Example: tourism industry

ES - Cement Silos

TUBULARCEMENT - FLYASHSCREW CONVEYORSESESESESESCATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS2 TUBULAR Cement SCREWS CONVEYORS PageStandard Standard Cement Round Inlet / Outlet Spout - Universal Inlet and Outlet Code < 10 CATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS3 STANDARD INSTALLATION1rotomcirtcelE2recuderraeG)t capmoC(3gnilaestfahsrecuderraeG4tuopstel nI5gnisuohralubuT6hctahnoitcepsnI7gnirae betaidemretnI8gniraebdneteltuO9laripS01e yegnitfiL11rebmunlaireS21gniraebdnetelnI 31tuopsteltuOCATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS4 INQUIRY FORMINSTALLATION / DIMENSIONSC onveyor s Diameter De =..Length (Center inlet to center outlet) L =..Angle of Inclination a =..Inlet Diameter (Circular) D1 =.

catalog 2002 es - tubular cement screws conveyors 4 inquiry form installation / dimensions conveyorís diameter de =.....

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of ES - Cement Silos

1 TUBULARCEMENT - FLYASHSCREW CONVEYORSESESESESESCATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS2 TUBULAR Cement SCREWS CONVEYORS PageStandard Standard Cement Round Inlet / Outlet Spout - Universal Inlet and Outlet Code < 10 CATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS3 STANDARD INSTALLATION1rotomcirtcelE2recuderraeG)t capmoC(3gnilaestfahsrecuderraeG4tuopstel nI5gnisuohralubuT6hctahnoitcepsnI7gnirae betaidemretnI8gniraebdneteltuO9laripS01e yegnitfiL11rebmunlaireS21gniraebdnetelnI 31tuopsteltuOCATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS4 INQUIRY FORMINSTALLATION / DIMENSIONSC onveyor s Diameter De =..Length (Center inlet to center outlet) L =..Angle of Inclination a =..Inlet Diameter (Circular) D1 =.

2 Outlet Diameter (Circular) D2 =..OPTIONAL INLETS & OUTLETSI nlet Swivel Swivel Spout Swivel Swivel Spout Inlet (Dimensions: L1 x L2)..Square Outlet (Dimensions: L1 x L2)..OPERATIONI ndoor or outdoor per & HANGER BEARINGSS pecial sealsSpecial hanger bearings* Specify useMATERIAL SPECIFICATIONSE xtracting - Flood - Controlled Particle MATERIALC arbon steel Steel 304 construction (TU only)..F*yes*yesnonoLbs/CF%Lb/minCF/HrHz *yesno1 coat of primer & 1 coat of LAWRENCEVILLE, GA * APPLICABLE SALES OR USE TAXES TO BE PAID BY THE BUYERALL PRICES SUBJECT TO CHANGE WITHOUT NOTICECATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS5*YTICAPACNIM/SBL332 NIM/SBL0501 NIM/SBL0082 NIM/SBL0004 NIM/SBL0006 NIM/SBL0007)OSE411(aiD"4)1SE861(aiD"6)3S E912(aiD"8)4SE372(aiD"01)5SE323(aiD"21)5 XE323(aiD"21M1 STANDARD Cement SCREW ES SCREW CONVEYORS ARE SPECIFICALLY DESIGNED FOR Cement , FLYASH, AND SIMILAR PRODUCTSCODE BREAKDOWNES.

