Example: quiz answers

ENGINEERING DESIGN CRITERIA AND STANDARD …

ENGINEERING DESIGN CRITERIA AND STANDARD SPECIFICATIONS CITY OF SAPULPA, OKLAHOMA SAPULPA MUNICIPAL AUTHORITY August 21, 2014 ENGINEERING DESIGN CRITERIA and STANDARD Specifications City of Sapulpa i August 21, 2014 TABLE OF CONTENTS SECTION I. ENGINEERING DESIGN CRITERIA .. 1 DIVISION 100 GENERAL .. 3 100 Development Procedure outline .. 3 101 standards and Specifications .. 4 102 Drafting .. 4 103 Bench Marks .. 6 DIVISION 200 DESIGN CRITERIA FOR WATER MAINS .. 7 200 General .. 7 201 ENGINEERING Report .. 7 202 Water lines .. 7 203 Fire hydrants .. 8 204 ComMercial Fire Protection .. 8 DIVISION 300 DESIGN CRITERIA FOR SANITARY SEWER .. 10 300 General .. 10 301 ENGINEERING Report.

Engineering Design Criteria City of Sapulpa I-2 August 21, 2014 PURPOSE, INTENT, AND INTERPRETATION OF ENGINEERING DESIGN CRITERIA The purpose of these Engineering Design Criteria is to establish, as appropriate, target, minimum

Tags:

  Design, Standards, Engineering, Interpretation, Criteria, Engineering design, Engineering design criteria and standard, And interpretation of engineering design

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of ENGINEERING DESIGN CRITERIA AND STANDARD …

1 ENGINEERING DESIGN CRITERIA AND STANDARD SPECIFICATIONS CITY OF SAPULPA, OKLAHOMA SAPULPA MUNICIPAL AUTHORITY August 21, 2014 ENGINEERING DESIGN CRITERIA and STANDARD Specifications City of Sapulpa i August 21, 2014 TABLE OF CONTENTS SECTION I. ENGINEERING DESIGN CRITERIA .. 1 DIVISION 100 GENERAL .. 3 100 Development Procedure outline .. 3 101 standards and Specifications .. 4 102 Drafting .. 4 103 Bench Marks .. 6 DIVISION 200 DESIGN CRITERIA FOR WATER MAINS .. 7 200 General .. 7 201 ENGINEERING Report .. 7 202 Water lines .. 7 203 Fire hydrants .. 8 204 ComMercial Fire Protection .. 8 DIVISION 300 DESIGN CRITERIA FOR SANITARY SEWER .. 10 300 General .. 10 301 ENGINEERING Report.

2 10 302 DESIGN Flows .. 10 303 Sewers .. 11 304 Manholes and Lampholes .. 12 305 Service Connections .. 12 306 Crossings .. 12 DIVISION 400 DESIGN CRITERIA FOR STREETS .. 14 400 General Requirements .. 14 401 Plan Sheets and Profiles .. 14 402 Geotechnical Report .. 15 403 Street Functional Classification .. 16 404 Streets .. 16 405 Intersection DESIGN .. 17 406 Traffic Impact of Developments .. 19 ENGINEERING DESIGN CRITERIA and STANDARD Specifications City of Sapulpa ii August 21, 2014 407 Typical Sections .. 20 408 Cross Sections .. 22 409 Structures And Specific Details .. 22 410 Sidewalks .. 23 411 Driveway Approach standards .. 24 412 Special Conditions .. 26 413 Signage.

3 28 414 Striping .. 28 415 Easement and Right-Of-Way .. 29 416 Paving DESIGN .. 29 417 Lighting .. 31 418 Cut Back Parking on Public Right-Of-Way .. 33 419 Arterial Access .. 34 420 Typical Sections .. 35 421 Cross Sections .. 36 422 Structures and Specific Details .. 36 423 Easement and Right-Of-Way .. 36 424 Lighting .. 37 DIVISION 500 STORMWATER DRAINAGE CRITERIA .. 38 500 Policies .. 38 501 Lot Drainage .. 40 502 Easements .. 42 503 Revisions to Floodplain Maps .. 43 504 Acceptance of Existing Stormwater Drainage Facilities .. 44 505 Technical Requirements .. 45 506 Storage Requirements .. 55 507 Drainage Plans and Studies .. 61 508 Submittal Requirements .. 62 509 Maintenance Bond.

4 68 DIVISION 600 SOIL EROSION AND SEDIMENTATION CONTROL .. 69 ENGINEERING DESIGN CRITERIA and STANDARD Specifications City of Sapulpa iii August 21, 2014 600 GENERAL .. 69 601 AREA OF 69 602 DESIGN REQUIREMENTS .. 69 603 PROTECTION OF SURFACE WATER: NATURAL BUFFERS AND EQUIVALENT SEDIMENT CONTROLS .. 69 604 INSTALLATION OF PERIMETER CONTROLS .. 70 605 MINIMIZE SEDIMENT TRACK-OUT .. 70 606 CONTROL DISCHARGES FROM STOCKPILED SEDIMENT OR SOIL .. 70 607 MINIMIZE DUST .. 71 608 MINIMIZE THE DISTURBANCE OF STEEP 71 609 PRESERVE TOPSOIL .. 71 610 MINIMIZE SOIL COMPACTION .. 72 611 PROTECT STORM DRAIN 72 612 CONSTRUCTED STORMWATER CONVEYANCE CHANNELS .. 72 613 SEDIMENT BASINS.

