Example: confidence

EXAMPLE HOTEL PROJECT SCHEDULE OF VALUES …

A B C D E F G H. 1 EXAMPLE HOTEL PROJECT SCHEDULE OF VALUES . 2 LINE ITEMS TO BE DERIVED FROM SPECIFICATIONS. 3. 4 A B C D E F. 5 Division Line Item Description Scheduled Completed Completed Total Percentage Balance 6 value Previously This Period Completed Completed To Finish 7. 8 1 GENERAL REQUIREMENTS. 9 Services 10 Utilities 11 Permits 12 Job Office Trailer 13 Portable Toilets 14 Trash Dumpster 15 Equipment Rental 16 Storage Trailer Rental 17 General Labor 18 General Building Materials 19 Insurance 20 Overhead and Profit 21 Contingency 22 2 SITEWORK. 23 Excavation and Backfill 24 Asphalt Paving 25 Concrete Curbing 26 Wheelstops and Bollards 27 Concrete Sidewalks and Patio 28 Stamped Concrete Paving 29 Underground Water Supply 30 Underground Drainage 31 Site Lighting 32 Dumpster Enclosure/Shed 33 Retaining Walls 34 Termite Control 35 Landscape Irrigation 36 Landscape Planting 37 3 CONCRETE.

1 2 3 4 5 6 7 AB CDEFGH EXAMPLE HOTEL PROJECT SCHEDULE OF VALUES LINE ITEMS TO BE DERIVED FROM SPECIFICATIONS A B C D E F Division Line Item Description Scheduled Completed Completed Total Percentage Balance

Tags:

  Project, Schedule, Value, Example, Example hotel project schedule of values, Hotel

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of EXAMPLE HOTEL PROJECT SCHEDULE OF VALUES …

1 A B C D E F G H. 1 EXAMPLE HOTEL PROJECT SCHEDULE OF VALUES . 2 LINE ITEMS TO BE DERIVED FROM SPECIFICATIONS. 3. 4 A B C D E F. 5 Division Line Item Description Scheduled Completed Completed Total Percentage Balance 6 value Previously This Period Completed Completed To Finish 7. 8 1 GENERAL REQUIREMENTS. 9 Services 10 Utilities 11 Permits 12 Job Office Trailer 13 Portable Toilets 14 Trash Dumpster 15 Equipment Rental 16 Storage Trailer Rental 17 General Labor 18 General Building Materials 19 Insurance 20 Overhead and Profit 21 Contingency 22 2 SITEWORK. 23 Excavation and Backfill 24 Asphalt Paving 25 Concrete Curbing 26 Wheelstops and Bollards 27 Concrete Sidewalks and Patio 28 Stamped Concrete Paving 29 Underground Water Supply 30 Underground Drainage 31 Site Lighting 32 Dumpster Enclosure/Shed 33 Retaining Walls 34 Termite Control 35 Landscape Irrigation 36 Landscape Planting 37 3 CONCRETE.

2 38 Cast-in-Place Concrete Footings 39 Concrete Slab-on-Grade 40 Precast Concrete Planks 41 Gypsum Underlayment 42 4 MASONRY. 43 Block Masonry 44 Cultured Stone 45 Brick Masonry 46 5 METALS. 47 Structural Steel 48 Miscellaneous Steel 49 Steel Stairs and Railings 50 6 WOOD AND PLASTICS. 51 Rough Carpentry 52 Wood Roof Trusses and Decking 53 Finish Carpentry 54 Cabinetwork 55 Granite 56 Cultured Marble 57 7 THERMAL AND MOISTURE PROTECTION. 58 Sheet Waterproofing 59 Dampproofing 60 Building Insulation 61 EIFS. 62 Metal Roofing 63 Membrane Roofing 64 Roof Accessories, Gutters, Downspouts 65 Firestopping 66 Caulking 67 8 DOORS AND WINDOWS. 68 HM Frames 69 HM Doors 70 Wood Doors 71 Access Doors 72 Aluminum Storefront 73 Automatic Sliding Entrance Doors 74 Windows 75 Door Hardware 76 Electronic Hardware 77 Mirrors Glued to Wall A B C D E F G H. 1 EXAMPLE HOTEL PROJECT SCHEDULE OF VALUES .

3 2 LINE ITEMS TO BE DERIVED FROM SPECIFICATIONS. 3. 4 A B C D E F. 5 Division Line Item Description Scheduled Completed Completed Total Percentage Balance 6 value Previously This Period Completed Completed To Finish 7. 78 9 FINISHES. 79 Steel Stud Framing 80 Gypsum Board 81 Suspended Ceilings 82 Resilient Tile Flooring and Base 83 Ceramic Tile 84 Carpet Labor 85 VWC Labor 86 Painting 87 Fiberglass Reinforced Panels 88 10 SPECIALTIES. 89 Corner Guards 90 Flagpoles 91 Fire Extinguishers and Cabinets 92 Toilet and Bath Accessories 93 Metal Lockers 94 Closet Shelves and Rods 95 11 EQUIPMENT. 96 FF&E Installation 97 12 FURNISHINGS. 98 FF&E Installation 99 13 SPECIAL CONSTRUCTION. 100 Swimming Pool and Spa Tank 101 Swimming Pool and Spa Equipment 102 Swimming Pool and Spa Deck 103 14 CONVEYING SYSTEMS. 104 Elevator 105 Linen Chute 106 15 MECHANICAL. 107 Fire Sprinkler System Riser 108 Fire Sprinkler System Piping 109 Fire Sprinkler System Trim 110 HVAC Ductwork Systems 111 HVAC Equipment 112 PTAC Equipment 113 Gas Systems 114 Water Heating Equipment 115 Plumbing Systems- Below Slab 116 Plumbing Systems- Above Slab Rough-in 117 Plumbing Fixtures and Trim 118 16 ELECTRICAL.

4 119 Electrical Power- Site and Below Slab 120 Electrical Power- Distribution Switchgear 121 Electrical- Above Slab Rough-in 122 Electrical- Devices 123 Light Fixtures- Building 124 Light Fixtures- Site 125 Fire Alarm Systems 126 Subtotal Division 1-16. 127. 128. 129 CO CHANGE ORDERS. 130. 131. 132. 133 Subtotal Change Orders 134. 135. 136 MISC MISCELLANEOUS. 137. 138. 139. 140 Subtotal Miscellaneous 141. 142. 143 Subtotal Division 1-16 & Change Orders & Misc. 144. 145. 146.