CASE HISTORY. Unconventional Resources SlikPak . MECHANICAL INTEGRITY TESTING USING A BRIDGE PLUG APPLICATION. SlikPak Inflatable Retrievable Packer/Bridge Plug System for Slickline and Electric Line Location : Europe CHALLENGE : A storage cavern required a temporary bridge plug to be placed in the casing in order to support a full column of water and achieve casing inspection logging operations and pressure testing. SOLUTION: Ran an 11 in. inflatable bridge plug (IBP) on braided line using the SlikPak Plus inflation system. Set the plug at the end of the 13-3/8 in. injection casing at 1,658 ft. Filled the casing with fresh water and ran inspection logs. Pressure tested the 13-3/8 in. casing for 24 hours as required by regulations. Retrieved the IBP using braided line and restored the cavern to service. RESULTS AND BENEFIT: The entire operations were achieved on three wells SlikPak Plus without the need for a rig on Location .

Unconventional Resources | Drilling & Completions | Reservoir Optimization | Well Intervention www.tamintl.com The information and/or data in this publication is supplied solely for informational purposes and TAM International makes no guarantees or warranties, either expressed or implied, with respect

Tags:

  Europe

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Location Europe CHALLENGE - TAM International

1 CASE HISTORY. Unconventional Resources SlikPak . MECHANICAL INTEGRITY TESTING USING A BRIDGE PLUG APPLICATION. SlikPak Inflatable Retrievable Packer/Bridge Plug System for Slickline and Electric Line Location : Europe CHALLENGE : A storage cavern required a temporary bridge plug to be placed in the casing in order to support a full column of water and achieve casing inspection logging operations and pressure testing. SOLUTION: Ran an 11 in. inflatable bridge plug (IBP) on braided line using the SlikPak Plus inflation system. Set the plug at the end of the 13-3/8 in. injection casing at 1,658 ft. Filled the casing with fresh water and ran inspection logs. Pressure tested the 13-3/8 in. casing for 24 hours as required by regulations. Retrieved the IBP using braided line and restored the cavern to service. RESULTS AND BENEFIT: The entire operations were achieved on three wells SlikPak Plus without the need for a rig on Location .

2 The estimated cost reduction was in excess of $300,000 per well. Unconventional Resources | Drilling & Completions | Reservoir Optimization | Well Intervention The information and/or data in this publication is supplied solely for informational purposes and TAM International makes no guarantees or warranties, either expressed or implied, with respect to its accuracy, completeness or use. 2013 TAM International , 08/13.