Example: stock market

Incident Response Planning & Management - RSSB

Railway Industry Standard RIS-3118-TOM Issue One Date December 2016 Incident Response Planning & Management Synopsis This document identifies interface requirements for enabling a consistent, comprehensive and structured process for rail Incident Response Planning and Management . Copyright in the Railway Group documents is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group document (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. RSSB members are granted copyright license in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited.

Railway Industry Standard RIS-3118-TOM Issue One Date December 2016 Incident Response Planning & Management Page 4 of 28 RSSB Part 1 Introduction

Tags:

  Management, Planning, Response, Incident, Railways, Incident response planning amp management

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Incident Response Planning & Management - RSSB

1 Railway Industry Standard RIS-3118-TOM Issue One Date December 2016 Incident Response Planning & Management Synopsis This document identifies interface requirements for enabling a consistent, comprehensive and structured process for rail Incident Response Planning and Management . Copyright in the Railway Group documents is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group document (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. RSSB members are granted copyright license in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited.

2 In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group documents, Rail Safety and Standards Board Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from Railway Group documents may be reproduced. Published by: RSSB Copyright 2016 Rail Safety and Standards Board Limited Uncontrolled When Printed Document comes into force and supersedes GORT3118 Iss 1 with effect from 03/12/2016 Superseded by RIS-3118-TOM Iss 2 with effect from 07/12/2019 Railway Industry Standard RIS-3118-TOM Issue One Date December 2016 Incident Response Planning & Management Page 2 of 27 RSSB Issue record Issue Date Comments One December 2016 Replaces Railway Group Standard GORT3118 issue one as it could not be retained as a National Safety Rule and is therefore reclassified as a Rail Industry Standard.

3 Superseded or replaced documents The following Railway Group document is replaced, in whole as indicated: Superseded documents Sections replaced Date when sections are replaced GORT3118, issue one, Incident Response Planning & Management All 04 March 2017 GORT3118 ceases to be in force and is withdrawn as of 04 March 2017. Supply The authoritative version of this document is available at Enquiries on this document can be forwarded to Uncontrolled When Printed Document comes into force and supersedes GORT3118 Iss 1 with effect from 03/12/2016 Superseded by RIS-3118-TOM Iss 2 with effect from 07/12/2019 Incident Response Planning & Management Rail Industry Standard RIS-3118-TOM Issue One Date December 2016 RSSB Page 3 of 28 Contents Section Description Page Part 1 Introduction 4 Purpose of this document 4 Application of this document 4 Health and safety responsibilities 5 Approval and authorisation of this document 5 Annexes Annex A Content of GORT3118, issue one, Incident Response Planning & Management .

4 6 Definitions 27 References 28 Uncontrolled When Printed Document comes into force and supersedes GORT3118 Iss 1 with effect from 03/12/2016 Superseded by RIS-3118-TOM Iss 2 with effect from 07/12/2019 Railway Industry Standard RIS-3118-TOM Issue One Date December 2016 Incident Response Planning & Management Page 4 of 28 RSSB Part 1 Introduction Purpose of this document GORT3118 Incident Response Planning & Management , issue one, duplicated common European requirements for Incident Response Planning and Management , in particular those set out in: a) Sections , and of Commission Regulation (EU) 2015/995 of 8 June 2015 amending Decision 2012/757/EU concerning the technical specification for interoperability relating to the operation and traffic Management subsystem of the rail system in the European Union (OPE TSI).

5 B) Annex III(2)(i) to the Railway Safety Directive 2004/49/EC, on basic elements of the safety Management system. c) Annex II(R) to the Common Safety Methods for assessing conformity (CSM CA), on criteria for assessing conformity with the requirements for obtaining safety authorisations / safety certificates. It was therefore formally redundant as a national safety rule, and therefore also as a Railway Group Standard. As a consequence, it has been withdrawn. However, the content of GORT3118 provided a basis for the provision of plans for action, alerts and information in the case of an emergency which are to be agreed with any public body, including the emergency services, that may be involved in such an emergency required by the Schedule 1 to the railways and Other Guided Transport Systems (Safety) Regulations 2006 (as amended), which substantially reproduces the provisions of Annex III to the Railway Safety Directive 2004/49/EC.

