Example: bachelor of science

Manual for Transmission Lines and Substation …

Manual for Transmission Lines and Substation construction and maintenance activities Volume I Best Management Practices Volume II Permits Prepared for Prepared by HDR Engineering, Inc 701 Xenia Avenue South, Suite 600. Minneapolis, Minnesota 55416. February 2007. Table of Contents Table of Contents IV. VOLUME I .. 1-1. BEST MANAGEMENT PRACTICE .. 1-1. 1-2. Scheduling .. 1-2. Plan and Profile .. 1-2. Cultural 1-3. Site Preparation .. 1-3. construction activities .. 1-4. Access Roads .. 1-4. Substation .. 1-5. maintenance .. 1-5. EROSION CONTROL.

Manual for Transmission Lines and Substation Construction and Maintenance Activities Volume I – Best Management Practices Volume II –Permits

Tags:

  Activities, Construction, Maintenance, Line, Transmissions, Substations, Transmission lines and substation, Transmission lines and substation construction and maintenance activities

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Manual for Transmission Lines and Substation …

1 Manual for Transmission Lines and Substation construction and maintenance activities Volume I Best Management Practices Volume II Permits Prepared for Prepared by HDR Engineering, Inc 701 Xenia Avenue South, Suite 600. Minneapolis, Minnesota 55416. February 2007. Table of Contents Table of Contents IV. VOLUME I .. 1-1. BEST MANAGEMENT PRACTICE .. 1-1. 1-2. Scheduling .. 1-2. Plan and Profile .. 1-2. Cultural 1-3. Site Preparation .. 1-3. construction activities .. 1-4. Access Roads .. 1-4. Substation .. 1-5. maintenance .. 1-5. EROSION CONTROL.

2 1-7. Preservation of Existing 1-8. Topsoil 1-10. Mulch, Blankets, and 1-10. Slope 1-13. Directional Tracking and 1-15. Soil Binders .. 1-15. Streambank 1-15. SEDIMENT CONTROL .. 1-17. Silt 1-17. Silt 1-17. Sediment 1-20. Sediment 1-20. Fiber 1-21. Check 1-21. Inlet 1-23. Street 1-23. Vegetative Buffer .. 1-23. construction Entrance and 1-26. Dust 1-26. VEGETATIVE 1-28. 1-29. 1-35. BMP Manual i February 2007. FINAL. Table of Contents Minnesota .. 1-37. Wisconsin .. 1-45. 1-49. Local Seed 1-49. STORMWATER TREATMENT .. 1-51. Infiltration 1-51.

3 Constructed Wetland .. 1-51. Retention and Detention Pond 1-51. GENERAL OPERATIONS .. 1-52. Residential 1-52. Highway and Road Crossings .. 1-52. Wetland 1-53. Stream and River 1-57. Trout 1-61. POLLUTION PREVENTION MANAGEMENT MEASURES .. 1-62. Spill Cleanup .. 1-62. Trash and 1-65. Hazardous Material .. 1-65. GENERAL PROVISIONS .. 1-66. maintenance .. 1-66. 1-68. Record Keeping and Reporting .. 1-68. List of Tables Table 1 Erosion Fabric Categories .. 1-12. Table 2 Slope Breaker 1-13. Table 3 Illinois Permanent Seeding Mixture .. 1-32.

4 Table 4 Iowa Temporary Seed Mixture .. 1-35. Table 5 Iowa Permanent Seed 1-37. Table 6 Minnesota Temporary Seed Mixture .. 1-40. Table 7 Minnesota Mixture 1-40. Table 8 Minnesota Permanent Seed 1-44. Table 9 Minnesota General Fertilizer 1-45. Table 10 Wisconsin Temporary Seeding Mixture .. 1-46. Table 11 Wisconsin Permanent Seed 1-47. Table 12 After construction BMP maintenance Activity and 1-66. BMP Manual ii February 2007. FINAL. Table of Contents List of Figures Figure 1 Dairyland Power Cooperative Service v Figure 2 Slope Breaker Diagram.

