FACT SHEET City of Dallas, Love Field Airport Parking Garage B

FACT SHEET City of dallas , love Field AirportParking Garage BConstruction Timeline August 2001 Began construction June 24, 2002 Opened 1,200 new Parking spaces to public October 1, 2002 Opened additional 1,200 Parking spaces to public March 28, 2003 Opened additional 1,606 spaces - facility completed andopened to the publicCost The $59 million budget was funded through a revenue bond approved by theCity of Hunt Construction Group, Inc. Construction Manager Thomas S. Byrne, Inc. General Contractor HNTB Feasibility Study and Schematic Design Architect Huitt-Zollars, Inc. - Architect of Record for Design Development andConstructionFeatures New four-level covered Garage provides 4,006 Parking spaces, increasingtotal Parking capacity to more than 7,000 spaces.

FACT SHEET City of Dallas, Love Field Airport Parking Garage B Construction Timeline • August 2001 Began construction • June 24, 2002 Opened 1,200 new parking spaces to public

Tags:

  Field, Parking, Dallas, Love, Garage, Airport, Love field airport parking garage

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of FACT SHEET City of Dallas, Love Field Airport Parking Garage B

1 FACT SHEET City of dallas , love Field AirportParking Garage BConstruction Timeline August 2001 Began construction June 24, 2002 Opened 1,200 new Parking spaces to public October 1, 2002 Opened additional 1,200 Parking spaces to public March 28, 2003 Opened additional 1,606 spaces - facility completed andopened to the publicCost The $59 million budget was funded through a revenue bond approved by theCity of Hunt Construction Group, Inc. Construction Manager Thomas S. Byrne, Inc. General Contractor HNTB Feasibility Study and Schematic Design Architect Huitt-Zollars, Inc. - Architect of Record for Design Development andConstructionFeatures New four-level covered Garage provides 4,006 Parking spaces, increasingtotal Parking capacity to more than 7,000 spaces.

2 Includes bright, 1,500-foot climate-controlled pedestrian concourse completewith ten moving walkways and public art installation. Garage design offers exceptional lighting, improved pedestrian and vehiclemobility along with an overall upgrade in service to love Field customers. Skybridge offers easy access to main terminal. Six elevators service three Garage B locations. Two elevators and two escalators carry passengers down two stories to themain check-in lobby. New Garage B rate - up to $ per day. ADA accessible Parking spaces are available. Garage B = 1,447,584 square feet Concourse = 49,975 square feet Skybridge = 2,420 square feetParking Information Tune in to love Radio 1580 AM (within three to five miles of the Airport ) Call to hear Parking lot vacancy information.

3 Check online at further information contact: dallas love Field , Department of Aviation, 8008 Cedar Springs Road, dallas , Texas