3 (external diameter in mm).(lengh in meters).(motor size)EXAMPLE: = 8 diameter - 7 meters long - kW (15HP)* NOTE: THE CAPACITY REFERS TO PORTLAND Cement AT 70 LBS/CFFLYASH CAPACITY IS APPROXIMATELY ONE HALF OF ABOVE CAPACITIESOPTION: NON STANDARD CAPACITIES ARE AVAILABLE, CONTACT OUR TECHNICAL DEPARTMENTNOTE: LENGTH IS MEASURED FROM CENTER OF INLET TO CENTER OF #YTISNED3 EDOCLAIRETAMAMEC)dnaltroP(detareA,tnemeC 57-06M51001 AhsaylF54-03M6304 ADIAMETERFEET / METERSCATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS6 DIMENSIONS - GEARBOXEStinUmmsehcnIS "4"6"8"01"21"4"6"8"01" MOTORS= 45 = 0 2002ES - TUBULAR Cement SCREWS CONVEYORS7 STANDARD ROUND INLET / OUTLET SPOUTXBCCodeXBC D AC 1F = with flangeT = with beaded edgeD A edoC*"C"T-F- anognidnepedgk 0 5 01 51 02 52 03 53 04 54 FTFTFTFTFTFTFTFTFTFT411411 #522572#522572#5225723861861 # # 2002ES - TUBULAR Cement SCREWS CONVEYORS8 OPTIONALS - UNIVERSAL INLET AND OUTLET SPOUTINLETOUTLETItem 1 Item 4 Item 3 Item 861861093531532352739158312 861391583531532352791208312 861912083521532352737252412 2002ES - TUBULAR Cement

4 SCREWS CONVEYORS9 MODULAR CODE KEY1st GROUPSTRUCTURE12345671234567123456712345 67123456712345671234567 InclinationInlet-outlet length114168 - 273323 Inlet typeA = UniversalC = Circular+ = None or specialInlet diameterInlet heightOutlet typeB= UniversalC= Circular+= None or specialeOutlet diameterOutlet heightmmmmmmmmcmmm degreesES ESL ESVPipe diameter114 = 4 168 = 6 219 = 8 273 = 10 323 = 12 CATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS102nd GROUPDRIVE UNIT123456712345671234567123456712345671 2345671234567 Gear reducerM11 - M12 - M15 - M17 - M19 - L19 - L17 Gear ratio05 - 07 - 10 Inst. drive power01 10 - 01 50 - 02 20 - 03 00 - 04 00 - 05 0007 50 - 09 20 - 11 00 - 15 00 - 18 50 - 22 00 Nbr of poles48 = 4/840 = 4 Voltage supply208 V230 V460 V575 VCycles50 = 50 Hz60 = 60 Hz++ = non-WAMD rive positionC = Inlet endT = Outlet endMODULAR CODE KEYESESCode(mm)

5 6 8 10 12 12 RangeStandard Feed Rate CementLength RangeStandard Screw- Motor-Gearbox- Inlet & discharge with samediameter as trough tube- Motor and gearbox on inlet sideOptions- Drive on disharge end- Heavy-duty hanger bearings- Swivel spout - Ranges from 6 -12 on top and/or bottomEND BEARINGF aster installationLower maintenancePortland Cement 70 lbs / cfSwiwel Spout - Ranges from 6 - 12 for inlet or dischargeSpline DesignINTERMEDIATE BEARING- Engineered for minimum product obstruction- Low maintenance- Transmits none torque- Better alignimentMODULAR CONSTRUCTION- Ease of shipping- Pre-assembledStandard hanger inspectionShot blastedPrimer / Finish coatSPLINED COUPLINGF aster installation - Lower maintenanceSWIWEL SPOUT ADJUSTABLE INCLINATIONF lexible tolerance - Allow for easy field installationGEARBOXH eavy-duty construction - Oversized SCREW CONVEYORS AREESPECIALLY DESIGNED FORCEMENT AND FLYASH Code BreakdownES.

6 (external in mm).(length in meters).(motor size)Example: = 8 diameter - 7meters long - kW ( Hp) Average 2 weeks deliveryModular constructionEASES THE ASSEMBLINGA verage 2 weeks deliveryFast assemblyRigid constructionEase of shippingBENEFITFUNCTIONFEATURESAll connections splinedHeavy-duty gearboxSpecial designedintermediate bearingsModular ConstructionEASES THEASSEMBLING/DISASSEMBLINGAND INSTALLATIONDIRECT DRIVEREDUCES PRODUCT OBSTRUCTIONADJUSTABLE ANGLE OF INCLINATIONH igher strength than standardcompetitor bolted shaftsNo beltsNo slippageLower maintenanceHigher loadsBetter alignementLess playAllows easy adjustementsduring installation CATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS13 COMPONENTS AND ACCESSORIES SECTION PageOutlet End Bearing End

