ERECTION AND SAFETY MANUAL BUILDING SYSTEMS

Technical information contained herein is subject to change without AND SAFETY MANUALBUILDING SYSTEMSPage : 0 April 2002 INTRODUCTION FOUNDATION AND BUILDING General Foundation Information Foundation Checking Procedure Anchor Bolt Settings Access to Site Unloading Operations Location of BUILDING Parts UNLOADING HANDLING AND Wall and Roof

SAFETY FIRST RIGID BUILDING SYSTEMS, LTD., has a commitment to manufacture quality building components that are designed to meet the structural requirements of the building. However, the safety commitment and jobsite practices of the …

Tags:

  Manual, System, Safety, Building, Erection, Erection and safety manual building systems

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of ERECTION AND SAFETY MANUAL BUILDING SYSTEMS

1 Technical information contained herein is subject to change without AND SAFETY MANUALBUILDING SYSTEMSPage : 0 April 2002 INTRODUCTION FOUNDATION AND BUILDING General Foundation Information Foundation Checking Procedure Anchor Bolt Settings Access to Site Unloading Operations Location of BUILDING Parts UNLOADING HANDLING AND Wall and Roof

2 Cable Structural Framing ERECTION OF PRIMARY AND SECONDARY General Recommended Unloading Raising Rigid Connection Completing and Plumbing the First Erecting the Column and Beam Erecting the Remaining Wind Bracing General R PBR AW Roof and Wall Fastener Aligning the Wall Roof Installation of Wall SAFETY Precautions For Roofing Prepairing the Installation of the First Roof Sealing the SidelapTABLE OF 65 ERECTION AND SAFETY MANUALT echnical information contained herein is subject to change without SYSTEMSPage : 0 April Sealing The Sealing the Panel Roof Sheeting Installation of Roof Peak Panel Skylight Tape Sealant Application at Ridge FLASHING, GUTTER AND Gutter Rake Trim and Peak Box Flashing Caulk and Lap 78 ERECTION AND SAFETY MANUALT echnical information contained herein is subject to change without SYSTEMSPage : 0 April 2002 SAFETY FIRSTRIGID BUILDING SYSTEMS , LTD.

3 , has a commitment to manufacture quality BUILDING components that aredesigned to meet the structural requirements of the BUILDING . However, the SAFETY commitment and jobsitepractices of the erector are beyond the control of is urgently recommended that the safe working conditions and accident prevention practices be the toppriority on the job site and that local, state and federal SAFETY and health standards always be followed tohelp insure worker SAFETY . These points cannot be stressed too SAFETY is a joint responsibility of all parties present on the jobsite, including owners, architects,engineers, contractors, subcontractors, delivery personnel, and employees of all the above, among should be watchful to avoid hazards which might cause damage to property or injury to any person,including make certain all employees know the safest and most productive way of erecting a BUILDING alongwith emergency telephone numbers, location of first aid stations and emergency procedures.

4 Avoid workingduring inclement weather periods when personnel are at risk due to high winds, lightning, precipitations, recommends daily meeting highlighting SAFETY procedures, the use of hard hats, rubber sole shoesfor roof work, proper equipment for handling material and appropriate SAFETY gear, including nets MANUAL should be interpreted and administered with sound judgement consistent with goodsafety practices. Its information is to be disseminated to all workers on the jobsite. Where anydoubt exists as to language or direction of this MANUAL , do not take a risk, play it safe .IMPORTANT!READ AND UNDERSTAND THIS PAGE BEFORE PROCEEDING WITHANY WORK OR FURTHER READINGALL DETAILS, RECOMMENDATIONS AND SUGGESTIONS IN THIS MANUAL ARE FORGENERAL GUIDELINES ONLY, AND NOT MEANT TO BE ALL INCLUSIVE.

5 INDUSTRYACCEPTED INSTALLATION PRACTICES WITH REGARDS TO ALL AREAS NOTSPECIFICALLY DISCUSSED IN THIS MANUAL MANUAL SHOULD BE EXPERIENCED, KNOWLEDGEABLE ERECTORS FAMILIAR WITH ACCEPTEDPRACTICES SHOULD BE USED TO ASSURE A QUALITY AND SAFETY MANUALT echnical information contained herein is subject to change without SYSTEMSPage : 0 April 2002 INTRODUCTIONRIGID BUILDING SYSTEMS , LTD., manufactures high quality, pre-engineered metal BUILDING ERECTION is essential to complete the structure to the satisfaction of the MANUAL has been prepared to help guide the ERECTION process and reflects the techniques in use in themetal BUILDING industry believed to be most representative of good ERECTION practices. These proceduresand methods are by necessity general in nature.

