Example: bachelor of science

FEATURE ARTICLE The MDLT-1302T Partial-Flow …

34 FEATURE ARTICLEThe MDLT-1302T Partial-Flow dilution tunnel for transient Test Cycle PM SamplingAbstractThe current steady-state test cycles used to measure particulate matter (PM) in engine exhaust will be replaced bytransient test cycles in near future. Horiba has recently developed a PM sampling system using a partial flow dilutionmethod, the MDLT-1302T , to perform sampling during transient test cycles. The MDLT-1302T has been evaluatedusing a heavy-duty diesel engine operating under the Euro transient Cycle (ETC) and Feaeral Test Procedure (FTP) transient cycle, and the results prove that a fast flow control has been achieved with a response time of less than This paper describes the performance of the MDLT-1302T and the technical challenges encountered duringits MDLT-1302T Partial-Flow dilution Tunnelfor transient Test Cycle PM SamplingYutaka YamagishiMini TunnelsFull TunnelsFull / Mini / Micro TunnelsMicro TunnelsMini Tu

34 FEATURE ARTICLE The MDLT-1302T Partial-Flow Dilution Tunnel for Transient Test Cycle PM Sampling Abstract The current steady-state test cycles used to measure particulate matter (PM) in engine exhaust will be replaced by transient test cycles in …

Tags:

  Tests, Tunnel, Flows, Transient, Dilution, Flow dilution tunnel for transient test

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of FEATURE ARTICLE The MDLT-1302T Partial-Flow …

1 34 FEATURE ARTICLEThe MDLT-1302T Partial-Flow dilution tunnel for transient Test Cycle PM SamplingAbstractThe current steady-state test cycles used to measure particulate matter (PM) in engine exhaust will be replaced bytransient test cycles in near future. Horiba has recently developed a PM sampling system using a partial flow dilutionmethod, the MDLT-1302T , to perform sampling during transient test cycles. The MDLT-1302T has been evaluatedusing a heavy-duty diesel engine operating under the Euro transient Cycle (ETC) and Feaeral Test Procedure (FTP) transient cycle, and the results prove that a fast flow control has been achieved with a response time of less than This paper describes the performance of the MDLT-1302T and the technical challenges encountered duringits MDLT-1302T Partial-Flow dilution Tunnelfor transient Test Cycle PM SamplingYutaka YamagishiMini TunnelsFull TunnelsFull / Mini / Micro TunnelsMicro TunnelsMini TunnelsFull TunnelsMicro Tunnelsflow rate of exhausted gas I/mFlow rate sample gas I/mDriving modePM measurementin transit testcar speedtimeFlow rate change of exhausted gas andsample gascorrelation between flow rate of exhaust gas ofsample gasflow rate of

2 Sample gas I/mtime(s)flow rate of exhausted gasflow rate of sample gasflow rate of exhausted gas I/mFEATUREARTICLE35 Technical Reports3 IntroductionThis paper describes the performance of the MDLT-1302T Partial-Flow dilution tunnel , a system that willallow highly reliable particulate matter emissionsmeasurements of diesel engine exhaust when dieselengines are tested under the transient test cycles that willsoon be required by a diesel engine is driven under simulated roadconditions, condensed carbon particles and high-boiling-point hydrocarbons emitted from the tailpipe generateparticulate matter (PM). To measure PM emissionsduring simulated driving conditions in the laboratory, adilution tunnel is used.

3 Until recently, only full dilutiontunnels can be used to operate effectively when theengine was operated under transient test cycles andpartial flow tunnels could not apply to transient new transient test regulations place additionaldemands on dilution sampling system which shall be metby fast response flow control systems, if partial flowsamplling method was used for required transient of the dilution tunnel andTransient Test CyclePM measurement has previously used a full flow dilutiontunnel where the entire amount of engine exhaust gas iscollected and made available for sampling. However, underthis sampling method the size of the dilution tunneldepended on the exhaust gas volume: the greater thevolume of exhaust gas from the test engine, the larger thedilution tunnel system must be.

4 The Partial-Flow dilutiontunnel eliminates this problem by permitting sampling of apart of the total exhaust flow. The Partial-Flow dilutiontunnel system first separates the flow of engine exhaust bya constant split ratio before the exhaust stream is fed intothe dilution tunnel . The dilution tunnel dilutes and coolsthe exhaust gas using dilution air. Then the diluted exhaustpasses through filters after the tunnel to prepare for PMsampling. The following equation shows the relationship ofthe engine exhaust gas flow-rate and the diluted exhaustgas flow-rate:r === const. ------- (1)Gsam = Gtot GdilWhere Gexh : Total flow-rate of engine exhaust gasGtot: Flow-rate of diluted exhaust gasGdil: Flow-rate of dilution airr: Split ratioGsam: Flow-rate of engine exhaust gas to be sampled1As shown in equation (1), to maintain a constant dilutedexhaust flow-rate (Gtot), it is necessary to control thedilution air flow-rate (Gdil) at an early stage before theengine exhaust gas flow (Gexh) changes rapidly.

