HYDRAULIC CRAWLER CRANE - Kobelco Cranes
means of switch operation. • The hoist lever interlock helps to ensure safety during preparatory operations by preventing the drums from responding to accidental lever movement. • The boom-drum pawl detection device sounds an alarm if the operator forgets to engage the drum locks. • Tower-angle lock switch: By locking the tower at a set ...
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
HYDRAULIC CRAWLER CRANE - KOBELCO CRANES
www.kobelco-cranes.comTotally enclosed, full vision cab with safety glass, fully adjustable, high backed seat with a head-rest and armrests, and intermittent wiper and window washer (skylight and front
RKE450-3.1 EUR General Dimensions CITY CRANE - …
www.kobelco-cranes.comSPECIFICATIONS ** Over rear/over front/require special equipment * Over rear/over front/require additional equipment Note: This catalog may contain photographs of machines with specifications, attachments and optional equipment not certified for operation in your
HYDRAULIC CRAWLER CRANE - KOBELCO CRANES
www.kobelco-cranes.com1 CONFIGURATION Crane Boom Max. Lifting Capacity: 120 metric ton x 5.0 m Max. Boom Length: 61.0 m Long Boom Max. Lifting Capacity: 24 metric ton x 16.0 m
Hydraulic, Kobelco, Crawler, Crane, Kobelco cranes, Hydraulic crawler
500t クローラクレーン - kobelco-cranes.com
www.kobelco-cranes.comsl6000j 6 ¡定格総荷重とは、水平堅土上における転倒荷重の78%以内で、 フックブロック、玉掛用ワイヤロープ等のつり具の質量を含んだ
Crane Boom Tower Jib - kobelco-cranes.com
www.kobelco-cranes.comKOBELCO's 7120 hydraulic crawler crane features new tech-nologies that raise performance to a new height. Precise, high-elevation crane jobs depend on …
HYDRAULIC CRAWLER CRANE - KOBELCO CRANES
www.kobelco-cranes.comMax. Lifting Capacity: 550 ton x 8.3 m Max. Crane Boom Length: 126 m Max. Luffing Jib Combination: 84 m + 84 m HYDRAULIC CRAWLER CRANE
HYDRAULIC CRAWLER CRANE - KOBELCO CRANES
www.kobelco-cranes.comHYDRAULIC CRAWLER CRANE CKE1350-1F CRANE BOOM Max. Lifting Capacity: 135 tons 4.5 m LUFFING BOOM Max. Lifting Capacity: 80 tons 8.0 m LONG BOOM
cke2500-2 1-6 - KOBELCO CRANES
www.kobelco-cranes.comCKE2500-2 HYDRAULIC CRAWLER CRANE CRANE BOOM Max. Lifting Capacity: 250 tons X 4.6 m LUFFING BOOM Man Lifting Capaaty: 150 tons x 7.0 m LONG BOOM
型式名 7120G t クローラクレーン - コベルコ ...
www.kobelco-cranes.com1 7120G kフック巻上限界 L L' サードドラムはオプションです。 各ロープ速度はドラム1層目での値です。 *印の速度は軽負荷の時の値であり、負荷により速度の変動があります。
Preventive HYDRAULIC CYLINDER Maintenanc e - …
www.kobelco-cranes.comPreventive Maintenance Vol. 1 Preventive Maintenanc e Vol. 1 Preventive Maintenanc e Vol. 1 1 2 3 4 Base Metal Chrome Plating Corrosion in white Base Metal
Related documents
Guide to Safe Slinging and Signalling
docs.healthandsafetyhub.co.uk• Scaffold cranes. The Laing O’Rourke A4 booklet ‘The Safe Operation of Cranes’ (below) contains the arrangements for the overall management of lifting operations. Those arrangements are mandatory for all Laing O’Rourke crane operations and a copy of the booklet is held by the appointed person. The Safe Operation of Cranes
Operations, Safe, Crane, Signalling, The safe operation of cranes, Slinging, Safe slinging and signalling
The Safe Operation of Cranes - Health and Safety Hub
docs.healthandsafetyhub.co.ukTHE SAFE OPERATION OF CRANES INTRODUCTION THE SAFE OPERATION OF CRANES This document is issued with the authority of Laing O’Rourke. It must be adhered to on every site or other place of work in the United Kingdom where the company, its subsidiaries and/or their sub-contractors are using cranes.
This Code of Practice is prepared by the
www.labour.gov.hkCode of Practice for Safe Use of Tower Cranes 2 1. Scope 1.1 1.2 1.3 This Code provides guidance on the safe use and operation of tower cranes to ensure the safety of personnel working at or nearby those cranes. This Code covers management and planning of the lifting operation of tower
‘Struck-By’ Hazards
www.osha.govheavy equipment and vehicles, likes trucks and cranes; ... Train all workers on safe operation of tools, and inspect all tools before use. 12. Train workers on safe operation of power tools, such as saws, drills, and grinders. Inspect all tools before use, and wear protective gear. Guard rotating and moving parts – all guards
Operations, Safe, Hazards, Crane, Struck, Safe operation, Struck by hazards
EM385-1-1 Section 16 TOCFINAL
www.usace.army.mil(LHE) to include cranes, derricks, hoists and power-operated equipment that can be used to raise, lower and/or horizontally move a suspended load. ... necessary for the safe operation of the equipment and attachments according to: a. Procedures for the operational controls that must be developed by a Qualified Person (QP).
API Standards for Safe Offshore Operations
www.api.orgDesign, Installation, Repair and Operation of Subsurface Safety Valve Systems Analysis, Design, Installation, and Testing of Basic Surface Safety Systems for Offshore Production Platforms RP 2 RP 2MET/ISO 19901-1:2006 RP 2MOP/ISO 19901-6:2009 RP 2N/ISO 19906:2010 STD 2RD RP 2SIM RP 2T BULL 2TD RP 2X RP 95J SPEC 14A RP 14B RP 14C Drill-Through ...
ANSI B20.1: Safety Code for Conveyors, Cableways, and ...
law.resource.orgThis code is intended as a guide for the safe construction, elements of design, installation. operation and maintenance of conveyors and cOn\'e~'in~ machinery, such as power conveyors, gravity conveyors, pneumatic tubes, cablewa}'s, etc., but not including underground …
The Guide to Cal/OSHA
www.dir.ca.gov• Issuing permits for operation of elevators, amusement rides, and aerial passenger tramways. • Inspecting mines, tanks, and boilers. Also, current legislation affecting the Cal/OSHA program includes unique requirements concerning cranes, construction permits,
A Brief Introduction to Important Vessel Mooring Techniques
www.marineinsight.comoperation lies with master of the ship (In case pilot is taking the lead, he will be responsible for the coordination) and not the shore/port mooring party. The port authority also plays an important role to arrange the berth and equipment for ship to get alongside which also requires moving of cranes away from the area until the
Preventing accidents during lifting operations
www.hse.gov.ukd) The lifting operation should be appropriately supervised 2) Ensure that the lifting operations are properly co-ordinated, so all trades working on site know about the operation, and not put to risk. 1) Before starting work, make sure you have been properly briefed 2) Take the time to check the lifting plan against what you actually see on site