Installation bollards INDEX ROOTED BOLLARD. FIXING. bollards Rooted fixing - general bollards Flanged fixing - general bollards Cover plate Installation bollards Root box 191/192 Installation bollards Removable 190 socket Installation bollards Anti ram-raid Installation bollards 197 Installation bollards should always be securely fixed in 3:2:1 concrete bollards 194 folding Installation mix, sulphate resisting if bollards Removable bollard with lift-out bar necessary. Certain sites, (dependant upon location). bollards 193 Kerb bollard Installation may require a quick setting bollards Logo & crest positioning concrete to be used.

11.4 FLANGED BOLLARD FIXING These two options indicate typical fixing arrangements although others may be accommodated. The suggestions are for non-

Tags:

  Installation, Bollards

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Installation - CIS Street Furniture

1 Installation bollards INDEX ROOTED BOLLARD. FIXING. bollards Rooted fixing - general bollards Flanged fixing - general bollards Cover plate Installation bollards Root box 191/192 Installation bollards Removable 190 socket Installation bollards Anti ram-raid Installation bollards 197 Installation bollards should always be securely fixed in 3:2:1 concrete bollards 194 folding Installation mix, sulphate resisting if bollards Removable bollard with lift-out bar necessary. Certain sites, (dependant upon location). bollards 193 Kerb bollard Installation may require a quick setting bollards Logo & crest positioning concrete to be used.

2 bollards Pivoting bollard gates Installation Extended roots are recommended for bollards Railings Rooted & flanged fixing where paving and bedding Railings Rail fixing material take up more than a third of the standard 300mm Railings Gradient fixing bollard root length. Railings Abutment bracket fixing Ensure that concrete fill is allowed to fall within the root Litter Bins Litter bin fixing window (where provided), this Litter bins Litter bin fixing alternative will anchor the bollard more securely. Seating Seat foundations Paving Max 100mm No product must never Seating Anti-theft fixing ever be rolled or dropped Lighting Illuminated bollard lamp changes during site Installation .

3 We recommend that individual Signage Finger sign fixing packaging material is left Root length in place as long as possible Signage Noticeboard post Installation x during the Installation process Signage Finger post Installation Concrete to minimise the potential Tree Protection Tree frame fixing Sub Soil foundation damage. Tree Protection Tree guard to frame fixing Great care is needed when installing finished painted Tree Protection Anti-vandal frame fixing Bollard diameter x 2 products. Given the weight of most designs, paint damage Tree Protection Retro-fitting tree guards most often occurs during Tree Protection Root Director 640 Installation Installation .

4 Touch up paint is available (at a cost), call Tree Protection ReRoot Installation our Sales office for further Contact details information. bollards bollards FLANGED BOLLARD 195 & 196. FIXING COVER PLATE. Installation . All-thread bar cast in-situ or resin grouted/anchored in place. Type 195 Type 196. Locknut to underside of flange These two options indicate typical fixing arrangements Paving although others may be accommodated. The suggestions are for non- specific applications only, 3:2:1 mix concrete as individual service & site - sulphate resisting 200.

5 If necessary conditions may necessitate other methods of fixing. Through bolt or expanding bolt fixing Paving or Stainless Steel Loose fit cover plate prior to Installation of bollard if superstructure does not allow post- Installation fitment. Paving Sub Soil When the bollard is in place and all abutting surfacing Concrete works are complete, adhere foundation the cover plate to the surfacing and bollard using 3:2:1 mix concrete - sulphate resisting water-resistant adhesive 200 if necessary (generally not supplied). bollards bollards ROOT BOX 191/192 BAYONET.

6 Installation Installation . We recommend a 3:2:1. concrete mix, sulphate This type of socket has a resisting if necessary, separate cover plate for 400x400x600mm deep for use should the bollard be light - medium duty traffic removed for any length of over-run, assuming 'good' time. The cover plate should soil characteristics. For heavy The lid is retained by a lockable lug fixed be stored independently from duty service the foundation to the bollard side. When the bollard is the bollard. design may have to be removed the lid drops down virtually flush with the surrounding floor level.

7 It can then Should the bollard be altered depending on the soil be locked in place using the integral 8mm removed frequently for any characteristics. Tri-key lock to prevent tampering by unauthorised persons. length of time, it may be In the cases of heavy to prevent paintwork damage, CIS prudent to purchase a second duty usage CIS should be can supply an additional 191 or 192 base unit, in order that the root box for temporary storage whilst informed at the point of order bollard can be securely stored. the bollard is in the removed position.

8 Placement so that necessary Provision should be made provisions may be made. by the use of a plastic tube 325 sqr. Extended root bollards (not supplied) through the should have at least 200mm Paving Max concrete foundation to a of concrete below the base. 100mm drainage sump material below The data is suggested only for concrete level. This should non-specific applications as provide adequate irrigation of individual requirements and rainwater. site conditions may dictate otherwise. Please refer to Foundation for rooted version 400 x 400 x 400mm cube our Technical Department for advice in debatable cases.

9 Concrete Sub Soil foundation Unless otherwise requested the bollard will not be in aluminium, although wherever possible we would recommend its use due to the ease of lifting. In any event we Drainage tube (not supplied) fixed in recommend that you select Drainage sump place to allow free flow of water from material root box to drainage material the optional 32mm diameter lifting out hole at 640mm above FFL and its respective galvanised steel lifting bar. Foundation for bolt down version 400 x 400 x 200mm cube bollards bollards ANTI-RAM RAID FOLDING 194.

10 Installation Installation . Selected CIS bollard Weak mix concrete cap, coloured to suit surrounding surfacing. Side Elevation / Section Care is required when Paving Ensure foundation concrete does not designing suitable Sand bed impede access for later removal of pivot bolt (superstructure replacement). foundations for this type of Steel sleeve At least 200mm of free axial travel is required on the bolt (not nut). bollard. We would always For light to medium duty a paving recommend consulting a local 500. sand 3:2:1 concrete mix should be Pea gravel 50mm qualified Structural Engineer.