Transcription of ESTIMATION FOR CONSTRUCTION OF BUILDING
1 HEIGHTLENGTHWIDTH1columns1 x walls1 x walls1 x 2 walls1 x walls1 x x x walls1 x walls1 x x walls1 x walls1 x x x beamLong beams1 x Beams1 x beams1 x beams1 x PER m3 AMOUNT IN IN FOR CONSTRUCTION OF BUILDINGNAME OF THE WORK: CONSTRUCTION OF SCHOOL BUILDING LOCATION : BADVEL, KADAPA DT. ANDHRAPRADESH, INDIAORGANIZATION: MOTHER TERESA MAHILA MANDALI ADDRESS: 3/24 SURENDRA NAGAR BADVEL KADAPA DIST. INDIA 516227 FOUNDER & PRESIDENT: JINKA SANTHAMMAAREA m3 Earth work excavation and depasting soil in initial lead and lift in , red earth and ordinary gravel etc. completeSand filling and water ramming including the cost of conveyance of all materials and laborcharges in foundation and basement in stanford in (1:4:8) to use 40 mm metal including the cost off conveyance of all materials and labor charges in (1:6) including the cost of conveyance of all materials and laborcharges (1:2:4) to use 40 mm metal including the cost and conveyance of all materials and labor charges etcdRoof BeamsLong beams1 x beams1 x beams1 x Beams1 x Slab1 x case1 x walls1 x walls1 x walls1 x walls1 x x Windows1 x Doors1 x Windows1 x walls1 x walls1 x walls 11 x walls 21 x x 130 x 100 x 120 x 120 X 90 x 120 - Steel grills including the cost and conveyance of all materials and labour chargesBrick Masonary (1.)
2 6) including the cost of transportation & labor chargesSupply and fixing of doors and windows including transportation & labor chargesPlastering with (1:4) 20mm thick including labor and transportation charges10 Class Rooms1 x x Room1 x x Room1 x with vertificient tiles in required sizes 10 cms thick 40 mm metal including transportation & labor wash with two coats including the labor & transportation costsProvision for Electrical Charges@ % Sub Total T O T A L GROUND FLOOR1a Columns1 x beamsLong Beams1 x beams1 x Beams1 x Beams1 x Slab1 x Columns42 per KgbRoof Beams1038 per KgcRoof Slab1729 per Kg3 Long Beams1 x walls1 x walls1 x 6 x Doors1 x x Doors1 x x walls1 x walls1 x walls 11 x walls 21 x with vertificient tiles in required sizes 10 cms thick 40 mm metal including transportation & labor charges1 x charges @ with (1:4) 20mm thick including labor and transportation chargesSub TotalT O T A L FIRST ( 1:2:4) to use 20 mm metal including labor & transportation costsSSF Steel grills including labor & transportation costs Brick masnary (1:6) including labor & transportation costs Supply and fixing of doors and windows including transportation & labor x 90 x 160 x 120 KgsFIRST (1:2:4) to use 20 mm metal including labor & transportation costs aColumns1 x Beam1 x Beam1 x4 Slab1 x kgsRoof Beams330 kgsRoof Slab887 kgs3 Long walls1 x Walls1 x Doors1 x Windows1 x walls1 x Walls1 x with Rajasthan Marbles including labor & transportation costs1 x Charges % for Sanitary and water supply for staircase with for Balcony for Septic - = x 130 x 120 x 90 kgsSupplying & Fixing of Doors Windows including labor & transportation costs Plastering with (1.
3 4) 20 mm thick including labor & transportation TotalT O T A L second floorSECOND FLOORSSF Steel grills including labor & transportation costs Brick masnary (1:6) including labor & transportation costs $GROUND OF THE WORK: CONSTRUCTION OF SCHOOL BUILDING LOCATION : BADVEL, KADAPA DT. ANDHRAPRADESH, INDIAORGANIZATION: MOTHER TERESA MAHILA MANDALI ADDRESS: 3/24 SURENDRA NAGAR BADVEL KADAPA DIST. INDIA 516227 FOUNDER & PRESIDENT: JINKA SANTHAMMA