Fugitive Emissions Solutions From OMB Valves

Fugitive Emissions SolutionsFrom OMB Valves2 Customer Requirements Emissions reduction for plant safety and environmental protection. Reduced product loss Less maintenance3 Process Unit Emissions mostly come from Valves Refinery Emissions are equally shared between process units, drains and tanks. 75% of process unit Emissions come from pipeline Unit EmissionsComponents% Leaking% Total FugitiveEmissionsPipeline Valves375 Relief Seals Model Refinery (5 refinery study)4 Valve Maintenance 50% to 85% of valve maintenance is related to the stem seal. George Mc Killop STLE End-users try to reduce maintenance by specifying gland design and minimum standards for sealing Stem Seal Types Compression packing.

3. Process Unit Emissions . mostly come from Valves • Refinery emissions are equally shared between process units, drains and tanks. …

Tags:

  Valves

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Fugitive Emissions Solutions From OMB Valves

1 Fugitive Emissions SolutionsFrom OMB Valves2 Customer Requirements Emissions reduction for plant safety and environmental protection. Reduced product loss Less maintenance3 Process Unit Emissions mostly come from Valves Refinery Emissions are equally shared between process units, drains and tanks. 75% of process unit Emissions come from pipeline Unit EmissionsComponents% Leaking% Total FugitiveEmissionsPipeline Valves375 Relief Seals Model Refinery (5 refinery study)4 Valve Maintenance 50% to 85% of valve maintenance is related to the stem seal. George Mc Killop STLE End-users try to reduce maintenance by specifying gland design and minimum standards for sealing Stem Seal Types Compression packing.

2 Speciality Bellows A bellows seal is the most effective to prevent any Fugitive emission where the process fluid is compatible and the cost can be justified. Frank Zezula. BP Group Research and Engineering Centre, Sunbury-on-Thames 16th Jan >100000100000100001000500250500 Braided Synthetic Fibre Thermal PlasticHigh Temp BraidedFlexible GraphitePolymeric BellowsMetal Bellows0100200300400500600700800900 Fluid Temperature oCEmission Control Levels (Maximum PPM)Valve Stem Seal Application Chart7 Packing in useGland Packing Dimensions(mm)TYPEA ( )B( )H(TotalSetHeight)Equivalent no. square ringsT215,79,53195T317,211,11195T417,211 ,11265T519,312,7275T626,316305T832,219,0 5365T2526,314,5305T2730,119,05305T91836, 222,23485T251330,116385T25283925,46068 Gasket in useSpiral Wound Gasket Dimensions(mm)TYPEA ( )B( )C(Thickness)40x3040303,548x3848383,554x 4454443,566x5466543,574x6074603,579x6779 673,595x7895783,59 Standard Graphite Packing Graphite combination packing Top and bottom rings pure preformed carbon fiber, acting as combined anti-extrusion and wiper rings.

3 Intermediate flexible graphite sealing ring(s).Braided end ringBraided end ringSealing ring(s)10 Std. Packing Specification Sealing Rings in pure flexible graphite with corrosion inhibitor Density g/cm3 Purity min. 98% graphite max 50 ppm chlorides to ASTM C871 max 700 ppm sulphur to ASTM D129 max 1800 ppm iron Braided Wiper/Anti-Extrusion Rings in 98% pure carbon fibre. Temperature range of packing combination set: -200oC to +540oC (up to 600oC for Steam only)11 Specification Compliance The packing design comply with API602 / ISO15761para Packing, packing chamber and gland12 Specification Compliance The stuffing box clearances comply with API602 / ISO15761para Packing, packing chamber and glandRobotized machining units and specially designed tools ensure consistent quality on high volume production batches13 Specification Compliance The OMB standard packing meets the requirements of most major end-users.

4 The stuffing box clearances also comply with specific customer standards ( Shell) 14 Specification Compliance OMB Valves meet the requirements of the USA Clean Air Act. Testing per 1151 METHOD 21 - DETERMINATION OF VOLATILEORGANIC COMPOUND LEAKS15 New Valve Emission Performance Using Helium gas and a detector with sniffer attachment US Method 21 gland leakage from new Valves is guaranteed less than 100ppm.(Testing procedure available on request) Bonnet gasket leakage is guaranteed to be 0 TRB801 TUV Bayernsince 1996 Approvals & QualificationTA-LUFT Emission TestTUV Bayern certified Valves since 1998 Gate, globe and check Eco-L- Valves Bellows Seal Valves Ball Valves17 New Developments in Emission Control Attempts to qualify valve emission performance based on realistic testing.

