Student Manual Lesson 3 Earthwork Records System Version 1/15 3 1 Lesson 33-1 Earthwork Record SystemLesson 33-1 Earthwork Record SystemStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 2 Describe the purpose, use and basic coding ofthe Earthwork Records System Identify reference lines Distance calculations involving StationEquations Describe modifying plots in the field3-2 Learning OutcomesStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 3 Ensures specifications are met Is utilized to record test results Used as the basis for accepting completed roadwayearthwork Is the only record One Earthwork Record System for QC One Earthwork Record System for Verification3-3 Purpose and UseDensity testing, on FDOT construction projects, is to ensure specifications are met regarding the compaction of soils.

Student Manual Lesson 3 – Earthwork Records System Version 1.0‐ 1/15 3‐2 • Describe the purpose, use and basic coding of the Earthwork Records System • Identify reference lines • Distance calculations involving Station Equations

Tags:

  Coding, Lesson, Lesson 3

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Lesson 3 - CTQP Home Page

1 Student Manual Lesson 3 Earthwork Records System Version 1/15 3 1 Lesson 33-1 Earthwork Record SystemLesson 33-1 Earthwork Record SystemStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 2 Describe the purpose, use and basic coding ofthe Earthwork Records System Identify reference lines Distance calculations involving StationEquations Describe modifying plots in the field3-2 Learning OutcomesStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 3 Ensures specifications are met Is utilized to record test results Used as the basis for accepting completed roadwayearthwork Is the only record One Earthwork Record System for QC One Earthwork Record System for Verification3-3 Purpose and UseDensity testing, on FDOT construction projects, is to ensure specifications are met regarding the compaction of soils.

2 The Earthwork Record System serves as the system that construction inspectors utilize to record test results. When properly maintained for each project and attested to by responsible personnel, it is used by the Department as the basis for accepting the completed roadway earthwork. Student Manual Lesson 3 Earthwork Records System Version 1/15 3 4 coding of the Density Log Book is the actualtransference of the applicable data from the projectplans into the Density Log Book program, whichresults in the creation of the individual plot of it as inventorying your project. 3-4 coding of the Density Record BookStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 5 Code for all the Structures Code in a length that allows for testing tobe easily identified Typically 500 for Embankment Start where the Project/Work starts End where the Project/Work stops Pages Break at.

3 Equations Bridges where Exceptions begin Use Remarks Effectively3-5 coding of the Density Record BookStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 6 Code the Job One book per Contract number Enter all Pertinent Information Number Pages Check the Elevations Split the Records System for convenience, ifneeded Performed before construction starts3-6 coding of the Density Log BookStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 7 The Earthwork Record Keeping System serves as a basis for _____ ?When should the coding of the Earthwork Record Keeping System be performed?3-7 Learning OutcomesStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 8 Embankment plots in the density log book are to be what length?

4 3-8 Learning OutcomesThere are how many Earthwork Record Systems per Contract?Student Manual Lesson 3 Earthwork Records System Version 1/15 3 9 CutBar GraphsBaseSubgradeShoulder BaseShoulder SubgradeFill Existing ground level Proposed Top of EmbankmentStationing (feet) Elevation (feet)3-9 Terminology- Roadway PlotStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 10 Sump10 Lifts3 Lifts11 LiftsTo t a l24 Lifts3-10 Lift Counts- Pipe PlotStructuresPipeElevation (feet)(6 lifts)Lift Numbering: With or without a SUMP Add the number of lifts to get to the bottom of the pipe, with the number of lifts to cover the pipe, with the number of lifts to cover the tallest remaining structure.

5 For example: At the top of the page it takes___ lifts to build the backfill up from the bottom of the sump to the bottom of the pipe. Then it takes _____ lifts to cover the pipe. Finally, it takes another _____ lifts to get to the top of the tallest remaining structure (S-1). The tallest remaining structure is the structure with the largest number of lifts remaining above the pipe. S-1 has _____ lifts above the pipe and S-2 has _____ lifts, therefore, we use S-1's lifts in determining the number of lifts needed. Student Manual Lesson 3 Earthwork Records System Version 1/15 3 11 Narrow widening strip defined as 5 ft. or less Nuclear Moisture IsAcceptable on approvedLimerock, Cemented Coquina, Shell-RockBase Materials QC Managerdirects the completion of QCdata in the Earthwork Record System check the Earthwork Record System3-11 General RequirementsStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 12 Are an independent survey reference Identify the correct reference line such as: C/L Const.