5 Thus,high-speed measurement and control of the dilution airflow is required for the Partial-Flow dilution tunnel if it isto operate under transient test DevelopmentOur approach to developing the MDLT-1302T Partial-Flow dilution tunnel started with improvements made todilution tunnels used for steady-state emissions began by making improvements in the speed ofmeasurement and control for steady-state test provides a schematic of the a dilution tunnel usedin steady-state cycle PM emissions Flow Schematic of the dilution tunnel for aSteady-State Test Cycleexhausted gasenginemicro-tunnelPM picking filterventuri flow

6 Venturi Flow MeterHoriba s dilution tunnel uses highly accurate venturiflow meters that are free from errors caused bydifferences in the densities of the many different gaseouscomponents of the sample, especially CO2 and H2O. Thedensity of engine exhaust gas is nearly constant and thusdoes not present measurement problems when venturiflowmeters are shown in , the venturi flow meter has aconfiguration where the diameter sharply decreases fromthe inlet to the throat and gradually expands towardsoutlet. Here the flow-rate measurement is based on theproportional relationship of the velocity of the gas andthe square root of the differential pressure caused by twodifferent velocities of the gas-the pressure at the inlet andthe pressure at the throat.

7 Because the equation relies onthe square root of the pressure differential, measurementsusing a venturi flow meter are more accurate at highflow-rates. Chart 3 shows a measurement accuracy curvethat illustrates this GdilGsam36 FEATURE ARTICLEThe MDLT-1302T Partial-Flow dilution tunnel for transient Test Cycle PM Partial-Flow Sampling by the Blower Pump andPredictive ControlIn the Partial-Flow dilution tunnel system, the dilutedexhaust flow rate is maintained by controlling therotation speed of the pump installed after the tunnel andPM sampling filter. Because moving a large flow of airgenerates a large inertia, if a large-volume pump is usedto control the flow of dilution air a response delay isunavoidable.

8 This is why different types of blowers areused. Control of the dilution air requires fast response tocontrol inputs so the dilution air pump uses a low-inertiavortex blower. The diluted exhaust flow does not requiresuch a fast response, so a positive displacement rootblower is shows a typical step response of dilution air flow-control when a venturi flow meter is used with a vortexblower. Here the delay time (Td) is approximately and the response time at 90% of indication (T90)is only the exhaust gas flow rate from the testedengine varies rapidly but gradually than the step change,a response time of second for T90 is an acceptableresult in , the delay time (Td) needs a furtherimprovement.

9 The predictive control method is used inthis purpose. Under this method the test engine performsa certain simulated driving cycle before PM samplingbegins. This allows collection of time sequence data onthe exhaust gas flow. Based on this data, the actual PMtest is performed using the delay-time correction thusderived. shows that this method reduces samplingerror to 5% or Configuration of the Venturi Flow Measurement Accuracy of the Venturi Flow Meterflow rate accuracy ( %)flow rate (l/m)goal flow rateresponse curve ofthe dilution airmeasured response curvesTd= 4 The Step Response of Flow Control Using theAir Flow Control Error by the PredictiveControl Method37 Technical The Step Response of Flow-control Using thePiezo-Valve4 Further Speed-Up Development of MDLT-1302T To satisfy the need for fast flow-rate control, Horiba hasdeveloped the MDLT-1302T Partial-Flow dilution tunnelfor use with transient test cycles.

10 Shows a flowschematic of the MDLT-1302T . The followingparagraphs discuss some of the new technologies appliedin developing this new dilution Flow Schematic for the Fast Response dilution Air Flow Control byPiezo ValveThe two major factors that affect delay in performingaccurate measurement during a transient cycle are: 1) thetime delay between the sampling of exhaust gas and itsmeasurement and; 2) the delay in the flow control of thedilution tunnel . The first factor can be corrected by usinga predictive control method as discussed in section the problems posed by the second factor, , speeding up the response time of the dilution tunnelflow control, is discussed in the following first approach replaced the vortex blower rotationcontrol method with a new flow control method that usesa supply of compressed air controlled by a piezo-electricvalve.