Generator Weekly Inspection Checklist - ASHE

Date Completed _____Completed by _____Component to Inspect/TestActionCommentsFuel Main supply tank level Day tank level Day tank float switch Supply or transfer pump operation Solenoid valve operation Water in fuel system Flexible fuel hoses and connectorsLubrication System Oil level Lube oil heaterCooling System Level Adequate cooling water to the heat exchanger Adequate fresh air through the radiator Water pump(s) Condition of flexible hoses and connection Jacket water heaterExhaust System Leakage Drain condensate trapsBattery System Electrolyte levelsElectrical System General inspectionPrime Mover and Generator General inspectionGeneral condition of EPSS, any unusual conditionService room or housing housekeepingAction Codes Inspected, no probl

Date Completed _____ Completed by _____ Component to Inspect/Test Action Comments Fuel Main supply tank level Day tank level

Tags:

  Checklist, Generators, Inspection, Weekly, Generator weekly inspection checklist

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Generator Weekly Inspection Checklist - ASHE

1 Date Completed _____Completed by _____Component to Inspect/TestActionCommentsFuel Main supply tank level Day tank level Day tank float switch Supply or transfer pump operation Solenoid valve operation Water in fuel system Flexible fuel hoses and connectorsLubrication System Oil level Lube oil heaterCooling System Level Adequate cooling water to the heat exchanger Adequate fresh air through the radiator Water pump(s) Condition of flexible hoses and connection Jacket water heaterExhaust System Leakage Drain condensate trapsBattery System Electrolyte levelsElectrical System General inspectionPrime Mover and Generator General inspectionGeneral condition of EPSS, any unusual conditionService room or housing housekeepingAction Codes Inspected, no problems notedC Problem identified and correctedF Problem identified that could not be immediately corrected.

2 Interim measures initiated as Not ApplicableAdapted from 2005 Edition of NFPA 110 Figure A (a), "Suggested Maintenance Schedule for Emergency Power Supply Systems" Generator Weekly Inspection ChecklistGenerator Number _____SAMPLE


Related search queries