Jointing Methods for Premier Rainwater Pipes

InstallationPremier50 Email: : 01422 330607 Fax: 01422 320349 Jointing Methods for Premier Rainwater PipesVertical Rainwater Pipes would not normally be sealed. Only seal jointsbetween gutter outlet and Rainwater pipe or offset plus any joints in ahorizontal position such as a 90 branch arm or is recommended that three small wedges made from timber or sheet leadoff-cuts are used to centralise the pipe joints and prevent any wind Methods for Premier Rainwater PipesThe traditional fixing for eared cast iron Rainwater Pipes is byusing large headed pipe nails which we have available in 75mm and 100mm lengths. These are secured in wooden plugs fitted in the brickwork/masonry background. Alternatively non corrosive coach screws or other proprietaryfixings may be fixing on an uneven or unstable surface the recommended method is to secure fixings by means of epoxyresin in pre-drilled of uneared Pipes can be by holdfast, build in holderbat,earband or screw to wall bracket.

installation Premier 50 Email: info@hargreavesfoundry.co.uk www.hargreavesfoundry.co.uk Telephone: 01422 330607 Fax: 01422 320349 Jointing Methods for Premier Rainwater Pipes

Tags:

  Methods, Premier, Pipe, Rainwater, Jointings, Jointing methods for premier rainwater pipes

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Jointing Methods for Premier Rainwater Pipes

1 InstallationPremier50 Email: : 01422 330607 Fax: 01422 320349 Jointing Methods for Premier Rainwater PipesVertical Rainwater Pipes would not normally be sealed. Only seal jointsbetween gutter outlet and Rainwater pipe or offset plus any joints in ahorizontal position such as a 90 branch arm or is recommended that three small wedges made from timber or sheet leadoff-cuts are used to centralise the pipe joints and prevent any wind Methods for Premier Rainwater PipesThe traditional fixing for eared cast iron Rainwater Pipes is byusing large headed pipe nails which we have available in 75mm and 100mm lengths. These are secured in wooden plugs fitted in the brickwork/masonry background. Alternatively non corrosive coach screws or other proprietaryfixings may be fixing on an uneven or unstable surface the recommended method is to secure fixings by means of epoxyresin in pre-drilled of uneared Pipes can be by holdfast, build in holderbat,earband or screw to wall bracket.

2 These fixings are all availablefrom (AWK) 16/12/09 9:38 am Page 50installationPremier51 Email: : 01422 330607 Fax: 01422 320349 Jointing Methods for Premier Gutters The most popular way of Jointing cast iron gutters is byusing a low modulus silicone sealant or specialistrubberised bitumen gutter sealant should be spread evenly within the guttersocket applying additional sealant around the Jointing holebefore placing the gutter spigot into the socket andcompressing both parts using M6 x 25mm corrosionresistant mushroom head bolts, ensuring the bolt head ison the inside of the washer and nut should be lightly tightened from theunderside of the gutter to allow excess sealant to beremoved. Do not over tighten as this could result in : If gutters have been cut, remove any loose filingsimmediately to ensure no discolouration/ rust marks onthe paint surface.

3 Also check that cut ends, bolts, nuts andany slight installation damage is made good with theappropriate primer and Method for Premier Gutters Before commencing the installation, inspect all fascia boards to ensure theyare in good condition and will adequately support cast iron Determine the direction for fitting the gutters beginning with socketed end of the gutter Notts OG gutters fit left to right and G46 gutters fit right to left- see Page 11. 2. Position the first bracket 150mm from the end of the run3. Fix subsequent brackets at 900mm maximum centres using a string line foralignment of brackets and ensuring a slight fall towards outlet Gutters may be cut with a powered disc cutter or tipped When cutting gutters, ensure there are no loose filings left on the surface as these will cause discolouration of the paint All cut ends, bolt heads and damaged paint areas should be retouched it is common practice to fit gutters in fascia brackets, some gutterprofiles may be fixed direct to the fascia if required.

4 These include OG andmoulded gutters which have three pre-drilled holes per (6') lengthalong the top back building designs incorporate no fascia board, other types of bracketwill be required, the most popular being side fixing rafter, top fixing rafterand rise and fall brackets with build in spikes. These are all readily availablein galvanised/zinc plated steel and other designs are obtainable to suit yourspecific (AWK) 16/12/09 9:38 am Page 51installationPremier52 Email: : 01422 330607 Fax: 01422 320349 Jointing with Gutter Jointing Kit HR0006 Suitable for use on Plain Half Round and Beaded Half Roundgutter profiles, this kit is an efficient alternative to traditionaljointing Methods . The kit contains 10 EPDM rubber seals plusM6 x 25mm bolts, nuts and washers, suitable for 100mm,115mm, 125mm, and 150mm gutter 1.