7 Bearing Bearing Heavy Duty Hanger Assembly - Flanges / Adjustable Support 2002ES - TUBULAR Cement SCREWS CONVEYORS14 OUTLET END BEARINGXTAXTAAS00E01 Feeder0 = 1141 = 1682 = 1933 = 2194 = 2735 = 323 edoCNID2845D E1E2E3E4EF 1F 2F 3 FKgkgniraeB 2002ES - TUBULAR Cement SCREWS CONVEYORS15 INLET END BEARINGXTBedoCINU7936C NID2845D E1E2E3E4E5E6EF 1F 2F3 FKLxHxGNID5886gkgniraeBesaerG Feeder0 = 1141 = 1683 = 2194 = 2735 = 323 CATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS16edoC tfahS redeeFABCD ELM Feeder010 = 114015 = 168017 = 193020 = 219025 = 273030 = 323 028 = 114040 = 168 - 219 - 273 - 323 CAST ALUMINIUM HANGER STRUCTURE WITH INCORPO-RATED SELF-LUBRICATING BUSHThe hanger is made up in two parts to enable dismantling without removing the BEARINGXLRCATALOG 2002ES - TUBULAR Cement SCREWS CONVEYORS17edoC tfahS redeeFABC DLM HEAVY DUTY HANGER ASSEMBLYXLYCATALOG 2002ES - TUBULAR Cement SCREWS B C GssenkcihTfoepyTSFV evlaVgk N - FLANGES / ADJUSTABLE SUPPORT XJXA djustable supports are strong pipe clamps used for fixing of the feeder to an existing structure and to prevent vibrations and can be mounted at any point of the pipe section, as they are made up of two half-rings that are bolted.

8 GalvanizedMounted on frameworkExample of applicationOPTION ADJUSTABLE 2002ES - TUBULAR Cement SCREWS CONVEYORS19 OPERATION AND MAINTENANCEOPERATION AND MAINTENANCE PageAssembly Instructions When Using WAM Butterfly of Hanger and and Maintenance 2002ES - TUBULAR Cement SCREWS CONVEYORS201)The VFS-type valves made of aluminium alloy are not designed to bear the weight of equipment installed below ( screw feeders, beltconveyors, vibratory feeders etc.).2)To fix the valve, only use stud bolts that are long enough to pass through the upper connecting flange, the valve itself as well as the lowerconnecting flange, forming a sandwich. Screw on the nuts firmly but not excessively. The inside nuts have no weight-bearing function.

9 Theyonly serve to secure the valve when the feeder installed below is stripped )Apply a thin layer of liquid seal before fitting the valve to the connecting )Close the valve only when material is )Clean the valve regularly with either air or water. This is particularly important if the material handled tends to compact or to solidify due tolonger shutdown )Operating temperature < 80 )The material weight resting on the disc must never be greater than its maximum static torque. As it is difficult to calculate this weight exactlydue to varying material properties, as rule of thumb, one may consider there are no problems with bulk densities < t/m3 in standard hoppersand silos8)Refer to assembly instructions on WAM actuators included in each AND MAINTENANCEASSEMBLY INSTRUCTIONS WHEN USING WAM BUTTERFLY VALVEREPLACEMENT OF SEALS IN DRIVE HEAD AND IN END BEARING ASSEMBLYR eferring to carry out the following steps.

10 1) Close silo ) Empty screw ) Disconnect electric motor from ) Open inspection ) Prevent the inlet screw (D) from sliding out by introducing a plank (A) into the inlet hatch ensuring plank firmly locks ) Ensure eyebolt (F) of electric motor is tightly screwed ) Fix the lifting device to the eyebolt (F).8) Remove reducer flange bolts and remove gear motor (B).9) Replace seals (C) with new ) Reassemble parts proceed-ing in the opposite way as same operations apply also if drive unit is at outlet if the sealing of the end bearing has to be 2002ES - TUBULAR Cement SCREWS CONVEYORS21 OPERATION AND MAINTENANCEWith reference to Fig. 2 carry out the following steps:1) Open inspection hatch beneath the bearing to be ) Remove bolts that fasten the two bearing ) Lower bearing half is now free.


Related search queries