5 1-14. Figure 3 Illinois Soils Map .. 1-31. Figure 4 Iowa Soils 1-36. Figure 5 Minnesota Soils 1-39. Figure 6 Wisconsin Soils 1-48. Detail Sheets Detail Sheet 1 Access Road Typical Sections .. 1-6. Detail Sheet 2 Preservation of Existing 1-9. Detail Sheet 3 Silt 1-18. Detail Sheet 4 Silt Curtain .. 1-19. Detail Sheet 5 Fiber 1-22. Detail Sheet 6 Inlet Protection Type D .. 1-24. Detail Sheet 7 Inlet Protection Type C .. 1-25. Detail Sheet 8 construction Entrance and 1-27. BMP Manual iii February 2007. FINAL. Introduction INTRODUCTION. Dairyland Power Cooperative (Dairyland) is a generation and Transmission cooperative based in La Crosse, Wisconsin that provides wholesale electrical energy to 25 member cooperatives and 20 municipalities who deliver the energy needs to over 500,000 people.

6 1 Dairyland's service area comprises 62 counties in Illinois, Iowa, Minnesota, and Wisconsin (Figure 1). Dairyland owns and operates over 3,000 miles of Transmission line , over 200 distribution and Transmission substations , numerous communication sites, and generation and utility properties. Dairyland is committed to the preservation and protection of precious natural resources. This best management practice (BMP) Manual and field guide were created in acknowledgement of that commitment. This Manual will provide Dairyland staff, consultants, and contractors with a comprehensive source for BMPs related to earth disturbing activities during construction , repair, and maintenance work associated with Transmission Lines , substations , and other cooperative projects.

7 The associated field guide is a water-proofed version of this Manual , which summarizes key erosion and sediment control points for use by field crews. Federal and state environmental permit information was also included in this document for reference. These practices and procedures, when properly implemented, will minimize or prevent erosion and sediment pollution from adversely affecting sensitive resources, such as, streams, ponds, lakes, wetlands, and natural vegetative. Erosion and sediment control measures are generally recognized as a necessary component of large construction projects.

8 It is equally important to note that those same measures apply to all earthmoving activity, regardless of size or scope. The smallest Transmission line repair activity could change water temperature in nearby trout streams or transport noxious weeds across property Lines if crucial Erosion and sediment control measures apply to all earth BMPs are not applied where required. BMPs are, in fact, moving activities small or large required in some form for all activities to preserve sensitive resources, regardless of the project size. This BMP Manual provides a comprehensive reference source for BMPs for construction activities and environmental compliance/permit policies and procedures.

9 This Manual must be periodically updated to reflect changes in BMPs in regulatory policy and in enforcement trends affecting and/or influencing the activities of Dairyland. 1. McWilliams, John M, MBA, PE. Dairyland Power Cooperatives' Methane Digester Project, AgSTAR National Conference. Madison, Wisconsin, 2006. BMP Manual iv February 2007. FINAL. Minnesota Wisconsin Iowa Illinois Map Document: (N:\gisproj\DPC\41569\map_docs\mxd\SOILS \ ). F. 10/25/2006 -- 1:52:10 PM. Legend Figure 1. Illinois Minnesota Dairyland Power Cooperative Service Area Iowa Wisconsin Introduction All individuals working on construction projects are responsible for complying with permit requirements and the associated BMPs as designed and detailed in this Manual and further specified by the Project Manager within site plans.

10 If questions arise concerning environmental requirements, the Project Manager should interpret compliance requirements. If the Project Manager is not available or able to resolve an issue, Dairyland's Manager, Siting and Regulatory Affairs should be notified. Some construction projects may require additional local environmental permits that could contain additional requirements that may be more restrictive than those identified in this Manual . Compliance with local permit requirements is mandatory. This Manual is presented in two volumes.


Related search queries