Hazards Identification and Risk Assessment in Metro ...
Metro Railway Line Construction Project at Hyderabad . Vishwas H S . Research Scholar . M.tech (Indu. Safety Engg.) Industrial Safety Engg., ... assessment when there is change to the workplace including when work systems, tools, machinery or equipment changes. ... Safety Induction, 2. Follow work method statement, 3. Trained work force . 4 ...
Tags:
Assessment, Identification, Project, Risks, Construction, Line, Workplace, Hyderabad, Induction, Hazards, Metro, Railways, Hazards identification and risk assessment, Metro railway line construction project at hyderabad
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Speed Control of Induction Motor using PWM Technique
www.ijert.orgfor single phase AC induction motor. It has low cost, high efficiency drive capable of supplying a single phase induction motor with PWM modulated sinusoidal voltage. The circuit operation control by an 8051 family microcontroller[4].The device is aimed at substituting commonly used TRIAC phase angle control drives. ...
Phases, Single, Motor, Induction, Single phase, Induction motors, Single phase induction motor
Design and Performance Study of Shell and Tube Heat ...
www.ijert.orgShell & tube type heat exchangers are built of tubes (round or rectangular in general) mounted in shells (cylindrical, rectangular or arbitrary shape). The differences lie mainly in the detailed features of construction and provisions for differential thermal expansion between the tubes and the shell. ...
Optimization of Sand Casting Process Parameter …
www.ijert.orgCasting defects have been selected as the most representative quality characteristics in the ... Maximizing η’ leads to minimization of quality loss due to defects.
Design of High Gain Two stage Op-Amp using …
www.ijert.orgThe Operational Amplifier (Op-Amp) is designed and analyzed by using Cadence ICFB full custom design suite using 90nm technology. The ...
Numerical Study of Knife Edge Effects in Flash Riveted ...
www.ijert.orgabout knife edge is due to stress cycles causing fatigue cracks. In the riveting process of machine countersunk, cracks mainly initiated around the rivet holes in the upper skin. In flush fasteners, the influence of rivet head in conjunction with the skin thickness on the stress distribution is still largely ...
4-Bit Arithmetic And Logic Unit Design Using Structural ...
www.ijert.orgVery high scale integrated circuit Hardware Description Language. 1. Introduction The ALU, or the arithmetic and logic unit, is the section of the processor that is involved with executing operations of an arithmetic or logical nature. ... Design with VHDL” McGraw Hill, 2 nd
Programmable DC Electronic Load for Testing on-Board ...
www.ijert.orgThe Block diagram of programmable DC electronic load is as show in the Fig.1.The input voltage to device is between 6V-10V.Synchronous buck converter regulates the input voltage to constant voltage of 5V.The bias voltage for timer and Op-Amp are derived from the output of buck regulator .IC555 timer generates the required control signal, the ...
Electronic, Load, Programmable, Programmable dc electronic load
Performance Analysis of a Heat Recovery Steam …
www.ijert.orgThe Heat Recovery steam Generator is one of the Critical components is the combined cycle (Gas Turbine cycle and Steam Power cycle) and is the most efficient energy conversation system in recent trends. Its function is to recover the waste heat present in the exhaust Gases of the Gas turbine ...
A Resonant Converter Topology for Bidirectional DC DC ...
www.ijert.orgthe existing bidirectional dc-dc converters fall into the generic circuit structure illustrated in figure 11.Based on the placement of the auxiliary energy storage, the bidirectional dc-dc converter can be categorized into buck and boost type. To realize the double sided
Converter, Bidirectional, Bidirectional dc dc converters, Bidirectional dc, Bidirectional dc dc
Analysis, Design and Simulation of Bidirectional DC- DC ...
www.ijert.orgThe bidirectional dc-dc flyback converters, a very simple structure, but the active switch suffer a high voltage stresses due to the leakage inductance of the transformer.
Related documents
Working at Heights Guideline - Education
education.qld.gov.auRegister (BEMIR) and supported by local induction processes whereby contractors are advised of potential risks. The types of tasks DoE workplaces might consider contracting out include: Any type of construction work at heights. Roof maintenance/servicing at height e.g. leak repair, storm damage, roof-mounted air
Guidelines, Construction, Working, Induction, Height, Working at heights guidelines
CONSTRUCTION SAFETY PLAN - Safety Risk .net
safetyrisk.netA written record of the date of the induction and the name/details of the worker inducted is to be made on the attached Site Specific Induction Form and the categories/content of the Induction is to be recorded on the Site Specific Induction Checklist and kept on-site for reference purposes. c) Contractor’s Workplace, Site Specific and Work ...
Prerequisite and Induction Requirements
www.fmgl.com.auconstruction sites or other areas controlled by Fortescue Metals. ROLES AND ACCOUNTABILITIES Table 1: Key Accountabilities Role Responsibility Area Managers / Supervisors • Ensure all personnel working in their area of authority are inducted as per this procedure Induction Trainers • Ensure that inductions are delivered in full using the
Requirements, Construction, Induction, Prerequisites, Prerequisite and induction requirements
Environmental, Health and Safety (EHS) Plan
www.deckoafrica.com4 Project Risk Assessment Design and Construction Material 6 4.1 Project EHS Risk Assessment 6 5 Site-Wide Elements 6 5.1 Access Control 6 5.2 Security 6 5.3 Induction 6 5.4 Minimum requirements for light vehicles on construction sites 7 5.5 Laydown and Storage area 7 6 Integrated Environmental, Health & Safety Management 8
Risk assessment: A brief guide to controlling risks in the ...
www.hse.gov.ukWhere the nature of your work changes fairly frequently or the workplace changes and develops (eg a construction site), or where your workers move from site to site, your risk assessment may have to concentrate more on a broad range of risks that can be anticipated. Take a look at the selection of example risk assessments on HSE’s website
Work near underground assets – Guide - SafeWork NSW
www.safework.nsw.gov.auon construction sites. It provides practical advice on implementing the requirements of the Occupational Health and Safety Act 2000 (OHS Act) and the Occupational Health and Safety Regulation 2001 (OHS Regulation). At times, construction work may be carried out near underground assets on greenfield construction sites as well as on or near public
Guide, Construction, Asset, Work, Underground, Earn, Work near underground assets guide
COMMERCIAL BUILDER
www.vba.vic.gov.au(Limited to the construction of low-rise work): • Construction of commercial buildings up to 15metres in height, including • Fire compartmentation/fire separation • Firefighting equipment • Access and facilities for people with a disability • Building egress • Damp proofing and waterproofing • Construction below ground to at least ...