5 Take the EPDM gasket and push the bolt from the inside of thegutter spigot and then through the 2. Line up the gutter and gasket with the socket of the nextgutter/fitting and push the bolt through ready to accept thewasher and 3. Check the gasket is square and even between the two guttersand then tighten the nut and washer. Be careful not to overtighten as this may affect the joint or damage the 4. Finally use a craft knife to trim off any excess gasket : When carrying out Jointing or installation work oncast iron gutters, always check for any slight damageincluding paint chips and cut ends and if necessary use theappropriate touch up paint to ensure a complete (AWK) 16/12/09 9:38 am Page 52installationPremier53 Email: : 01422 330607 Fax: 01422 320349 Cold Jointing Method for Premier Soil Pipes As an alternative method of Jointing , without the use of a naked flame as inthe traditional lead caulking method, we can provide the following coldjointing products: Caulking Cord CT1 black sealantStep 1.

6 Centrally align the pipe spigot within the socket and wet the cord. Step 2. Caulk this into the socket up to 30mm from the top. This will centralise thepipes and provide a backing for the top 30mm of the 3. Fill the top 30mm with CT1 black sealant, apply using a skeleton gun. Step 4. When filled, smooth off level with the top of the socket, to provide a sealedjoint and neat appearance. No further painting will be required if the pipesare black. CT1 can be over painted if the Pipes are a different : Each joint of a 4 pipe will require approximately 4 metres ofcaulking cord and a quarter of a tube of CT1. Estimate usage on smaller orlarger diameters pro-rata to pipe diameter. Fixing Methods for Premier Soil PipesA typical fixing for eared soil Pipes is 100mm large headpipe nail, coach screws or other propriety of uneared soil pipe is by a drive in holderbats or earbands may be used for a moredecorative effect.

7 All fixings are available from (AWK) 16/12/09 9:38 am Page 53paintingPremier54 Email: : 01422 330607 Fax: 01422 320349 Painting Methods for Premier RainwaterIt is important when painting cast iron to ensure that allsurfaces are completely Rainwater products are supplied in a grey metalprimer with rust fixing on site, the products should be inspected fordamage to the finish and, where necessary, wire brushed andspot primed with an appropriate metal primer. This should befollowed by two undercoats and one top coat (or oneundercoat and two top coats) of a good quality exterior coastal areas please consult your local stockist or paintmanufacturer for their recommendations. After installation ensure that any damage to the coating, Jointing nuts, bolts and fixing screws is made good with theappropriate paint.

8 Note: We strongly recommend all products are paintedprior to installation to ensure adequate coating on allsurfaces. This will reduce long term Methods for Premier Extra RainwaterOur in house paint coating is formulated tohave a life expectancy of 10 years whensubject to normal weather conditions andrectification of any impact damage or surfacescuffing during and after pollution and/or the presence ofdissolved salts in the Rainwater put greaterdemands on the paint coatings and canadversely affect the life installation and assembly of theproduct and handling, scuffing or impactdamage to the coating must be made good tomaintain the integrity of the finished paintcoating. Likewise, any cutting or drillingoperations must be protected with paintimmediately to prevent the onset of therusting process.

9 This touch up reworking alsoapplies to any bolts, nuts and screws usedduring Methods for Premier Soil It is important when painting cast iron to ensurethat all surfaces are completely soil Pipes are coated with a blackbitumous based finish to conform to over painting, please refer to your paintspecialist or manufacturer for a suitable (AWK) 16/12/09 9:38 am Page 54paintingPremier55 Email: : 01422 330607 Fax: 01422 320349 Paint Touch Up Procedure for Premier Extra RainwaterThis process will ensure the protection of the cast iron product againstrusting from the reworked areas subject to regular annual checks androutine maintenance of the exterior PreparationSurface Scuffing or Impact Damage. The affected area should be rubbedwith emery or sand paper to remove any loose paint or debris and provide akey for touch up.

10 Any rusting from exposed metal should be fully sandedback to bare metal. This process should be carried out as soon as possibleafter preparation of the and Drilling. Remove any burrs or sharp edges and ensure that anyoil contamination, loose dust or metal debris is fully removed on completionof these operations. Paint touch up should be carried out as soon as possibleafter preparation of the the bare metal faces have been left untreated then any rusting of the exposedmetal should be fully sanded back to bare metal before paint touch ProcessThis process should be carried out in dry conditions with thesurface to be treated clean and Hargreaves Foundry semi gloss touch up paint in theappropriate colour and apply an initial coat of paint to thebare metal surface ensuring all exposed metal is brushing out of the paint should be avoided sincethis will reduce paint layer thickness and necessitate three orfour layers of touch up paint to be the initial or previous coat is touch dry apply thesecond or additional coats of paint to the reworked