.800.518.2374 *If there is a locking mechanism (i.e., such as a lock or locking bar), contact Oncor at 1.800.518.2374 to schedule the removal of the locking mechanism prior to any work being conducted. Only Oncor may remove the locks. Please provide

Tags:

  Norco

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Electric Service Guidelines 2020 - oncor.com

1 ElectricServiceGuidelinesTSN 449260 May 2020 Copyright 2019 Oncor Electric Delivery Company. All rights 2 Important Notice Regarding Removal ofOncor Electric Delivery Company LLC Meters to Perform Work on Customer's PremiseEffective October 15, 2013, as provided for in the Oncor Tariff for Retail Delivery Service approved by thePublic Utility Commission of Texas (PUC), unauthorized removal of an Oncor meter, which includes any workon the customer's equipment that would require cutting the seal and removal of the meter, will result in acharge to the customer of $ Additional charges may also be applied if tampering is determined to ensure that a customer is not charged these fees as a result of work being performed, prior authorizationmust be obtained by following the steps below BEFORE removing self-contained meters (only Oncor isauthorized to remove 480 volt self-contained meters)

2 And disconnecting power at a customer's premise.*Call Oncor at BEFORE removing an Oncor self-contained meter and provide the followinginformation:-Electrical Contractor's Company name-Contact phone number for clarifying information-Contact person's name at Electrical Contractor Company-Address where the work is to be done (if rural, provide directions)-City-Work to be done-Will work require an electrical inspection? (Yes / No)-Date meter will be pulled-Date meter will be replacedUpon receipt of the above notice, Oncor will schedule a trip to the customer's premise after the self-contained meter has been replaced, to inspect and reseal the work is not completed on the date planned, customer or electrician must contact Oncor to avoid a chargebeing number above is answered between 8:00 and 7:00 M-F.

3 For after-hours work, please leave therequired information on the to follow this process will result in the customer being charged, at a minimum $ Additionally, ifthe Oncor meter (or the customer's meter base) is determined to have been compromised and/or damaged,other charges may be you have questions or need additional information, please refer to the website or *If there is a locking mechanism ( , such as a lock or locking bar), contact Oncor at to schedule theremoval of the locking mechanism prior to any work being conducted. Only Oncor may remove the locks. Please provideone business day notice for this type of work to be 2019 Oncor Electric Delivery Company. All rights General Information Codes Governing Electrical Installations Company Service Area Security and Safety Standard Delivery Service 300 Overhead 400 Underground 500 Metering and Associated 600 Temporary GenerationAPPENDIX ATwo Hole Compression Lugs for Terminal BOne Hole Compression Lugs for Submersible Mole CPrimary Metering Equipment 4 Page 5-8 Page 9 Page 10 Page 11 Page 12 Page 14-21 Page 22-32 Page 33-39 Page 40-70 Page 71-73 Page 74-77 Page 78 Page 79 Page 80-83 Copyright 2020 Oncor Electric Delivery Company.

4 All rights 4 This booklet is issued by Oncor Electric Delivery Company LLC (Company) for use by Customers and theiragents. These Electric Service Guidelines supersede all prior issues of the Electric Service Guidelines issued byOncor and are effective with all construction commencing on or after November 1, booklet should be used as a guide in planning the installation of electrical equipment and methods forinterconnection of electrical power and energy with the electrical delivery system of Service methods other than the examples discussed in this booklet are required, the Customer is to obtainwritten Company approval prior to letting bids and installing local inspection authority is not involved, equipment should be installed in accordance with the latestedition of the National Electrical Code or Company specifications when the Company specifications exceedthose of the National Electrical information presented herein will be revised periodically to reflect changes which may develop.

5 It is theCustomer s responsibility for obtaining the latest New Customers Requesting Service , please complete the New Serve Questionnaire found underground utility locating Service :Call 811 before you information about Solar, Battery Storage, or other forms of Customer Owned Distributed Generation(DG) please email OR visiting 2019 Oncor Electric Delivery Company. All rights 100 Page 5 GENERAL INFORMATION CompanyOncor Electric Delivery Company LLC and its officers, agents, employees, successors, and Connected LoadThe combined electrical requirement ( , the sum of the capacities and/or ratings) of all motorsand other Electric power consuming devices installed on the Customer s Transformer (CT)A transformer used in metering applications which reduces, by a definite ratio, the value of primary current to a value usable by the CT Enclosure (also known as CT Can)See instrument transformer CT SocketA meter socket used only with external instrument CustomerAn end-use customer who purchases Electric power and energy and ultimately consumes it.