5 Testing includes mechanical and thermal cycles to simulate plant operation. Valves are classified according to Emissions performance achieved against a particular test Developments in Emission Control ISO specification since beginning of 2007 ISO 15848-1the specification introduce a Type Test and a Production test method for qualificationOMB performed tests in 2005 BP were the first to qualify on-off bulk supplied Valves in this way (ISA testing)OMB qualified the Valves in 2003 Shell have adapted the principle for their own emission testing specification 77 qualified the Valves in 2003 The API 622 specification: introduced in qualified the Valves in 200819 BPEVFP Qualification OMB Valves were fitted with Garlock EVSP 9000 (FVP) gland packing to meet BP s qualification requirements BP usedISA Method for theEvaluation of External leakage of Manual andAutomated On-Off allowableLeakage ppmMechanicalcyclescompletedThermalcycle sNo of sealadjustments@ n cycles110010051 @ 85210010051 @ 6531009041 @ 40410010051 @ 7051009041 @ 40610010051 @ 50710010051 @ 4081009041 @ 40 All exceeded 3 thermal cycles with 1 re-tighten.

6 Mechanical cycling of the Valves was by hand operation. Valves were electrically traced and lagged and heated using a temperature controller to thermally cycle 20-200-20oC five 9000 FVP Emission Test21 Valves fitted with Garlock EVSP9000 FVP come withspecial nameplate to identify the packing 9000 FVP Packing22BP ChemicalsEnvironmental Friendly Valvesince 2001 Approvals & QualificationEmission Test3rdpart laboratory (UK) 1000 operational cycles 2 Thermal cycles Garlock EVSP9000 FVP -100 PPM23 ARMASEAL 312 Specification Sealing Rings in pure flexible graphite with corrosion inhibitor T/B Density g/cm3 Int. Density g/cm3 Purity min.

7 98% graphite max 50 ppm chlorides max 700 ppm sulphur max 1800 ppm iron TOP & BOTTOM RINGS Die-Formed Graphite Sealing Rings reinforced with stainless steel mesh. The top & bottom rings are produced from pure graphite. Temperature range of packing combination set: -200oC to +540oC (up to 600oC for Steam only) Developed by CMD srl, in use since 200324 Shell 77/312 Qualification OMB Valves were fitted with special designed packing (model Armaseal 312) developed internally with CMD srl (OMB std packing supplier) Type Test is based on 15848-1 and is performedduring the Type Approval Test (TAT) in accordance toShell Global Solutions procedure25 Shell 77/312 Qualification Type Approval Test is performed on specially designed equipment to meet Temperature requirements26 Shell Global SolutionsFugitive Emission 77/312since 2003 Approvals & QualificationEmission Test3rdpart laboratory (NL)

8 And internal Test 100 operational cycles Full Rating Pressure 2 Thermal cycles ARMASEAL 312 packing -70 PPM (class B)27 Shell 77/312 Qualification 28 Shell Global SolutionsFugitive Emission 77/312since 2003 Gate, globe and check Valves : to 2 150 to 2500 classesClass B and Class A (with bellows seal)Ball Valves to 12 150 to 600 Class AApprovals & Qualification29 ISO CD 15848 Emission Tests30 ISO CD 15848 Emission TestsOMB Valves tested to ISO15761 With 3rdparty certificatesGate, globe and check Valves : to 2 150 to 1500 classesClass B 150 to 800 classesClass A (with bellows seal)Ball Valves : to 2 150 to 600 classesClass A31 ISO 15848-1 Emission TestsEnd User requirementsWithin the ISO requirements, many end users added either specific test requirements (such as Total) or specific performance classes (no of cycles and temperature)OMB has worked successfully in the past 3 years with the following end users for Type Test requirements on different projects:- Agip KCO- Neste Oil- Total (downstream)32 ISO 15848-1 Emission TestsNeste Oil.

9 Project WORLD SCALE NExBTL RENEWABLE DIESEL PROGRAM AND TESTING emission testing Valves shall be tested and approved according to EN ISO 15848-1 applying the following minimum classification criteria: class (helium or methane as test gas): A for bellow seal Valves B for non-bellows seal Valves in H2-recycling gas service in pressure classes 1500 and above C for other Valves /services class CO1 class: (t200 C) for duplex stainless steels, class 600 and above (t400 C) for all other materials33 ISO 15848-1 Emission TestsNeste Oil: project WORLD SCALE NExBTL RENEWABLE DIESEL PROGRAM Tested Valves :Gate, globe and CheckAPI602/ISO15761size to 2 Class 800 and 1500 Covers 150 to 1500 classes34 ISO 15848-1 Emission TestsAgipKCO: project Kashagan Experimental Programme Requirements:ISO15761-1 Class B Endurance C1 (500) Valves : Floating Ball (soft and metal seated) Globe and Needle35 ISO 15848-1 class BHTo t a l : French Downstream (refinery) Requirements:ISO15761-1 Class BH Endurance: Special req.

10 Valves : ISO15761/API602 gate, globe and check36 ISO 15848-1 class BH37 ISO 15848-1 cycles38 OMB Emissions Solutions Standard square section -100ppm maximum helium leakage in new condition. Garlock EVSP - 100ppm helium after 100 and 3 thermal cycles. Armaseal 312 -70ppm @ high temp/high pressure with 100 cycling procedure Bellows sealed - Zero leak for bellows cycle life and full temperature brief note on Body GASKET seal API602 ISO15671 identify the minimum requirement for gasket design as.