6 The erector should always, especially in specialcircumstances, use proven and safe ERECTION ERECTION MANUAL is intended only as a supplement to the ERECTION drawings that are furnishedwith each BUILDING . The ERECTION drawings show the customer s BUILDING as engineered and fabricatedaccording to his requirements. The BUILDING ERECTION drawing will always govern with regard to constructiondetails and specific BUILDING parts. Contact your sales representative to resolve any matters not information contained in this MANUAL is believed to be reliable, however, RIGID disclaims any responsi-bility for damages which may result from use of this MANUAL since the actual ERECTION operations and condi-tions are beyond RIGID s control. Only experienced, knowledgeable erectors with trained crews andproper equipment should be engaged to do the is emphasized that RIGID is only a manufacturer of metal buildings and components and is not en-gaged in the ERECTION of its products.

7 Opinions expressed by RIGID about ERECTION practices are intendedto present only a guide as to how the components could be assembled to create a BUILDING . The experience,expertise and skills of the ERECTION crews as well as the equipment available for handling the materialsdetermines the quality and SAFETY of ERECTION and the ultimate customer satisfaction with the MBMA s CODE OF STANDARD PRACTICE shall govern with respect to the fabrication tolerances, ERECTION methods, and all field work associated with the project in questionThe erector should familiarize himself with the contents of this document. Additional copies may be re-quested at a nominal AND SAFETY MANUALT echnical information contained herein is subject to change without SYSTEMSPage : 0 April GENERAL FOUNDATION INFORMATIONRIGID recommends that all BUILDING foundations, including pier sizes, grade beams and floor slabs, be de-signed by an experienced local foundation engineer.

8 This engineer can also recommend excavation proce-dures, drainage practices, form work, reinforcing steel requirements and concrete proportioning. This willassure proper designs, expedite the work and reduce construction techniques should be adhered to in the foundation work. The bottoms of all excavationsshould be level and smooth, and care should be taken to prevent cave-ins when utilizing the walls of theexcavations for concrete forms. Strict adherence to OSHA and other local codes or laws governing shoring ofexcavation to prevent accidental cave-ins is critical. Where the ground surface is not level, the bottoms of thefoundations should be in steps coinciding with the piers (as shown). Fill areas should be properly compactedto prevent settling cracks.

9 Footing should extend below any fill should be taken to obtain a good finish on the floor slab and to maintain the correct elevation throughoutthe slab. Shrinkage cracks can be minimized by pouring the slab in alternate sections, checker board fash-ion . The outer corners of the foundation walls and piers should be sharply formed with straight sides and leveltops. This will allow neat seating and good alignment of the base OF GRADE BEAMGRADE BEAMS POUREDAGAINST EARTH SIDES ANDBOTTOMNATURAL GROUNDSLABFOOTING ORPIER FOUNDATION AND BUILDING ANCHORAGEERECTION AND SAFETY MANUALT echnical information contained herein is subject to change without SYSTEMSPage : 0 April FOUNDATION CHECKING PROCEDUREThe importance of accurate foundation construction and anchor bolt settings cannot be errors and mislocation of anchor bolts are among the most frequent and troublesome errors madein metal BUILDING construction.

10 The Following procedures and methods, should help to minimize these costlyerrors and delays. 1. To determine that the foundation is square, measure diagonal dimensions to be sure they are ofequal length. 2. To determine that the foundation is level, set up a transit or level and use a level rod to obtain theelevation at all columns and posts. 3. Carefully check the location of all anchor bolts against the Anchor BoIt drawing fumished by RIGID. All dimension must be identical to assure proper DIMENSIONMUST BE EQUALERECTION AND SAFETY MANUALT echnical information contained herein is subject to change without SYSTEMSPage : 0 April ANCHOR BOLT SETTINGSIt is extremely important that anchor bolts be placed accurately in accordance with the anchor bolt settingplan.