6 Whenused in the context of construction services, the term Customer also includes property owners,builders, developers, contractors, governmental entities, or any other organization, entity, or individual that is not a Competitive Retailer making a request for such services to the ServiceThe Service performed by Company for the delivery of Electric power and energy. Delivery Servicecomprises delivery system services and discretionary DemandThe rate at which Electric energy is used at any instant or averaged over any designated period oftime and which is measured in kW or Demand IntervalThe specified interval of time on which a demand measurement is based. The Company demandinterval is normally 15 EnergyThe measure of how much Electric power is provided over time for doing work. The electrical unitis the watt-hour, or Extension AgreementThe Service agreement that must be executed by Company and Customer requestingcertain construction services before Company can provide such construction services tothe requesting DEFINITIONSC opyright 2019 Oncor Electric Delivery Company.

7 All rights INFORMATION DEFINITIONS (cont'd)Page Good Utility Practice The term will have the meaning ascribed thereto in PUC Substantive Rules, Section , Definitions, or its ElectrodeA conducting object through which a direct connection to Earth is established. The onlyCompany approved grounding electrode is the Ground Rod. Ufer grounds will not RodThe only Company approved grounding electrode allowed for grounding purposes. Ground Rodshall be made of copper clad steel, 8ft in length and, at least .625 inches in Inspection AuthorityThe governing bodies having jurisdiction over inspection of Customer installations and equipmentand oversight of NEC AgreementThe interconnection agreement sets forth the contractual conditions under which a Company andCustomer agree that one or more facilities (DG) may be interconnected with the Company utility Transformer (IT)Current transformers and voltage transformers are collectively called instrumenttransformers and are used for metering Electric Transformer (IT) Enclosure (also known as CT Can or CT Enclosure)

8 A metal cabinet which houses the Company s instrument transformers when a transocketis not Maximum Available Fault CurrentThe amount of current that will flow due to a direct short circuit from one conductor to ground orfrom one conductor to MeterA device or devices for measuring the amount of Electric power and energy delivered to a particular PackA single enclosure that allows for multiple meters. Before purchasing a meter pack, please contactyour Oncor Representative for SocketA receptacle of weatherproof construction used for mounting a socket type meter. Customer shallpermanently mark each meter socket at multi-meter locations before a meter can be set. pg 45 for 2019 Oncor Electric Delivery Company. All rights INFORMATION DEFINITIONS (cont'd)Page FacilitiesMay include but are not limited to a two-way feed, automatic and manual transfer switches, Delivery Service through more than one Point of Delivery, redundant facilities, facilities in excessof those normally required for Delivery Service , or facilities necessary to provide Delivery Serviceat a non-standard Distributed Generation (DG)An electrical generating facility located at a Customer's point of delivery (point of common coupling) of 10 MW or less and connected at a voltage less than 60 kV which may be connected inparallel operation to the utility OperationThe operation of on-site distributed generation while the Customer is connected to the Company's utility of Common Coupling (PCC)

9 The point where the electrical conductors of the Company utility system are connected to theCustomer's conductors and where any transfer of Electric power between the Customer and theutility system takes place, such as switchgear near the of Delivery (POD, Service Point)The Point at which Electric power and energy leaves the Company delivery CompanyPOD is the same as the NEC Service Point. See NEC Handbook Article 100, Exhibit and Exhibit and Service or rectangular channel or conduit for containing electrical conductors, which may be exposed, buried beneath the surface of the earth , or encased in a building or ServiceNon-residential delivery Service at any one of Company's standard Service voltages listed in , page AgreementAny commission approved agreement between Company and Customer which sets forth certaininformation, terms, obligations and/or conditions of delivery Service pursuant to the provisions ofthe Tariff for Retail Delivery Availability StatementA statement from the Company designating the acceptable location of the Customer s serviceentrance conductors, the proper location of meters and metering equipment.

10 The type of serviceavailable or which will be made available to the specific location under consideration, and thecapacity of the Service to be Disconnect An appropriate means of disconnecting a Service location from the Companies facilities and discontinuing the flow of energy and power. Disconnect must be able to be locked in the "Open" Service DropOverhead conductors that extend from Company s overhead delivery system to the point of delivery (POD) where connection is made to Customer s electrical 2019 Oncor Electric Delivery Company. All rights INFORMATION DEFINITIONS (cont'd)Page Service EnclosureA connection enclosure specified, provided, owned and locked/sealed by the Company. Companyprovides the Service Enclosure to the Customer and it is installed by Customer for the purpose ofconnecting the Service lateral to Customer s electrical installation.