Example: air traffic controller

Indonesia Integrated Steel Mill - poscoenc.com

Steel POSCOCoke Plant ProjectJul. POSCO1,321,000 T/YThe Installation of new coke oven plant at POSCO Steel works in Cilegon, Indonesia ,comprising 2 batteries with 42 coke oven per each battery. - Coke Oven Battery (84 Ovens) - Gas Treatment Plant : : 22,000N /Hr 5sets(0ne stand-by) COG Blower: 100,000 N /Hr 2sets(0ne stand-by)- Moving machine : Charging car(2EA), Coke transfer car(2EA) Pusher car(2EA), Locomotive(2EA)- Coal preparation & Coke trasportation : Coal capacity(450T/Hr) : Coke capacity(350T/Hr, 300T/Hr) POSCOB last furnace ProjectJul.

STEEL PLANT Iron making > Finex Start Completion Location Client Capacity FINEX, Pohang Steelworks Jan. 2004 Apr. 2007 POSCO 1,500,000 T/Y ( 4,110 T/D )

Tags:

  Mills, Steel, Integrated, Indonesia, Indonesia integrated steel mill

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Indonesia Integrated Steel Mill - poscoenc.com

1 Steel POSCOCoke Plant ProjectJul. POSCO1,321,000 T/YThe Installation of new coke oven plant at POSCO Steel works in Cilegon, Indonesia ,comprising 2 batteries with 42 coke oven per each battery. - Coke Oven Battery (84 Ovens) - Gas Treatment Plant : : 22,000N /Hr 5sets(0ne stand-by) COG Blower: 100,000 N /Hr 2sets(0ne stand-by)- Moving machine : Charging car(2EA), Coke transfer car(2EA) Pusher car(2EA), Locomotive(2EA)- Coal preparation & Coke trasportation : Coal capacity(450T/Hr) : Coke capacity(350T/Hr, 300T/Hr) POSCOB last furnace ProjectJul.

2 POSCO3,000,000 T/Y(8,650 T/D)The capacity of plant is 3 million tons of hot metal in annual. This project has been performedto increase the Steel making production capacity of POSCO Company inCilegon, Indonesia . - Inner Volume : 3,800 - Method of Furnace Proper Cooling : Cooling Plate + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control POSCO SinterPlant ProjectJul. POSCO12,870 T/DThe capacity of plant is million tons of Sintered Ore in annual. This project was ordered POSCO and POSCO E&C made consortium with ( Engineering)which is the POSCO E&C's first project in Indonesia . - Effective Suction Area : 450 - Material handling, Sinter Machine & Cooler, Screening & Crushing, Utility & Auxiliary facilities - Application of Automatic System & EIC Integrated Control System - Environmentally friend equipment and energy saving POSCOS teel making ProjectJul.

3 2011 Dec. 2013 Cilegon POSCO3,156,000 T-S/year(Converter :300 T/Heat)Capacity: 3,156,000 T-S/year (Converter : 300 T/Heat)Summary: A project to newly construct KR(2sets), converter(1set), LF(1set), RH(1set) facilitiesfor the purpose of Integrated Steel mill at Cilegon in Indonesia . Main facility 1. KR Facility (De-S) : 300 T/ch x 2 set - KR Facility, Transfer car, etc. 2. Converter : 300 T/ch x 1 set - Converter, Gas cooler, Waste gas treatment facility, O2 Lance Facility 3. LF facility : 300 T/ch x 1 set - Heating Facilities, Bubbling Facilities, Alloy Facilities 4. RH facility: 300 T/ch x 1 set (Duplex Type) - Ladle Lifting System, Vacuum Vessel, TOB(Multi-Fuction Burner), Vacuum Pump 3.

4 Auxiliary facility - Ladle, Relining facility, Compressor, Power Receiving&Sending station, Transformer, POSCO Continouscaster facility ProjectJul. 2011 Dec. 2013 Cilegon POSCO8,750 T/DA project for continous caster plant of Integrated Steel mill at Cilegon which productioncapactiy is 3,000,000 tons/year. - Thickness : 230mm cold - Width : 1100 mm to 2300 mm cold - Speed : max. m/min (LC) POSCOP late mill Plant ProjectJul. 2011 Dec. 2013 Cilegon POSCO1,500,000T/YConsortium with Mitsubishi Corporation, and Project for Plate Mill Plant in Indonesia POSCO Steel Integrated Steel MillSTEEL PLANTB razil CSP Steel PlantStartCompletionLocationClientCapaci tyCSPRaw material handing ProjectJan.