5 72 614 DEWATERING PRACTICES .. 73 615 STABILIZATION REQUIREMENTS .. 73 SECTION II. STANDARD SPECIFICATIONS .. 1 DIVISION 1100 GENERAL SPECIFICATIONS .. 3 1100 Scope and Location .. 3 1101 Scope, Nature, and Intent of Specifications and Drawings .. 3 1102 Lines And Grades .. 3 1103 Protection of Property .. 4 1104 5 1105 References to Other Specifications .. 6 1106 Protection of Materials .. 6 1107 6 1108 Or Equal Clause .. 7 1109 Dewatering .. 7 1110 Safety .. 7 ENGINEERING DESIGN CRITERIA and STANDARD Specifications City of Sapulpa iv August 21, 2014 1111 Removal of REJECTED Materials and Structures .. 8 1112 Traffic Control Devices .. 9 1113 Clean-Up .. 9 1114 Street Wash Down.

6 9 1115 Placing Work in Service .. 9 DIVISION 2200 WATER & SEWER MATERIAL SPECIFICATIONS .. 10 2200 Submittals .. 10 2201 Concrete .. 10 2202 Ductile Iron Pipe, Ductile and Cast Iron Fittings, and Valves .. 18 2203 Steel Pipe and Fittings .. 24 2204 Reinforced Concrete Pipe and Fittings .. 28 2205 Polyvinyl Chloride (PVC) Pipe, Water Service .. 30 2206 HIGH DENSITY POLYETHYENE (HDPE) Pipe, Water Service .. 30 2207 Polyvinyl Chloride (PVC) Pipe, Sewer Service .. 30 2208 Castings .. 31 2209 Conduit .. 31 2210 Vault, Pits and Manholes .. 31 2211 Sand for Cushion or Backfill .. 32 2212 Crushed Stone for Surfacing, Base, Course, and Stabilization .. 32 2213 Rip Rap .. 32 DIVISION 2300 WATER & SEWER CONSTRUCTION SPECIFICATIONS.

7 34 2300 Right-Of-Way Clearing And Restoring .. 34 2301 Excavation and Backfill, Unclassified .. 35 2302 Concrete Cradle and Concrete Encasement .. 37 2303 Pipe, Reinforced Concrete .. 37 2304 Pipe, Ductile Iron .. 38 2305 Pipe, Steel .. 39 2306 Polyvinyl Chloride (PVC) OR HIGH DENSITY POLYETHLYENE (HDPE) Pipe, Water Service .. 39 2307 Locator Wire and Detectable Marking Tape .. 40 ENGINEERING DESIGN CRITERIA and STANDARD Specifications City of Sapulpa v August 21, 2014 2308 Tapping of PVC Pipe for Service Connections .. 40 2309 Fittings .. 41 2310 Polyvinyl Chloride (PVC) Pipe, Sewer Service .. 41 2311 Manhole .. 42 2312 Connection .. 44 2313 Lamphole .. 45 2314 Valve.

8 45 2315 Valve Box .. 46 2316 Encasement, Concrete .. 46 2317 Cradle, Concrete .. 47 2318 Piers, Reinforced Concrete .. 47 2319 Conduit .. 47 2320 Structure, Special .. 48 2321 Materials Furnished By Contractor And Installed By City .. 48 2322 Sodding and 48 2323 Driveway Crossing By Boring .. 49 2324 Pavement, Removal and Replacement .. 50 2325 Erosion Control 50 ENGINEERING DESIGN CRITERIA City of Sapulpa I-1 August 21, 2014 SECTION I. ENGINEERING DESIGN CRITERIA FOR THE CITY OF SAPULPA AND SAPULPA MUNICIPAL AUTHORITY ENGINEERING DESIGN CRITERIA City of Sapulpa I-2 August 21, 2014 PURPOSE, INTENT, AND interpretation OF ENGINEERING DESIGN CRITERIA The purpose of these ENGINEERING DESIGN CRITERIA is to establish, as appropriate, target, minimum and/or maximum standards for the DESIGN and development of construction plans to be furnished by the Consulting Engineer for development within the City of Sapulpa.

9 While certain interim requirements may be imposed, it is the intent of these ENGINEERING DESIGN CRITERIA that the consulting (development) Engineer be fully and exclusively responsible for producing an acceptable end product. City of Sapulpa personnel, except where specifically provided for herein, will make reviews for the City to document that an acceptable product is being produced. interpretation of these ENGINEERING DESIGN CRITERIA will be done in such a manner as to allow the Consulting Engineer to control the product which is, in all respects, acceptable. These ENGINEERING DESIGN CRITERIA should not, however, be interpreted in any manner which allows a consulting Engineer to produce an unacceptable product or endanger the health, safety or welfare of the general public.

10 Only projects in substantial conformance with these ENGINEERING DESIGN CRITERIA will be accepted by the City of Sapulpa. Review of development plans, details, submittals and reports may be performed by an outside consulting engineer under contract with the City for providing the review services and herein referred to as the City Engineer and will work under the direction of the Public Works Department. All correspondence shall be directed to the City staff with a copy to the City Engineer. In cases of direct correspondence with the City Engineer, the developer s representative shall copy City staff in the Planning Department and the Public Works Department. ENGINEERING DESIGN CRITERIA City of Sapulpa I-3 August 21, 2014 DIVISION 100 GENERAL 100 DEVELOPMENT PROCEDURE OUTLINE Developer should coordinate the proposed development or project with the Public Works Department office during his/her preliminary studies and before actual DESIGN begins.


Related search queries