6 GORT3118 has therefore been replaced by this Rail Industry Standard (RIS-3118-TOM for Incident Response Planning & Management ), which reproduces the content of GORT3118 in its entirety as Annex A of this document. GORT3118 was supported by GOGN3518 Guidance on Incident Response Planning & Management . GOGN3518 remains current and has been retained unchanged to support RIS-3118-TOM. Application of this document A member of RSSB may choose to adopt all or part of this document through internal procedures or contract conditions. Where this is the case the member of RSSB will specify the nature and extent of application. Therefore compliance requirements and dates have not been specified since these will be the subject of internal procedures or contract conditions.

7 The Railway Group Standards Code and the Standards Manual does not currently provide a formal process for deviating from RISs. However, a member of RSSB, having adopted a RIS and wishing to deviate from its requirements, may request a Standards Committee to provide observations and comments on their proposed alternative to the requirement in the RIS. Requests for opinions and comments should be submitted to RSSB by e-mail to When formulating a request, consideration should be given to the advice set out in the Guidance to applicants and members of Standards Committee on deviation applications , available from RSSB s website. Uncontrolled When Printed Document comes into force and supersedes GORT3118 Iss 1 with effect from 03/12/2016 Superseded by RIS-3118-TOM Iss 2 with effect from 07/12/2019 Incident Response Planning & Management Rail Industry Standard RIS-3118-TOM Issue One Date December 2016 RSSB Page 5 of 28 Health and safety responsibilities Users of documents published by RSSB are reminded of the need to consider their own responsibilities to ensure health and safety at work and their own duties under health and safety legislation.

8 RSSB does not warrant that compliance with all or any documents published by RSSB is sufficient in itself to ensure safe systems of work or operation or to satisfy such responsibilities or duties. Approval and authorisation of this document The content of this document was approved by Traffic Operation and Management Standards Committee on 17 November 2015. This document was authorised by RSSB on 30 September 2016. Uncontrolled When Printed Document comes into force and supersedes GORT3118 Iss 1 with effect from 03/12/2016 Superseded by RIS-3118-TOM Iss 2 with effect from 07/12/2019 Railway Industry Standard RIS-3118-TOM Issue One Date December 2016 Incident Response Planning & Management Page 6 of 28 RSSB Annex A Content of GORT3118, issue one, Incident Response Planning & Management Uncontrolled When Printed Document comes into force and supersedes GORT3118 Iss 1 with effect from 03/12/2016 Superseded by RIS-3118-TOM Iss 2 with effect from 07/12/2019 Railway Group Standard GO/RT3118 Issue One Date October 2008 Incident Response Planning & Management Synopsis This standard identifies interface requirements for enabling a consistent.

9 Comprehensive and structured process for rail Incident Response Planning and Management . Content approved by: TOM Standards Committee on 19 August 2008. Authorised by RSSB on 19 August 2008. Copyright in the Railway Group Standards is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group Standard (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. RSSB Members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group Standards, Rail Safety and Standards Board Limited accepts no responsibility for, and excludes all liability in connection with, the use of such extracts, or any claims arising therefrom.

10 This disclaimer applies to all forms of media in which extracts from Railway Group Standards may be reproduced. Published by: Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2008 Rail Safety and Standards Board Limited Uncontrolled When Printed Document comes into force and supersedes GORT3118 Iss 1 with effect from 03/12/2016 Superseded by RIS-3118-TOM Iss 2 with effect from 07/12/2019 Incident Response Planning & Management Railway Group Standard GO/RT3118 Issue One Date October 2008 RAIL SAFETY AND STANDARDS BOARD Page 2 of 20 Issue record Issue Date Comments One 04 October 2008 Original document Superseded documents The following Railway Group documents are superseded, either in whole or in part as indicated.


Related search queries