6 , C/L Survey, B/L Const., B/L Survey DO NOT use edge of pavement, edge of shoulder, C/LPipe, etc. as a reference line3-12 Reference LinesStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 13 3-13 Reference LinesC ConstructionLC SurveyLNote that typically plan sets will a couple of Centerlines noted on them. You should use the same Centerline for a project. Be consistent. Student Manual Lesson 3 Earthwork Records System Version 1/15 3 14 Station 423 + 00 C/L Construction AheadStation 20 + 30 B/L Construction BackStation 423 + 00is the SAMEas Station 20 + 303-14 Station EquationsStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 15 What is the distance between S1 and S2?

7 B/L 423+55S2 Sta 330+77423+00424+00330+00424+28 Back329+60 AheadC/L EquationsMath Problem Work Area Student Manual Lesson 3 Earthwork Records System Version 1/15 3 16 3-16 Example: Split Graph coding Top HalfModifying Manual Lesson 3 Earthwork Records System Version 1/15 3 17 Example: Split Graph coding Top Half Match Line 3-17 Modifying PlotsProposed Top of EmbankmentPlan Elevations Verified by_____DLBPLOT Ver (FT)Elevation (FT)11+0012+0013+0014+0015+0016+ Project 123456789 Density- Embankment- non SISR 001, LEFT ROADWAY-TOP HALFBASE Top of EmbankmentMatch LineSH B .333SH SG . Manual Lesson 3 Earthwork Records System Version 1/15 3 18 3-18 Example: Split Graph coding Bottom HalfModifying Manual Lesson 3 Earthwork Records System Version 1/15 3 19 3-19 Example.

8 Split Graph coding Bottom HalfModifying PlotsPlan Elevations Verified by_____DLBPLOT Ver (FT)Elevation (FT)11+0012+0013+0014+0015+0016+ Project 123456789 Density- Embankment- non SISR 001, LEFT ROADWAY-BOTTOM HALFE xisting LineStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 20 3-20 Student Manual Lesson 3 Earthwork Records System Version 1/15 3 21 Modify the Plot in Case of Organic Matter/PlasticMaterial RemovalWhat is Organic Material?Organic material is any soil which has an average organic contentgreater than five ( ) percent, or an individual organic content testresult which exceeds seven ( ) organic soils, composed primarily of partially decayed organic matter, often dark brown or black in color with an odor of decay, and sometimes fibrous, shall be designated as Highly organic soils shall not be used within the subgrade or embankment portion of the PlotsStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 22 Removal of Organic Material- (Design Std.)

9 500- Sheet 1)3-22 Modifying PlotsRuralUrbanStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 23 3-23 Removal of Plastic Material- (Design Std. 500- Sheet 2)Modifying PlotsREMOVAL OF PLASTIC MATERIAL AND LOCATIONOF UNDERDRAIN IN URBAN CONSTRUCTIONREMOVAL OF PLASTIC MATERIAL ON DIVIDEDFREEWAYS, ARTERIALS AND MAJOR COLLECTORSHAVING FLUSH MEDIANS, AND, ON UNDIVIDEDARTERIALS AND MAJOR COLLECTORSD esign Standard 500, Sheet 2, states, more specially to underdrains, where frequency of median breaks indicates that it is impractical to leave plastic material in the median, the designer may elect to indicate total removal of this material.

10 If during construction it becomes apparent, due to normal required construction procedures, that it is impractical to leave the plastic material in the median, total removal of this material shall be approved by the Engineer. Student Manual Lesson 3 Earthwork Records System Version 1/15 3 24 Removal of Organic Material3-24 Modifying PlotsStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 25 Removal of Plastic Material3-25 Modifying PlotsStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 26 Other instances requiring modifying of the Plot- Change in Field Conditions- Modifying/Change in Structures- Change in Construction Techniques3-26 Modifying PlotsStudent Manual Lesson 3 Earthwork Records System Version 1/15 3 27 + + plots10 of fill due toelev.