5 2012 May. 2015 BRAZIL CEARASTATE Pecem AREACSP(CompanhiaSiderurica doPecem)3,000,000 T/YCSP RMHF (Companhia Siderurica do Pecem) PJT is to provide coke, iron ore and sub-materials into newly installed CSP Steelworks. It includes material yard, stacker/reclaimer, beltconveyor, environmental facilties, EIC equipments and etc. - Yard: 800M * 6 Sets - Belt conveyor: 51 Lines - Stacker & Reclaimer: 9 Sets - & Vibrating feeder: 1 Lot - Dust collector : 1 LotCSPS inter Plant ProjectSep. 2012 Jul. 2015In Pecem in theState ofCeara,BrazilCSP12,920T/DThe capacity of plant is million tons of Sintered Ore in annual. This project was ordered byCSP and POSCO E&C made contract solely which is the POSCO E&C's first project in Brazil - Effective Suction Area : 400 - Material handling, Sinter Machine & Cooler, Screening & Crushing, Utility & Auxiliary facilities - Application of Automatic System & EIC Integrated Control System - Environmentally friend equipment and energy saving equipmentCSPCoke Plant ProjectJan.

6 2012 Aug. 2015In Pecem in theState of Ceara,BrazilCSP1,319,475 T/YThe Installation of new coke oven plant in Pecem in the state of Ceara, Brazil, comprising 2 batteries with 50coke oven per each Coke Oven Battery (100 Ovens)- Gas Treatment Plant : : 44,000N /Hr 3sets(0ne stand-by) COG Blower: 100,000 N /Hr 2sets(0ne stand-by)- Moving machine : Charging car(2EA), Coke transfer car(2EA) Pusher car(2EA), Locomotive(2EA)- Coal preparation & Coke trasportation : Coal capacity(450T/Hr) : Coke capacity(350T/Hr, 300T/Hr)CSPB last furnace ProjectJul.

7 2012 Aug. 2015, BrazileCSP3,000,000 T/Y(8,650 T/D)The capacity of plant is 3 million tons of hot metal in annual. This project has been performedto increase the Steel making production capacity of CSP in Brazile. - Inner Volume : 3,800 - Method of Furnace Proper Cooling : Cooling Plate + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control SystemCSPS teel making ProjectSep. 2012 Aug. 2015 PecemCeara, millionT/YA project to newly construct KR(2sets), Converter(2sets), Ladle furnace(1set) and RH(1set)facilities in CSP Steel Plant to meet the productivity of annual capacity of million tons Slab. Main facility - KR 2sets, Converter 2sets, Ladle furnace 1set, Duplex RH 1set - Heat Size: 300ton/heat - Dry type Electrostatic Precipitator - Hot metal charing crane(450/80ton) etc.

8 CSP2-Strand Slab Caster ProjectJul. 2012 Aug. 2015 Brazil millionT/YA project to construct a new Slab caster for high quality and productivity of plates and hotcoils. - Caster : 1 Machine x 2 Strand - Slab Specification . Thickness x Width : 220/250/300 mmx (1,100~2,300mm) . Length : 4,800mm~12,500mm . Weight : - Casting Speed : PLANTIron making > Blast FurnaceStartCompletionLocationClientCapa cityIndia IISCO ProjectOct. 2007 Mar. 2010 IISCO atBurnpur,West Bengal,IndiaIISCOS teel Company(India)8,000 T/DThe capacity of plant is million tons of hot metal in annual. This project is odered byIISCO Steel Co. (SAIL Co.) and won by POSCO E&C consortium with NCC(NafarjunaConstruction Company) which is the POSCO E&C's first project in India.

9 - Inner Volume : 4,150 - Construction Periods : 30 Months - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control SystemIran TAVAZON ProjectJun. 2002 Dec. 2008 ESCo. atShahrekord,Esfahan, IranEsfahanSteel Company(Iran)3,836 T/DThe capacity of plant is million tons of hot metal in annual. This project has beenperformed to increase the Steel making production capacity of Esfahan Steel Company in Iranfrom million tons to million tons. And this is the POSCO E&C's first overseas projectthrough competitive bid. - Inner Volume : 2,020 - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control SystemThe 2nd Relining Project of FurnaceDec.

10 2004 May 2006 POSCO10,100 T/DThe capacity of plant is million tons of hot metal in annual. And to shorten the shut downperiods, POSCO E&C applied the Method of Construction, "Large Block Ring ConstructionMethod", as 3 Layers 3 Blocks of furnace proper shell. The shut down periods is 58 days. - Inner Volume : 3,795 4,350 - Shut Down Periods : 58 Days - Method of Construction : Large Block Ring Method - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - Application of Bischoff Scrubber (Gas Cleaning Plant) - Application of Automatic System for Casthouse & EIC Intergrated Control SystemThe 2nd Relining Project of FurnaceApr.


Related search queries