F-15 AIRFRAME MOUNTED - Garrett Retirees' Club …

F-15 AIRFRAME MOUNTED ACCESSORY DRIVE SYSTEM I moved back into the Journal Building in early 1970 and joined the F-15 Project, whichwas just setting up manpower requirements. At this time, Tom Williams was the ProgramManager and Pete Engel was the Senor Project Engineer. Wade Brock, John Irwin and I came onas Project Engineers. The system consisted of a Jet Fuel Starter (Model JFS190-1), a Left HandAirframe MOUNTED Accessory Drive (LH AMAD), a Central Gear Box (CGB), a Right HandAirframe MOUNTED Accessory Drive (RH AMAD), and two Power Takeoff Shafts (PTO).

ACCESSORY DRIVE SYSTEM I moved back into the Journal Building in early 1970 and joined the F-15 Project, which was just setting up manpower requirements.

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of F-15 AIRFRAME MOUNTED - Garrett Retirees' Club …

1 F-15 AIRFRAME MOUNTED ACCESSORY DRIVE SYSTEM I moved back into the Journal Building in early 1970 and joined the F-15 Project, whichwas just setting up manpower requirements. At this time, Tom Williams was the ProgramManager and Pete Engel was the Senor Project Engineer. Wade Brock, John Irwin and I came onas Project Engineers. The system consisted of a Jet Fuel Starter (Model JFS190-1), a Left HandAirframe MOUNTED Accessory Drive (LH AMAD), a Central Gear Box (CGB), a Right HandAirframe MOUNTED Accessory Drive (RH AMAD), and two Power Takeoff Shafts (PTO).

2 Because it was a very large system, the work load was assigned as follows: Wade wasresponsible for the JFS, John was responsible for the three gear boxes, and I was responsible forPTO shafts and all reports and data. Dick Mejdrick became the Controls Coordinator, Bob Wellsbecame the Preliminary Design Coordinator, and Andy Bouche, Jerry Cargill, Tom Donaldson,Art Eckstat, Fred Fuller, Dick Luther, and Jim Sanger joined in various assignments. Ben Rosswas our Contract Administrator and Faye McDonald, ably assisted (?)

3 By Sheela, was the officeboss who maintained order and managed to keep most of the personnel in I start presenting the details of the JFS/AMAD system, I should review the historyof AiResearch and the Accessory Drive System (ADS). Sometime early in the 1960's, Del Getzand Walt Ramsaur initiated a company sponsored program to develop an ADS system. It wasassigned to my ATM/CSDS project. We designed, fabricated and tested a boiler plate system todemonstrate the concept. Evert Chapman did the major design work and Maury Davis and BruceTice accomplished the testing.

4 Figure 1 presents the system schematic. Figure 1-Accessory Drive System Schematic2A conceptual mockup of the system is presented in Figure 2 and Figure 3 Figure 2 Figure3 The boiler plate accessory drive gearbox, which is the heart of this system, is presented in Figure 4. The system capabilities were very successfully 4-Accessory Drive System Test Gearbox3 During an October 4-8, 1965 meeting, SAE Paper No. 650828, titled IntegratedSecondary Power System (ADS), by Palmer Wood and William Spragins, was presented at theNational Aeronautic and Space Engineering and Manufacturing Meeting in Los Angeles, Calif.

5 As a result of this Independent Research and Development (IRD) program, the AIRFRAME MountedAccessory Drive (AMAD) system became a preferred method to separate a large gear box with itsattendant accessories from the main engine. The concept resulted in many aircraft F-15 system layout work was done by Ron Kubinski, Carl Warner, John Robertson,Carl Tamarin and John Foster. The system is required to provide self-contained main enginestarting and ground check of all aircraft systems utilizing a small gas turbine (JFS), the mountingof an Integrated Constant Speed Drive and Generator (IDG), a Power Control Hydraulic Pumpand a Utility Hydraulic Pump on each gearbox (AMAD) that receives power from either the JFSor the main engines via a Power Takeoff (PTO) Shaft.

6 The Jet Fuel Starter Model JFS190-1 consisted of a gas generator, composed of a singleradial compressor stage and a single axial turbine stage, delivering the required energy to a singleaxial power turbine stage. The required ancillary components were MOUNTED externally on theunit. The Model JFS190-1 mounts directly to the Central Gearbox (CGB) by a V-Band clampmounting pad arrangement. The CGB contains a spur gear train, two high-speed bevel gear sets,a dry multidisk clutch and two isolation decouplers.

7 The spur gear train provides the power fromthe power turbine to the input side of the multidisk clutch. The bevel gears provide the powertransfer path between the output side of the clutch to either of the AMADs through the isolationdecoupler mechanisms. The isolation decoupler is a pawl-and ratchet mechanism. A ratchet islocated on each outboard side of the CGB and can be selectively and singularly extended by oilpressure to engage the ratchet mechanism located on the inboard side of the AMAD. Retractionby a coil spring is automatic upon completion of the function.

8 The CGB contains sensors,controls, a wet sump lubrication system and a cooling system required for the JFS/CGB tofunction properly. The CGB also mounts a small permanent magnet generator and a smallhydraulic pump/motor that charges a hydraulic accumulator which is the means for JFS starting. The CGB becomes the manager of the AMAD utilizes a high speed crossover (lay) shaft, which incorporates the pawlmechanism of the pawl and ratchet clutch, to transmit power directly from the CGB to the enginePTO via a bevel gear set located at the engine input pad.

9 Other features of the AMAD are a spurgear train (to drive the IDG, two hydraulic pumps) and a wet sump lubrication system. The portAMAD has a manually operated mechanism that permits ground maintenance operation of theaccessories by disconnecting the AMAD from the left-hand general arrangement of the system is displayed in Figure 5. Note that General CurtissLeMay, a member of his staff and Garrett s Mark Bradley signed while visiting the F-15 Project. They must have used LeMay s CIA pen for over the years it has faded very badly!

10 4 Figure 5An increased work load and interface with MCAIR required additional personnel includingreorganization of the Project. The revised organization is displayed in the following functionalchart. 5 Much of the detail design was completed and by April 19, 1971, DATA ITEM Z2002,PS-5044-ZZ titled ODE TO A MATURING PROJECT OR FROM PROTOZOA TO AMEBA was prepared by Anonymous A-1 and approved by Anonymous A-2. The following is a directcopy and identifies many contributors to this effort. 6Of course all knew that this wonderful report was the work of Chuck Bishop.