Example: confidence

HPS ECO² Chamber Sections - Highway and Pavement ...

HPSECO ChamberSectionsAt HPS we develop and source innovative products from across the UK and Europe to provide cutting edge, cost effective, environmentally friendly solutions for access and drainage Chamber requirements in highways and aim is to enable designers and contractors who build our roads or install or maintain pipework and drainage infrastructure to have fast, effective access to the most advanced and practical access and drainage solutions anywhere in the market. By combining your continuous feedback on the problems and challenges you face with our knowledge and expertise, we ensure our ever expanding portfolio of products always delivers what you are looking linking different manufacturers unique products we can devise individual solutions to every issue you short, you need look no further than HPS for all your roadway access

04–05 HPS – your road-building and drainage partner Hydrant chamber Stop tap chamber Access cover Chamber sections available in depths of 25mm and 75mm

Tags:

  Chamber

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of HPS ECO² Chamber Sections - Highway and Pavement ...

1 HPSECO ChamberSectionsAt HPS we develop and source innovative products from across the UK and Europe to provide cutting edge, cost effective, environmentally friendly solutions for access and drainage Chamber requirements in highways and aim is to enable designers and contractors who build our roads or install or maintain pipework and drainage infrastructure to have fast, effective access to the most advanced and practical access and drainage solutions anywhere in the market. By combining your continuous feedback on the problems and challenges you face with our knowledge and expertise, we ensure our ever expanding portfolio of products always delivers what you are looking linking different manufacturers unique products we can devise individual solutions to every issue you short.

2 You need look no further than HPS for all your roadway access and drainage Chamber your road-building and drainage partner02 03 HPS your road-building and drainage partnerHPS have designed our ECO2 Chamber range of products to be an environmentally friendly, robust system, compatible with existing concrete Chamber Sections used throughout the Water Utility comprehensive range of Hydrant, Service Valve, Metering and Access Chamber Sections and accessories, that offers significant advantages over conventional concrete Sections . Environmentally friendly manufactured from multi-component recycled plastic usually destined for landfill (PVC, PP, HDPE AND LDPE) 100% recyclable Strong, robust construction gives improved whole life cost due to increased life span of product and less wastage due to breakages during transport or installation Health and safety friendly lightweight, easy to handle, no sharp or rough edges, all but one of our Chamber Sections conform to Manual Handling Regulations (heavy lifting equipment not required)

3 Frost proof to 30 C Resistant to acids, alkalis, fats and oils All Chamber Sections are compliant with BS 5834 compatible with conventional concrete Chamber Sections and can be installed with or retrofitted to them as repair Sections if required Chamber Sections meet the requirements laid down by BS EN 124 class D400 regarding loadingHPS your road-building and drainage partnerThe standard Chamber Sections available are detailed in the table below and cover all common access Chamber sizes. Due to the strength, light weight and ease of installation of the ECO2 Chamber Sections our 25mm and 75mm Sections cover all requirements when stacked, making it unnecessary to provide 100mm or 150mm Sections .

4 This gives the contractor the advantage of reduced stocking or ordering requirements whilst retaining the means of fine adjustment to establish the required levels. Standard Chamber SectionsProduct codeChamber Sections mailing listNominal WeightEco x 150mm x x 150mm x x 180mm x x 180mm x x 230mm x x 230mm x x 280mm x x 280mm x x 455mm x x 455mm x x 610mm x x 610mm x 75mm23kgEco x 610mm x x 610mm x 4328 BH430mm x 280mm x 40mm base slab with 230mm offset 4328 BV430mm x 280mm x 40mm base slab with 230mm central can vary slightly as we are using 100% recycled 05 HPS your road-building and drainage partnerHydrant chamberStop

5 Tap chamberAccess coverChamber Sections available in depths of 25mm and 75mmBase slabBase slabChamber Sections available in depths of 25mm and 75mmMetal surface boxValve chamberMeter chamberAccess coverChamber Sections available in depths of 25mm and 75mmBase slabChamber Sections available in depths of 25mm and 75mmAccess coverBase slab580mm580mm580mm580mm430mm40mmHPS Eco2 Base Sections for 430mm x 280mm chambers are available for valve and hydrant installations. Base Sections are manufactured in two piece Sections as base sections25mm75mmHPS your road-building and drainage partnerGuidance on installation of Chamber Sections Adequate space should be left around the Chamber section to allow backfilling with suitable materials (we recommend a minimum of 150mm).

6 The Sections should be installed upon a pre made or in situ concrete base with the ground under the base compacted to a minimum depth of 100mm. Base levels should be checked to ensure clearance for installation of valve and pipework fittings etc. It is recommended that 75mm Sections are used to build up the main height of the Chamber with 25mm Sections used for final adjustment to meet finished levels. The chambers should be capped off in the usual manner using a concrete haunching before installing the frame and Eco Chamber Sections can also be made watertight by using a suitable sealing coverChamber Sections available in depths of 25mm and 75mmBase slabMinimum 150mm gap06 07 HPS your road-building and drainage partnerHPS ECO DisclaimerThe information in this brochure is to the best of our knowledge true and accurate but all instructions, recommendations or suggestions are made without guarantee.

7 Since the conditions of use are beyond our control, we disclaim any liability for loss or damage suffered from the use of these and Pavement Solutions LtdApex WorksLlanbrynmairPowys SY19 7 DUUnited KingdomTelephone +44 (0) 1650 521 806 Email


Related search queries